Forwards Rev 1 to Physical Security Plan for Protection of SNM of Low Strategic Significance.Rev Resolves Open Item 50-482/8413-01 of Insp Rept Transmitted by .Rev Withheld (Ref 10CFR73.21)
ML20098H250
Person / Time
Site: Wolf Creek 
Issue date: 07/25/1984
From: Koester G
KANSAS GAS & ELECTRIC CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
KMLNRC-84-122, NUDOCS 8409120256
Download: ML20098H250 (5)


Text

p-KANSAS GAS AND ELECTRIC COMPAhY

~

THE ELECTAC COMPANY CLENN L.

KOESTER vH:t petscEper-souc. EAR July 25, 1984 Mr. J.T. Collins, Regional Administrator U.S. Nuclear Regulatory Commission 5MN$$ bD135hlLl@

Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 II$ @3T N M E9 M

@E'lZf l7;TIWiFdjj{ig KMLNRC 84-122 Re:

Docket do. STN 50-482 Ref: Letter dated May 25, 1984 from MIJohnson, NRC, to GLKoester, KG&E Subj: Wolf Creek Interim Security Plan

Dear Mr. Collins:

In accordance with 10CFR50.54(p), furnished herewith are five (5) copies c,f Revision 1 to the WCGS Physical Security Plan for the Protection of Special Nuclear Material of Low Strategic Significance Prior to Obtaining an Operating License (Interin Security Plan). describes the reason for each change and why these changes do not decrease the safeguards effectiveness of this plan.

This submittal resolves Open Item 50-482/8413-01 of the Inspection Report transmitted by the Reference.

The previously transmitted copies of this plan are superseded in their entirety by the attached copies.

The attached document contains Safeguards Information in accordance with 10CFR73.21 and therefore should be withheld from public disclosure.

This letter, when separated from the attachments, does rx>t conLain Safeguards Information and shculd be handled as decontrolled.

Acknowledgement of receipt of this letter would be appreciated.

8409120256 840725 I

PDR ADOCM 05000482 y:

{}l d

GLK:bb

/

Attach xc: HPDenton, w/a WHEN SEPARATED FROM PO'Connor, w/o (2)

ENCLOSURES. HANDLE HBundy, w/o THIS DOCUMENT AC SJBrown, w/o DECONTROLLED JKelly, w/o h

L

+.

OATH OF AFFIRMATION STATE OF KANSAS

)

) SS:

COUNTY OF SEDGWICK )

I', Glenn L. Koester, of lawful age, being duly sworn upon oath, do depose, state and affirm that I am Vice President - Nuclear of Kansas Gas and Electric Company, Wichita, Kansas, that I have signed the foregoing letter of transmittal, know the contents thereof, and that all statements contained therein are true.

KANSAS GAS AND ELECTRIC COMPANY By 9/M

/

Glenn L. Koester Vice President - Nuclear E.D. Prothro, Assistant Secretary STATE OF KANSAS

)

) SS:

COUNTY OF SEDGWICK ).

BE IT REMEMBERED that on this 25th day of Julv, 1984

, before me, Evelyn L. Fry, a Notary, personally appeared Glenn L. Koester, Vice President - Nuclear of Kansas Gas and Electric Company, Wichita, Kansas, who is personally known to me and who executed the foregoing instrument, and he duly acknowledged the execution of the seme for and on behalf of and as the act and deed of said corporation.

,,,.......,,IN WITNESS WIIEREOF, I have hereunto set my hand and affixed my seal the pf',g i; dhte and year above written,

'.7.,,..

j y

g_.

I:

UCV c Eflyn[.Fq,No n

$*.,p,f '.

,#e f

  • ..i F,,My; Commission expires on August 15, 1984.

j

,7

e --

ATTACENEtfP 1 Pages/ Sections Affected Reason for Change / Justification 2/1.2.5.4, Reason for Change 3/1.2.5.5,

'Ibe 2047' 6" level was changed to the 2047' level to be 6/1.2.9 c:msistent throughout the report.

Justification No program change has been made.

2/1.2.5.4 Reason for Change Response 4 of M4INRC 82-261 has been incorporated into the plan as required to close out Open Item 50-482/8413-01 of the Interim Security Plan Audit Report transmitted by the reference. In addition, the Revision of the Security Plan referenced has been updated.

Justification No program change has been made.

3/1.2.5.5 Reason for Caange Response 5 of M4LNRC 82-261 has been incorporated into the plan as required to close out Open Item 50-482/8413-01 of the Audit Report.

In addition, the response was updated to reflect the current organization and fuel building access program.

Justification These changes do not reflect a reduction in the effectiveness of the Interim Security Plan for the following reasons. 1) The Plant & nager perfonns the same duties as the old Plant Superintendent. 2) The revisions to the fuel building access program do not affect the function of the program.

4/1.2.6 Reason for Change This change provides additional information to the plan.

Justification The change provides an increase in the effectiveness of the plan by providing an added ccmnitment.

Mi M 5fdf.3I.Elt325 E 0 WHEN SEPARATED FROM ENCLOSURES, HANDLE fifliIAIT MEM THIS DOCUMENT AS ying]Ff MTill@gy]q)

DECONTROLLED.

~.

6

.9 ATININENT 1 (Continued)

Page/ Sections Affected Reason for Change / Justification 4,5/1.2.8 Reason for Change

- 12/ 3.4.10 Response 1 of KMINRC 82-261 has been incorporated into the plan as required to close out Open Iten 50-482/8413-01 of the Audit Report.

Justification No program change has been made.

5,6/1.2.9 Reason for Change Response 3 of KMINRC 82-261 has been incorporated into the plan as required to close out Open Item 50-482/8413-01 of the Audit Report.

Justification No program change has been made.

6/2.2.1.

Reason for Change Response 2 of K4INRC 82-261 has been incorporated into the plan as required to close out Open Item 50-482/8413-01 of the Audit Report.

Justification No program change has been made.

6/2.2.1.1 Reason for Change Response 6 of KMINRC 82-261 has been incorporated into the plan as required to close out Open Item 50-482/8413-01 of the Audit Report.

In addition, the response w s revised to reflect changes in the personnel logging procedure for the area.

Justification The revision does not reflect a reduction in the effectiveness of the Interim Security Plan since access to the area is controlled and the area is within the view of a watchnan at all times when personnel are present.

7/2.2 1.13 Reason for Change 8/2.2.7 The title Plant Superintendent has been chargel to Plant 9/ 3. 3.1 Manager.

10/3.3. 3.3 Justification 11/ 3.4.1 The Plant thnager performs the sane duties as the old Plant Superintendent. No program change has been made.

'lMi[WN52 0$55 WHEN SEPARATED FROM ENCLOSURES, HANDLE (iTI) f#ll MN@d THIS DOCUMENT AS pigge W F3Mfi4ff@ygl DECONTROLLED.

r

[

W'

- ATTA0NENP 1 (Continued)

Page/ Sections Affected Reason for Change / Justification

-8/2.2.5.2 Reason for Change Response 7 of ININRC 82-261 has been incorporated into the plan as required to close out Open Iten 50-482/8413-01 of the Audit Report.

Justification No program change has been made.

9/ 3.1. 2.2 Reason for Change Response 8 of IMINRC 82-261 was modified by ININRC 83-007. 'Ihe modified response has been incorporated into the plan as required to close out Qoen Item 50-492/8413-01 of the Audit Report.

Justification No program change has been made.