Special Rept 84-07:on 841004,mechanical Penetration Door A75 in Auxiliary Bldg Breached & Not Closed Out Until 841012. Caused by Conflict Between Breaching Permit Expiration Date & Time Breach Actually Made
ML20099B755
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 11/08/1984
From: Wallace P
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
84-07, 84-7, NUDOCS 8411190278
Download: ML20099B755 (2)


Text

r.

TENNESSEE VALLEY AUTHORITY Sequoyah Nuclear Plant Post Office ~ Box 2000

~ Soddy Daisy, Tennessee 37379 November.8, 1984' U.'S. Nuclear Regulatory Commission Document Control _ Desk Washington, DC 20555-

-Gentlemen: ,

t TENNESSEE ~ VALLEY AUTHORITY - SEQUOYAH NUCLEAR PLANT UNIT'2 - DOCKET.NO.

50-328 - FACILITY.0PERATING LICENSE DPR-79 SPECIAL REPORT 84 The enclosed special report provides details concerning a penetration fire barrier being . nonfunctional for a period in l excess of s~even days.

This report is submitted in accordance with Sequoyah; Unit 2 Technical Specifications 3.7.12 and'6.9.2. .

Very truly yours, TENNESSEE VALLEY AUTHORITY O.R.ludh -

P. R. Wallace-

. Plant Manager

' Enclosure

- cc (Enclosure) :

James P. O'Reilly, Director U.S. Nuclear Regulatory Commission Suite 2900 101 Marietta Street, NW Atlanta, Georgia 30323 Records Center Institute of Nuclear Power Operations Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30339 NRC Inspector, NUC PR, Sequoyah 1

i 8411190278 841108 I-DRADOCK05000g 1983-TVA SOTH ANNIVERSARY

. An Equal Opportunity Employer

, _ , m ,_

i a

f ..

SEQUOYAH NUCLEAR PLANT UNIT.2 s

-SPECIAL-REPORT 84-07

^

4- ,

FEvent-Description-Mechanical penetration door A75-in the auxiliary building (elevation 690)

~

was breached for. a period greatier; than'seven (7) days. The' penetration:

~

t was breached by Public Safety at) 1945 CST on 10/04/84,-Land was not clos'ed'

~

out until 1225 CST on 10/12/84.

Probable Cause The'. expiration date at thettop oflthe.Penetratica Fire ~ Barrier Breaching.

Permit (PFBBP)' was in conflict with the date and time the breach was

~ ~

actually made. .This caused confusion on the correct return-to-normal date.

9 Corrective Action ~

The ' expired permit was dicussed with the personnel involved, and the.

Operations Section Assistant Shift Engineers have been directed to perform a daily audit .of; the PFBBP book. . In addition, training ~

letters have been distributed to fire watch personnel.