Responds to Generic Ltr 84-15, Proposed Staff Actions to Improve & Maintain Diesel Generator Reliability. Mods to Engine Prelube & Lube Oil Injection Sys Under Investigation
ML20098E953
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 09/26/1984
From: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
REF-GTECI-A-44, REF-GTECI-EL, TASK-A-44, TASK-OR GL-84-15, NUDOCS 8410020168
Download: ML20098E953 (8)


Text

.

BALTIMGRE GAS AND ELECTRIC CHARLES CENTER P. O. BOX 1475. BALTIMORE, MARYLAND 21203 ARTHUR E. LUNDVALL. .JR.

v.cc paes='"

September 26,1984 sumv U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D.C. 20555 A 4TENTION: Mr. Darrell G. Eisenhut, Director Division of Licensing

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2, Docket Nos. 50-317 & 50-318 Generic Letter 84-15; " Proposed Staff Actions to Improve and Maintain Diesel Generator Reliability" Gentlemen:

The enclosure and accompanying attachment provided herein constitute our reply to your request for information made in Generic Letter 84-15. Enclosure (1) is a discussion of and reply to your specific items and questions. One table is provided in Enclosure (1) and has been segregated in a manner that reflects the specific concerns of item 2 in Generic Letter 84-15.

Pending safety committee review, we plan to submit a proposed Technical Specification change involving diesel generators. The requested change is proposed not only on behalf of previous commitments to Generic Letters 83-28 and 83-41, but to ensure the reliability of the emergency diesel generators installed at our facility is maintained.

Considering the critical role diesel generators play in mitigating various transients and postulated events following a loss of offsite power, we feel diesel generator reliability is important to the early solution to USI A-44, Station Blackout. It is our judgment that timely actions regarding diesel generator reliability will have a significant safety benefit, f

9 0\

8410020168 840926 PDR ADOCK 05000317 PDR i s)

P

l Mr. Darrell G. Eisenhut September 26,1984

Page 2 h

l Should you have further questions regarding this reply, please do not hesitate to contact us.

Very truly yours, f.

,.l, y ydw- -

O' \

AEL/SRC/ms Enclosure (1)

STATE OF MARYLAND :

TO WIT:

CITY OF BALTIMORE :

Arthur - E. Lundvall, Jr., being duly sworn states that he is Vice President of the Baltimore Gas and Electric Company, a corporation of the State of Maryland; that he provides the foregoing response for the purposes therein set forth; that the statements made are true and correct to the best of his knowledge, information, and belief; and that he was authorized to provide the response on behalf of said Corporation.

WITNESS my Hand and Notarial Seal:

nh Public

[ Notary '

< dwt /

My Commission Expires: N6 u/ /[<[d

(/ I' '

l ENCLOSURE 1 REPLY TO NRC GENERIC LETTER 84-15 NRC REQUEST

1. Reduction in Number of Cold Fast Start Survelilance Tests for Diesel Generator1 This item is directed towards reducing the number of cold fast start surveillance tests for diesel generators which the staff has determined results in premature diesel engine degradation. Licensees are requested to describe their current programs to avoid cold fast start surveillance testing or their intended actions to reduce cold fast star: surveillance testing for diesel generators.

BG&E RESPONSE Based on maintenance experience at our facility and studies performed in reply to Generic Letter 83-41 (Fast Cold Starts of Diesel Generators), we feel that frequent fast cold starts and excessive surveillance testing of the diesel generators have the potential to cause undue wear and damage to moving parts and thereby degrade safety. As stated in the Generic Letter, industry experience shows that an overall improvement in diesel engine availability can be gained by performing diesel starts for surveillance testing using engine prelube and other manufacturer recommended procedures. Accordingly, we have studied various options and discussed them with our vendor. A short term solution has been provided by performing engine prelubrication prior to every start except those specifying ambient starting conditions in the Technical Specifications. Of a long term

. nature, our staff is evaluating modifications to the diesel lube oil system designed to ensure a prelubed condition upon fast start. This would eliminate cold fast starts and improve overall reliability. There are two modifications undergoing analysis and

evaluation.

(1) Engine prelube system designed to maintain continuous warm tube oil flow through the diesel generator when shutdown. This modification is intended to lubricate the lower internals up to the upper crankline.

(2) Lube oil injection system designed to instantly lubricate upon demand.

This modification uses pressure from the air start system and a bladder-type container to inject at high pressure oil into the engine when air start system demand is actuated.

We currently have an installed lube oil heating system performing continuous lube oil warm-up. We are considering a modification that would increase the lube oil heating capacity to limit the effects of ambient starting by raising the lube oil temperature to a level approximating normal loaded conditions.

'1

-3 ENCLOSURE 1 REPLY TO NRC GENERIC LETTER 84-15 l

l Consistent with.the concern eroressed in NUREG/CR-0660, and Generic Letters 83-41 l

-and 84-15, we. too _have been 'm restigating the impact of needless diesel engine test J

starts. .Our staff has changed several Surveillance Test Procedures (STP's) to minimize

- the amount _ of surveillance - testing. We previously had two separate STP's testing the diesel : generator. under Technical Specification- requirements for verification of

. operability and under-voltage starts. These have since been combined into one.

i procedure, eliminating many redundant requirements.

-In review of NUREG-1024 and Generic Letter 83-28 " Required Actions Based on Generic Implications of Salem ATWS Events", we have committed to reviewing those Technical

-Specifications -which potentially degrade safety. Certain required surveillance tests, testing . frequencies,'ard action statements have been determined to be performance

degrading. We have ideitified several Technical Specifications that impose n edless test starts _ano
accordingly, are developing proposed amendments to those previously mentioned.~ For examplej Technical Specification 3/4.8.I' offers many opportunities to relax - needless diesel generator testing. In our proposed Technical Specification

-amendment (to be submittei after safety committee review), we are developing changes to the requirement to demon.-trate diesel generator operability from one hour to eight or 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (depending on circumstanceOfter entering the action statement. . v'dition,

- we are requesting deletion of the retest requirement every eight hours until the other AC power source is restored.' Deletion of this requirement along with the extended time to Everify operability will reduce the number of needless safety-degrading diesel starts.

Concurrent with our changes proposed for the action statements, we have identified seas to be modified in_the Surveillance Requirements. - We are requesting a change to Surveillance P.equirement 4.8.1.1.2.a that eliminates the-term Staggered Test Basis to ensure that diesel generators (including the common unit) are not tested more often than the intent 'of the Technical Specifications. We have deleted the requirement in Technical uSpecification 4.8.1.1.2.a.4 that specifies starting the diesel each time under ambient

conditions, and as recommended in Generic Letter 84-15, we have proposed adding a new item that requires testmg under ambient conditions every 184 days instead. We feet

.these changes to our Technical Specifications will significantly reduce unnecessary fast cold starts.

NRC REQUEST

2. Diesel Generator' Reliability Data This _ item requests licensees to furnish the current reliaMiity of each diesel generator at their plants, based on surveillance test data. Licensees are requested to provide the information requested in Enclosure 2 of Generic Letter 84-15.

w

ENCLOSURE 1 REPLY TO NRC GENERIC LETTER 84-15 BG&E RESPONSE Table 2-1 in Attachment I to Enclosure 1 provides the reliability data requested. As this data indicates, we have established a high level of diesel generator reliabitity, and we feel our current practices are a considerable success.

In addition to the reliability information requested, we have evaluated surveillance test data provided to the NRC in a letter to R. A. Clark, from A. E. Lundvall, Jr., dat;J October 7,1951, addressing USI A-44, Station Blackout. All valid demands between 1976 and 1980 inclusive were analyzed and the results showed that each individual diesel generator had a start reliability greater than 95%. Over a period of five years, each diesel generator attained an average reliability of 98%, with the lowest eliability for an individual diecel unit in a single year reaching 96.7%. While continually monitoring diesel generator. surveillance test data, if our reliability should fall below 95%, we would impose a reliability improvement program designed to raise the level of reliability to 95% or greater. This program is discussed further in Item 3.

NRC REQUEST

3. Diesel Generator Reliability Licensees are requested to describe their program, if any, for attaining and maintaining a reliability goal for their diesel generators. An example of a performance Technical Specification to support a diesel generator reliability goal has been provided by the staff in Enclosure 3 to Generic Letter 84-15. Licensees are requested to con. ment on, and compare their existing program c,c any proposed program with the example performance specification.

BG&E RESPONSE Our goal is te maintain all diesel generators at or above a reliability of 95%. We have initiated a program to monitor diesel generator operations and testing to record results of all valid demands (defined in Regulatory Guide 1.108, Position C.2.e.). If an individual diesel generator reliability should fall below 95%, we will impose a program to improve reliability. That program is described in Attachment 2.

Part of our overall effort to maintain reliability was explained in response to item 1. As stated in that response, we are committed to proposing changes to the Technical Specificatio ns aimei at eliminating unnecessary diesel generator testing. As mentioned in that item, we are considering diesel engine modifications that minimize the affects of cold fast starts.

In addition to our committments made in Item I, we have other mechanisms in place to help maintain our high reliability. We routinely review all mechanical Surveillance Test and Preventive Maintenance procedures for their applicability and intent. Our diesel engine vendor periodically provides suggested practices and programs for operation. We maintain communications with our diesel engine manufacturer to keep up to date on equipment changes and problems. We perform complete mechanical inspections every cycle which require a qualified factory representative on hand to assist and advise.

s m

.n ENCLOSUREI REPLY TO NRC GENERIC LETTER 84-15 We record and. maintain data .and results from testing required in the Technical

' Specifications,' and will trend them over time, providing a valuable . tool to evaluate projected diesel generator reliability. This parameter trending program will help predict

.. potential problems- before they become irreversable. The STP's we discussed in our response to item 1 c.re the Surveillance Requirements that provide the trending data.

NUREG/CR-0660, " Enhancement of On-Site Emergency Diesel Generator Reliability",

has many recommendations for licensees to improve their diesel generator reliability.

We 'have been . evaluating the recommendations and have implemented some changes.

- Additionally, much of the philosophy contained in the NUREG has been adopted at our

~

facility. We project a completion date for review of all racommendations in the NUREG by January 31,.1985. At that time we may decide to c.ake additional modifications to

. enhance diesel generator reliability.

All' of the previously mentioned projects, proposals, and programs are part of our comprehensive diesel generator reliability program. We have compared cur program and philosophy with the example performance specification provided in Generic Letter 84-

-15. ' Although the performance specification utilizes many concepts similar to ours, there

- exists some elements that differ substantially with 'our philosophy. The performance

- specification apyars to be 'more punitive than constructive. We feel a reliability program should attempt to identify the incipient causes of failure and provide assurance of reliability. In our judgment, the example reliability improvement program requires excessive testing beyond what we feel is necessary. There appears to be little flexibility for -staff action and even fewer mechanisms available allowing a timely solution to reliability problems. We agree that the frequency'for diesel generator testing must be

. increased when reliability becomes unacceptable to ensure the correct c.auses were identified and corrected. However, accelerated testing is a trade-off made in NUREG/CR-0660 which must be controlled to minimize excessive diesel generator starts. It is our judgment that the increased frequency of testing required by the example performance specification will degrade rather than enhance safety. Those sections of the example Technical Specification that limit diesel generator tests and allow engine prelubrication and/or . warm-up agree with our concerns and the manufacturer's recommendations. Accordingly, we are proposing such changes to our Technical Specifications.

t

I ATTACHMENT 1 TO ENCLOSURE 1 TABLE 2-1 *

  1. OF PERCENT # OF PERCENT # OF PERCENT FAILURES RELIABILITY FAILURES RELIABILITY FAILURES RELIABILITY I Last 20 Valid Demands
  • 0 100 1 95 0 100 Ltst 100 Valid Demands 3 97 3 97 0 100 i NO.11 DIESEL GENERATOR l L:st 100 Valid Demands - August 9,1983 - June 1,1984 FAILURE TIME HISTORY August 17,1983 Diesel Generator failed to reach rated speed and voltage within 10 seconds on start January 12,1984 Diesel Generator failed to reach rated speed and voltage within 10 seconds upon start January 12, 1984 Diesel Generator failed to reach rated speed and vologe within 10 seconds upon start l Last 20 Valid Demands - March 5,1984 - June 1,1984 No Failures NO.12 DIESEL GENERATOR Last IOC Valid Demands - September 9,1983 - June 1,1984 l FAILURE TIME HISTORY l

l September 27,1983 Failure to reach rated speed and voltage within 10 seconds upon start November 14,1983 Failure to reach rated speed and voltage within 10 seconds upon start April 4,1984 Failure to reach rated speed and voltage within 10 seconds upon start l Last 20 Valid Demands - March 11,1984 - June 1,1984 April 4 .984 Failure mentioned above No. 21 DIESEL GENERATOR Last 100 Valid Demands - June 22,1983 - June 1,1984 No Failures Last 20 Valid Demands - February 15,1984 - June 1,1984 No Failures NOTES All start attempts mentioned above were failuies because the diesel generator did not attain rated speed and/or voltage within 10 seconds. It should be noted that the diesel generators did start and did reach rated voltage and speed only a few seconds after the required time.

I s'

ATTACHMENT 2 TO ENCLOSURE 1 DIESEL GENERATOR RELIABILITY IMPROVEMENT PROGRAM

1. If a diesel generator has two failures in the last 20 valid demands
  • but less than six failures in the last 100 valid demands, then the testing frequency will be increased to at least once per week until the number of failures in the last 20 valid demands is less than two. All failure causes and corrective actions will be reviewed.
2. If a diesel generator has three or more failures in the last 20 valid demands or six or more failures in the last 100 valid demands, the General Supervisor - Operations shall review the causes and corrective action of all failures in the last 100 valid demands and approve a program of accelerated testir.g and/or inspection as appropriate to address the nature of the failures. The results af this program will be presented to the Plant Operations & Safety Review Committee (POSRC).
3. If a diesel generator has 10 or more failures in the last 100 valid demands it will be declared inoperable. Prior to returning the diesel generator to service, the POSRC will review the causes and corrective actions for all failures in the last 100 valid demands and prescribe a program of testing and/or inspection as it deems necessary.

NOTE: All start attempts (valid demands) shall be logged and maintained in accordance with Position C.3 of Regulatory Guide 1.108.

  • Criteria for determining the number of failures and valid tests shall be in accordance with Position C.2.e of Regulatory Guide 1.108.

l