1 Arizona Nuclear Power Project P.O. BOX 52034
- PHOENIX. ARIZONA 85072-2034 November 7, 1984 ANPP-31077 WFQ/TJB U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368 Attention:
T. W. Bishop, Director Division of Reactor Safety and Projects
Subject:
Response to IE Bulletin 83-07 and Supplements 1 and 2 File:
84-055-026; D.4.01.1
Reference:
(a) Letter f rom E. E. Van Brunt, Jr. to J. B. Martin, dated March 23, 1984 (b) Letter f rom T. W. Bishop to E. E. Van Brunt, Jr.,
dated May 11, 1984 This letter refers to the request for additional information as identi-fied in Reference (b).
Attached, please find the response to the Region V Staff review of the subject Bulletin concerning apparently fraudulent products sold by Ray Hiller, Inc.
Ue believe that this information is sufficient to resolve this issue and consider it closed.
Very truly yours, O
CLRA.
6 Lt U E. E. Van Brunt, Jr.
APS Vice President Nuclear Production ANPP Project Director EEVBJr/TJB/wpc Attachment
/fil cc:
R. Zimmerman ll P. Narbut 8
A. Gehr I
8411190319 840907 PDR ADOCK 05000528 G
g; e
r:
. r;,.;; :,7f 1
J Mr. T. W. Bishop
- ANPP-31077 Page-Two bec:
T. G. Woods,-Jr.
(W/ Attach).
-D. B. Karner W.
E.~ Ide D. B. Fasnacht
-A. C. Rogers.
L. A. Souza B. S. Kaplan-T.
D.' Shriver
~"
C. N. Russo J. Vorees J. R. Bynum-
- W. J. Stubblefield
~W. G. Bingham W. F.- Quinn S. R. Frost K. W. Cross D. Canady U."[55Nuc1'esE Comatision?(0riginal Copy)
~
Document Control Desk Washington D. C.-20555 7030A/2107A A
{
~,.
j r
~
s a
a
. Attachment A' j.
Region V S' aff Review of APS Response to IE Bulletin 83-07 '-
J t
- REQUESTED INFORMATION
- 1. --
Reference' (a) only refers to the initial ' bulletin ' of July 1983.
- Were. Supplement I and 2 issued s October 26,'1983 and-December 9,.
11983-included in the response?
1 s
Note:
. Supplements 1 and 2' list additional affected - companies
~
j
- including Combustion Engineering in Windsor, Ct.
t >
RESPONSE-
]-
Supplements 1 and 2 to Bulletin 83-07 were included in the Supplier Quality investigation program initiated.for Ray Miller, Inc.
4 i
i i
s t
l e
4 e
i i
e
-4. + - +
-4*
y
.wr m--.-
-,.,ry,.
..-,,,<,.~e,_mww._f,
,%,,...,.w.,---.%y-=--.-----y-r,w,-ww-------r--$--w-4 yw-.
s-,-',-r,-,,,,r.,-3-y,
--+-w
+v-,--e-
2
<+
~
A A
1,'b-'
4 i
j k
~
1 ANPP 31077
' Attachment AJ Page Two
_(Continued)
'2.
Reference (a)' states "The purchasing 'and receiving companies ' listed
'~
in (the subject Bulletin _ and ' the applicable ' PVNGS suppliers -were
. incorporated.' into - the overal1 ~ Supplier Quality ' Investigation. Pro-gram.
The investigation determined _that;nojRay Miller material has been supplied to:PVNGS.for use'in any safety-related systems."
- Please explain 1-how 1the " Supplier Quality -Investigation Program" functions, i.e., were ' APS ' suppliers solicited as ' to whether they had. received material from the: listed companies (as is requested by -
the footnote-on page 4;of. the bulletin)?
1 6
RESPONSE
The purchasing and receiving companies listed in the subject Bulle-tin and Supplements ; 1 ? and,2, along with other Palo ~ Verde Nuclear t
Generating: Station (PVNGS)f auppliers providing like materials,. were reviewed-by: Project Procurement for involvement, :and the applicable PVNGS suppliers were incorporated into the;overall Supplier Quality investigation program.
This program functions.as = described.
herein. 1.etters were sent to 'all of our. "Q" listed suppliers, _ both Home ' Office. and field procurement, whose scope of ~ work and supply could contain the materials listed in the bulletin and supple-ments.
It was requested that these suppliers review their procure--
ment activities to determine if they, or one of their sub-vendors,,
have utilized Ray Hiller, Inc. products for PVNGS.
It. has been determined that none of them' have supplied materials for "Q" class safety-related application for use on the Palo Verde Project.
~
-m
)y~
~..,
,j.;
t u
. r.
^
s 14 a
1 r
p '
Attachment A E
Page Threei
- (Continued)-
~
b 3.
'The bulletin, page 6, requested APS 'to' review ;the general concerns -
expressed by Bu11etins. 83-06 and 83-07 and respond.. Please' provide
-this. response.
c
- RESPONSE In response to>the general concerns expressed..by.IE Bulletins'83-06 and 83-07, ANPP has reviewed its ' programs for the control of '_pur.
ichased material, equipment and -services.. Although no cases of.
, supplier fraud Jwere. detected,. ANPP.is. refining ~ its vendor qualifi-cation process with ~ particular emphasis on the ~ early detection ; of hardware - related ~ deficiencies.
Areas that~ will be addressed include purchase. order requirements, source surveillance, personnel.
training, user tests, and receiving inspections.
ANPP management is aware of the significance of supplier fraud, as -
well as hardware deficiencies, and the impact they could have on PVNGS. operations.- l ANPF has : always. had an extensive program for monitoring supplier activities. at the supplier's facilities.
As nuclear orders have declined, suppliers have reduced the resources and attention paid ' to meeting. quality and specification require-ments. Because of the decreasing attention paid by the supplier to quality programs and inspection requirements, APS has increased its control and monitoring of suppliers..
- Attachment A' Page' Pour (Continued) 4 The. bulletin, E page 6,.' requested - information regarding APS staff time to perform the' review.. Can this be provided?
-RESPONSE Estimated. time to perform the~ review for Bulletin 83-07 was approximately 900 manhours.- This time includes ~ the efforts of Bechtel, Combustion Engineering and ANPP.
C= -
1 t,
,A s;
i.--
2 ANPP-31077.-
Attachment A Page Fivh
- (Continued).
5.-
'The: bulletin, page - 6,'. requested the original copy ~ of the response letter to -- be sent to ' the USNRC, Document Control. Desk,- Washington
'D.C.
The original was_, sent to the Region V Administrator.
The licensee is requested., to provide copies.as - requested in future Bulletin responses.
RESPONSE
RIPP will provide the original copy of future Bulletin responses to the USNRC, Document Control Desk, Washington D.C, as requested.