Omaha Public Power District 444 South 16th Street Mall Omaha, NCbraska f;8102 2247 402/63G2000 July 24, l A LIC-92-20lR U. S. Nuclear Regulhtory Commission AT1N: Document Control Desk Mail Station Pl-137 Washington, DC 20555
Reference:
Docket 50 285 Gentlemen:
SUBJECT:
Fort Calhoun Station Quality Assurance file Room in accordance with 10 CFR 50.54(a)(3) Omaha Public Power District (0 PPD) is submitting a citrification to a commitment concerninq the qualifications of the fort Calhoun Station Quality Assurance (QA) Recorcfs Storage f acility.
This clarification could be interpreted as a reduction in a commitment, therefore, OPPD requests NRC approval prior to implementation.
10f1(llfICAT IRM.. CME OPPD wishes to clarify a commitment to ANSI N45 3.9 - 1979 contained in Appendix A of the Updated Eafety Analysis Repot (USAR) related to the wind loading requirements for the Fcrt Calhoun St a lon Quality Assurance file Room. ANSI N45.2.9 - 1979 requires that the QA records facility be constructed in a manner which protects the QA records frcm " natural disasters such as winds."
OPPD is preposing to revise Append!x A to clearly state the aaximum wind velocity that the QA file Room is designed to withstand.
EfASEN FDR CHAfg The QA file Roota at fort Calhoun Station currently is located within a Class I structure (Auxiliary Building) designed to withstand a tornado with a maximum wind velocity of 300 miles per hour (USAR Section 5.11.3.1. A new QA File Room has been constructed in the Administration Building)at tne fort Calhoun Station which is not a Class I structure.
As ANSI N45.2.9 - 1979 does not statt the design requirements for natural disasters, OPPD is proposing to define the design maximum wind velocity for the QA file Room as 110 mph. Approval of the clarification will allow use of the new QA file Room in the Administration Building.
s;nnna 9207310!65 920724
'a,]
ADOCK ODOO 5
P,DR I
. \\~
/ U) v Drecy reggcuawty 4s stra
/
w
e O. S. Nuclear Regulatory Commission LIC-92-20!R Page 2 l
BMIS FOR CONCLUSION THAT THE CHANGE SAUSFIES PREVIQUS CDMMITHENTS The{,oposedchanetoAppendixAoftheUpdatedSafetyAnalysisReport (USA will clari that the QA file Room can withstand a maximum wind velocsty of 110 rap.
The maximum wind velocity of 110 miles 1er hour was calculated for the new QA File Room based upon the Steel Deck, nstitute and Uniform Building Code criteria.
As stated in USAR Section 5.4.6, the fastest wind at the site location for a 100 year period of murrence is a 90 moh basic wind at 30 feet above ground level.
Therefor, the new QA File R90m is well within the design basis wind velocity requirements for the site location.
A QA File Room does not fulfill a safety related function and does not meet the criteria of Regulatory Guide 1.117 Tornado Design Classification, File Room is located within a Class I structure capable of
" as a structure required to withstand a tornado. Although the current QA withstanding the effects of a tornado, it is OPPD's position that there-are no rcquirements in ANSI N45.2.9 - 1979 for a QA File Room to withstand tornados.
Therefore, OPPD has concluded that the QA File Room will continue to meet the requirements of 10 CFR Part 50, Appendix 8, Section XVil, on the storage of quality assurance records.
Attached is a proposed marked-up change to Appendix A of the USAR.
If you should have any questions, please contact me.
Sincerely, i(q5 11Ao.o W. G. Gates Division Manager Nuclear Operations WCG/sel Attachment l
c:
LeBoeuf, Lamb, Leiby & MacRae l
J. L.-Milhoan, NRC Regional Administrator, Region IV l
R. P. Mullikin, NRC Senior Resident inspector L
S. D. Bloom, NRC Acting Project Manager 1
i
> =, - - -
- + +,,.
.,-e
, ~ ~.
.m
,,--v--,
,,-em,v,
,,--mn.,
--mr--
-,-..,u-,,ma n
...m.
,~,
-w,,
,-=--
4
a H.
Standard:
" Qualifications of Inspection Excmination, and Testing Personnel for Nuclear Power Plants ILquin. tory Guide:
RG 1.58, Revision 1, " Qualification of Nuclear j
Power Plant inspection, Examination and Testing Personnel" 611thn: OPPD's OA Program and QA Plan comply with the applicable requirements of this standard and Regulatory Guide with the following alternatives or exceptions:
1.
OPPD and contractor inspectors performing Quality Control inspections are certified in accordance with this standard; however,l these certification requirements are not applied to personne performing operational surveillance testing and inspection in accordance with the Technical Specifications, to investigative inspections or to the conduct of preliminary inspections for purpose of planning corrective or improvemer.t actions, or to the surveillance of plant operations to verify compliance with procedures.
Certification of inspectors for nondestructive exatninations is accomplished in accordance with SNT-TC 1A guidelines.
1.
Standard:
ANSI N45.2.8-1975, " Supplementary Quality Assurance Requirements for Installation, inspection and Testing of Mechanical Equipment and Systems for the Construction Phase of Nuclear Power Plants" kqulatory Guide:
RG 1.116, Revision 0,
" Quality Assurance 4equirements for installation, inspection and Testing of Mechanical Equipment and Systems"
)ol.1 LOD:
The applicable requirements of this standard and i
legulatory Guide are implemented for modification activities which meet or exceed original plant specifications and manufacturer's recommendations, as described in the QA Plan.
J.
StatLQa 4: ANSI N45.2.9-1974, " Requirements for Collection, Storage and Maintenance of Quality Assurance Records for Nuclear Power Plants" k91tlatory Guide:
RG 1.88, Revision 2, " Collection, Storage, and aiaintenance of Nuclear Power Quality Assurance Records" blition: OPPD's QA Program and QA Plan comply with the applicable requirements of thi! standard and Regulatory Guide with the following alternatives or exceptions:
1.
The Fort Calhoun Station File Room meets the criteria of NUREG-0800, Standard Review Plan, Part 17.1, Acceptance Criteria 17.4, Alternative (3); ANSI N45.2.9-1979; and NFPA 232; and will withstand'a maximum' wind' velocity of 110~ miles
~
per hour.
2.
Fire rated file cabinets used for interim record storage meet a one hour or greater fire rating.
A-30 R4 7/89
.