Category:CORRESPONDENCE-LETTERS
MONTHYEARML20138H3831999-10-25025 October 1999 Forwards Draft Model of Renewed License for Calvert Cliffs, Unit 2 to Illustrate How List of Minimum Requirements Could Be Incorporated Into License Condition ML20217M9991999-10-22022 October 1999 Forwards Response to NRC 990930 RAI Re Void Swelling Degradation Mechanism,Per License Renewal Application for Ccnpp,Units 1 & 2 ML20217M1721999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept Form Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20212M2631999-10-0404 October 1999 Informs That Staff Concluded That Licensee Responses to GL 97-06 Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Calvert Cliffs Nuclear Power Plant ML20216J8671999-10-0101 October 1999 Forwards Rev 52 to QA Policy for Calvert Cliffs Nuclear Power Plant. Rev Accurately Presents Changes Made Since Previous Submittal,Necessary to Reflect Info & Analyses Submitted to NRC or Prepared,Per to NRC Requirements ML20212J7811999-09-30030 September 1999 Requests That Licensee Address Potential Aging Mgt Issue Re Effects of Void Swelling of Rv Internals by Making Plant Specific Commitment to Implement Focused age-related Degradation Insp for Evidence of Void Swelling in Future ML20212J5611999-09-29029 September 1999 Informs That on 990916,NRC Completed mid-cycle Plant Performance Review of Calvert Cliffs.No Areas in Which Util Performance Warranted Addl Insp Beyond Core Insp Program Identified.Historical Listing of Plant Issues,Encl ML20216H7831999-09-28028 September 1999 Forwards Addl Info Re NRC SER for Ccnpp,Units 1 & 2,per License Renewal Application ML20212D5361999-09-20020 September 1999 Forwards Rev 1 to Calculation CA04048, Fuel Handling Accident During Reconstitution, as Agreed During 990909 Telcon ML20212C1861999-09-15015 September 1999 Requests That NRC Complete Review of TR CED-387-P,Rev 00-P, Abb Critical Heat Flux Correlations for PWR Fuel, by 000201.Util Expects to Use ABB-NV Correlation for Current non-mixing Vane Fuel in Reload Analyses in 2000 for Ccnpp ML20212A2001999-09-0808 September 1999 Forwards Insp Repts 50-317/99-06 & 50-318/99-06.Two Violations Being Treated as Noncited Violations ML20211N8971999-09-0707 September 1999 Responds to Ltr to D Rathbun of NRC Dtd 990720,in Which Recipient Refers to Ltr from Wc Batton Expressing Support on Renewal Application of Baltimore Gas & Electric Co for Calvert Cliffs Plants ML20211H9841999-08-31031 August 1999 Provides Comments Re Data Entered in Rvid for Ccnpp,Units 1 2,per GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML20211K3091999-08-27027 August 1999 Informs That During 990826 Telcon,L Briggs & B Bernie Made Arrangements for NRC to Inspect Licensed Operator Requalification Program at Calvert Cliffs Npp.Insp Planned for Wk of 991025 ML20211J1611999-08-17017 August 1999 Documents Bg&E Consultations with MD Dept of Natural Resources Re Potential Impacts to Chesapeake Bay Critical Area & Forest Interior Dwelling Bird Habitat,Per Ccnpp License Renewal.Telcons Ref Satisfy Consulting Requirement ML20210V1181999-08-17017 August 1999 Forwards Toxic Gases Calculations for Control Room Habitability,As Discussed During 990713 Telcon.Util Will Make Final Submittal for Toxic Gases After NRC Has Completed Review of ARCON96 ML20210T5061999-08-16016 August 1999 Forwards Rev 0 to Ccnpp COLR for Unit 2,Cycle 13, Per Plant TS 5.6.5 ML20210U2761999-08-13013 August 1999 Forwards Listed Info Re Guarantee of Payment of Deferred Premiums for Ccnpp,Units 1 & 2,IAW 10CFR140.21 Requirements ML20210S8101999-08-12012 August 1999 Forwards Application Requesting Renewal of License for Mv Seckens,License SOP-10369-2.Without Encl ML20210S8131999-08-12012 August 1999 Forwards Summary of Various Open Licensing Actions for Bg&E That Were Completed During Unit 2 Refueling Outage Ending 990506 ML20210S7901999-08-12012 August 1999 Forwards semi-annual Fitness for Duty Program Performance Data for Period of 990101-990630,IAW 10CFR36.71(d) ML20210Q1941999-08-11011 August 1999 Informs That Info Submitted in 981130 Application Re CEN-633-P,Rev 03-P,dtd Oct 1998,marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20210N5881999-08-0606 August 1999 Forwards ISI Rept for Ccnpp,Unit 2,fulfilling Intentions & Requirements Stated in Program Plan & Commitment to Comply with ASME Code Section XI ISI Requirements ML20210N5471999-08-0505 August 1999 Requests That License SOP-10031-3,for DF Theders,Be Removed from Active Files for Ccnpp,Due to Individual Being Reassigned to Position No Longer Requiring License ML20210N5491999-08-0505 August 1999 Requests That License SOP-10371-2,for RW Scott,Be Renewed IAW 10CFR55.57.Individual Has Satisfactorily Discharged License Responsibilities Competently & Safely.Without Application ML20210N1291999-08-0505 August 1999 Forwards NRC Response to W Batton Ltr Expressing Support of Renewal Application for Calvert Cliffs Plants as Requested in Ltr ML20210N9291999-08-0404 August 1999 Forwards Clarification to Initial Response to Biennial Rept on Status of Decommissioning Funding,As Required by 10CFR50.75(f)(1) ML20211C0951999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise Held on 990714 ML20211B5381999-07-30030 July 1999 Expresses Appreciation for Support in Y2K Training & Tabletop Exercise Held on 990714.Suggests Referral to NRC Y2K Web Site to View Issues & Lessons from Tabletop That Will Be Tracked by NRC ML20210J0741999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise on 990714.Suggests Referral to NRC Y2K Web Site to View Issues & Lessons from Tabletop That Will Be Tracked by Nrc.Web Site Should Reflect Info within 2 Wks ML20211C3251999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise Held on 990714 ML20210E4941999-07-23023 July 1999 Informs That 1999 Emergency Response Plan Exercise Objectives Is Scheduled for Wk of 991025.Exercise Scenario Will Test Integrated Capability & Major Portion of Elements Existing within Emergency Response Plan ML20210D0911999-07-22022 July 1999 Responds to to Chairman Jackson Referring to Ltr from New 7th Democratic Civic Club,Inc.Forwards Staff Response to W Batton,President of New 7th Democratic Civic Club,Inc ML20210C5011999-07-21021 July 1999 Informs That SL Walters,License OP-10096-3 & CC Zapp,License Number SOP-2188-9,have Been Reassigned within Organization & No Longer Require NRC License,Per 10CFR50.74(a).Removal of Subject Licenses from Active Files for Ccnpp,Requested ML20210A5021999-07-20020 July 1999 Responds to ,Expressing Support for Renewal of Operating Licenses for Calvert Cliffs Plant & to Concerns Re Lack of Specificity for License Renewal Regulations & Length of Time Set Aside for Public Comment ML20211N9101999-07-20020 July 1999 Forwards Correspondence Author Received from New 7th Democratic Club Civic,Inc Raising Some Serious Concerns About Renewal of Nuclear Reactor Licenses for Calvert Cliffs Power Plant ML20210C2681999-07-20020 July 1999 Forwards Certified Copy of Listed Nuclear Liability Policy Endorsement,Per 10CFR140.15(e) ML20210C8461999-07-19019 July 1999 Informs That CF Farrow,License OP-10648-1,will No Longer Be Employed with Bg&E,As of 990709,per 10CFR50.74(a).Removal of Subject License from Active Files for Ccnpp,Requested ML20209J5171999-07-16016 July 1999 Forwards Comments from Accuracy Review of License Renewal Application SER ML20210B7651999-07-15015 July 1999 Forwards SER Denying Licensee Proposed TS Amend Dtd 981120, to Delete TS Requirements for Tendon Surveillance & Reporting Because TS Requirements Duplication of Requirements in 10CFR50.55a.Notice of Denial Encl ML20209G2081999-07-13013 July 1999 Forwards Insp Repts 50-317/99-05 & 50-318/99-05 on 990509- 0626.No Violations Noted ML20210A6311999-07-0606 July 1999 Discusses Closure of TACs MA0532 & MA0533 Re Response to Requests for Addl Info to GL 92-01,rev1,suppl 1, Reactor Vessel Structural Integrity, for Plant,Units 1 & 2 ML20209C1391999-07-0202 July 1999 Forwards Responses to Open & Confirmatory Items Based on Review of SER for Bg&E Application for Renewal of Operating Licenses for Calvert Cliffs.Bg&E Intends to Forward Comments Based on Accuracy Verification in Near Future ML20210D1531999-06-30030 June 1999 Informs of Receipt of from New 7th Democratic Civic Club,Inc Expressing Support for License Renewal. Requests Consideration in Addressing Concerns & Recommendations ML20209B5781999-06-29029 June 1999 Submits Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML20210D1741999-06-24024 June 1999 Expresses Opinions on Renewal of Nuclear Reactor Licenses Re Plant & Support Renewal Application of Bg&E.Requests That NRC Revise Procedures to Allow Sufficient Time for Public to Review,Evaluate & Respond to Info ML20211H8431999-06-23023 June 1999 Ack Participation of Calvert Cliffs Nuclear Engineering Dept in NRC Cooperative Research Project with Univ of Virginia. Copy of Relevant Portion of NRC Cooperative Agreement with Univ of Virginia Encl ML20196C6831999-06-21021 June 1999 Discusses Proposed Alternative Submitted by Bg&E for Calvert Cliffs NPP to Requirements of 10CFR50.55a(g)(4) in Regard to Compliance with Latest Approved Edition of ASME Code,Section XI for Third Ten Year Insp Interval Beginning on 990701 ML20196C4291999-06-21021 June 1999 Forwards Rev to ERDS Data Point Library for Ccnpp,Unit 2,per 10CFR50,App E,Section VI.3.a.Table Provides Brief Summary of Changes ML20195J8271999-06-16016 June 1999 Ack Receipt of to Jackson,Chairman of NRC Re Environ Impacts of Increased Patuxtent River Complex Flight Operations on Ccnpp.Clarification & Correction of Listed Statement Found on Page Two,Provided 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217M9991999-10-22022 October 1999 Forwards Response to NRC 990930 RAI Re Void Swelling Degradation Mechanism,Per License Renewal Application for Ccnpp,Units 1 & 2 ML20216J8671999-10-0101 October 1999 Forwards Rev 52 to QA Policy for Calvert Cliffs Nuclear Power Plant. Rev Accurately Presents Changes Made Since Previous Submittal,Necessary to Reflect Info & Analyses Submitted to NRC or Prepared,Per to NRC Requirements ML20216H7831999-09-28028 September 1999 Forwards Addl Info Re NRC SER for Ccnpp,Units 1 & 2,per License Renewal Application ML20212D5361999-09-20020 September 1999 Forwards Rev 1 to Calculation CA04048, Fuel Handling Accident During Reconstitution, as Agreed During 990909 Telcon ML20212C1861999-09-15015 September 1999 Requests That NRC Complete Review of TR CED-387-P,Rev 00-P, Abb Critical Heat Flux Correlations for PWR Fuel, by 000201.Util Expects to Use ABB-NV Correlation for Current non-mixing Vane Fuel in Reload Analyses in 2000 for Ccnpp ML20211H9841999-08-31031 August 1999 Provides Comments Re Data Entered in Rvid for Ccnpp,Units 1 2,per GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML20210V1181999-08-17017 August 1999 Forwards Toxic Gases Calculations for Control Room Habitability,As Discussed During 990713 Telcon.Util Will Make Final Submittal for Toxic Gases After NRC Has Completed Review of ARCON96 ML20210T5061999-08-16016 August 1999 Forwards Rev 0 to Ccnpp COLR for Unit 2,Cycle 13, Per Plant TS 5.6.5 ML20210U2761999-08-13013 August 1999 Forwards Listed Info Re Guarantee of Payment of Deferred Premiums for Ccnpp,Units 1 & 2,IAW 10CFR140.21 Requirements ML20210S7901999-08-12012 August 1999 Forwards semi-annual Fitness for Duty Program Performance Data for Period of 990101-990630,IAW 10CFR36.71(d) ML20210S8131999-08-12012 August 1999 Forwards Summary of Various Open Licensing Actions for Bg&E That Were Completed During Unit 2 Refueling Outage Ending 990506 ML20210S8101999-08-12012 August 1999 Forwards Application Requesting Renewal of License for Mv Seckens,License SOP-10369-2.Without Encl ML20210N5881999-08-0606 August 1999 Forwards ISI Rept for Ccnpp,Unit 2,fulfilling Intentions & Requirements Stated in Program Plan & Commitment to Comply with ASME Code Section XI ISI Requirements ML20210N5491999-08-0505 August 1999 Requests That License SOP-10371-2,for RW Scott,Be Renewed IAW 10CFR55.57.Individual Has Satisfactorily Discharged License Responsibilities Competently & Safely.Without Application ML20210N5471999-08-0505 August 1999 Requests That License SOP-10031-3,for DF Theders,Be Removed from Active Files for Ccnpp,Due to Individual Being Reassigned to Position No Longer Requiring License ML20210N9291999-08-0404 August 1999 Forwards Clarification to Initial Response to Biennial Rept on Status of Decommissioning Funding,As Required by 10CFR50.75(f)(1) ML20210E4941999-07-23023 July 1999 Informs That 1999 Emergency Response Plan Exercise Objectives Is Scheduled for Wk of 991025.Exercise Scenario Will Test Integrated Capability & Major Portion of Elements Existing within Emergency Response Plan ML20210C5011999-07-21021 July 1999 Informs That SL Walters,License OP-10096-3 & CC Zapp,License Number SOP-2188-9,have Been Reassigned within Organization & No Longer Require NRC License,Per 10CFR50.74(a).Removal of Subject Licenses from Active Files for Ccnpp,Requested ML20211N9101999-07-20020 July 1999 Forwards Correspondence Author Received from New 7th Democratic Club Civic,Inc Raising Some Serious Concerns About Renewal of Nuclear Reactor Licenses for Calvert Cliffs Power Plant ML20210C2681999-07-20020 July 1999 Forwards Certified Copy of Listed Nuclear Liability Policy Endorsement,Per 10CFR140.15(e) ML20210C8461999-07-19019 July 1999 Informs That CF Farrow,License OP-10648-1,will No Longer Be Employed with Bg&E,As of 990709,per 10CFR50.74(a).Removal of Subject License from Active Files for Ccnpp,Requested ML20209J5171999-07-16016 July 1999 Forwards Comments from Accuracy Review of License Renewal Application SER ML20209C1391999-07-0202 July 1999 Forwards Responses to Open & Confirmatory Items Based on Review of SER for Bg&E Application for Renewal of Operating Licenses for Calvert Cliffs.Bg&E Intends to Forward Comments Based on Accuracy Verification in Near Future ML20210D1531999-06-30030 June 1999 Informs of Receipt of from New 7th Democratic Civic Club,Inc Expressing Support for License Renewal. Requests Consideration in Addressing Concerns & Recommendations ML20209B5781999-06-29029 June 1999 Submits Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML20210D1741999-06-24024 June 1999 Expresses Opinions on Renewal of Nuclear Reactor Licenses Re Plant & Support Renewal Application of Bg&E.Requests That NRC Revise Procedures to Allow Sufficient Time for Public to Review,Evaluate & Respond to Info ML20196C4291999-06-21021 June 1999 Forwards Rev to ERDS Data Point Library for Ccnpp,Unit 2,per 10CFR50,App E,Section VI.3.a.Table Provides Brief Summary of Changes ML20195J6591999-06-16016 June 1999 Submits Proposed Alternative to Requirements of 10CFR50.55a(g)(4) (Automatic Compliance with Latest Approved Edition of ASME Code Every 120 Months).Proposal Will Apply Third ten-year ISI Interval,Scheduled to Begin 990701 ML20207F0201999-06-0101 June 1999 Forwards Third Interval Inservice Insp Program Plan for Ccnpp,Units 1 & 2, for NRC Review.Plan Satisfies Commitment Contained in Licensee to NRC 05000317/LER-1999-002, Requests That Cover Page for LER 99-002,dtd 990525,be Corrected to Indicate Rept Is Submitted Per Requirements of 10CFR20.2201(b)1999-05-28028 May 1999 Requests That Cover Page for LER 99-002,dtd 990525,be Corrected to Indicate Rept Is Submitted Per Requirements of 10CFR20.2201(b) ML20195B3751999-05-25025 May 1999 Forwards ECCS Codes & Methods Rept, as Required by 10CFR50.46(a)(3)(ii) ML20195B2521999-05-25025 May 1999 Submits Response to RAI Re LAR for Tube Repair Using Leak Limiting Alloy 800 Sleeves for Ccnpp,Units 1 & 2.Test Repts Encl ML20195B2271999-05-24024 May 1999 Forwards Certified Copy of Nuclear Liability Policy NF-216, Endorsement 128 ML20206U3051999-05-19019 May 1999 Submits Written Rept as Required follow-up to Verbal Rept Given to NRC Regional Administrator on 990419 of SG Tube Insps Conducted,Cause of Tube Degradation & Corrective Measures Taken as Result of Insp Findings ML20206U8281999-05-18018 May 1999 Forwards Missing Pages C-30,C-31,C-114 & C-115 from 990319 Response to NRC RAI, Wind Tunnel Modeling of Calvert Cliffs NPP Cpp Project 94-1040. Complete Copy of 1985 Rept, Wind Flows & Dispersion Conditions of Calvert Cliffs, Encl ML20212G9751999-05-12012 May 1999 Forwards Draft write-up Re OI 16 for F Grubelich to Consider ML20206K6921999-05-10010 May 1999 Forwards Certified Copy of Listed Nuclear Liability Policy Endorsements,In Compliance with 10CFR140.15(e).Without Encl ML20206K1711999-05-0707 May 1999 Informs That on 990430 Util Filed Encl Articles of Share Exchange with Maryland Dept of Assessments & Taxation to Form Holding Company,Constellation Energy Group,Inc (Ceg). CEG Is Parent Company of Bg&E ML20206C7521999-04-29029 April 1999 Provides Rept of Number of Tubes Plugged in Calvert Cliffs Unit 2 SGs During Recently Completed Isi,As Required by Calvert Cliffs Unit 1,TS 5.6.9.a ML20212G9891999-04-28028 April 1999 Forwards Current Draft Response to Ci 3.3.2.2-1 to Be Used as Example for OI Vs License Condition Vs Commitment Situation ML20206C7271999-04-28028 April 1999 Forwards Occupational Radiation Exposure Repts for 1998, as Required by Units 1 & 2 Tech Specs 5.6.1 & 6.1 of Isfsi. Repts Contain Tabulation of Number of Station,Util & Other Personnel Receiving Exposures Greater than 100 Mrem ML20206C7211999-04-27027 April 1999 Forwards Addl Info Which Is Being Made Available in Encl Licensed Operators Fitness for Duty Questionnaire.Encl Specifics of Personal Info Are Withheld,Per 10CFR2.790 ML20212G9851999-04-26026 April 1999 Provides Proposed Response to OI 4.1.3-1 for B Elliott to Consider ML20206U6691999-04-26026 April 1999 Advises That Documents Re Operation of Calvert Cliffs Nuclear Power Plant Should Be Addressed to Listed Natl Marine Fisheries Svc Office ML20205F8851999-04-0202 April 1999 Provides First Annual Amend to Bg&E License Renewal Application for Ccnpp,Units 1 & 2,as Required by 10CFR54 ML20205J0691999-04-0202 April 1999 Forwards Response to NRC 990129 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20205G2971999-04-0101 April 1999 Requests That NRC Complete Review of Rev 0 to CENPD-396-P, Common Qualified Platform TR & Rev 0 to CE-CES-195-P, Software Program Manual for 'Common Q' Sys, by 990930 ML20205D7471999-03-30030 March 1999 Forwards Biennial Rept on Status of Decommissioning Funding, IAW 10CFR50.75(f)(1) ML20207G4391999-03-30030 March 1999 Responds to from Cl Miller,Requesting Assistance of FEMA in Addressing Concerns Received by NRC Involving Offsite Emergency Preparedness at Plant NPP ML20205C4091999-03-26026 March 1999 Submits Info Related to Scope,Risk Mgt & Summary of Risk for Performing Preventive Maintenance on P-13000-2 Unit Transformer Re License Amend 205 1999-09-28
[Table view] Category:UTILITY TO NRC
MONTHYEARML20064A7471990-09-18018 September 1990 Discusses Response to Generic Ltr 88-17, Loss of Dhr. Development of Appropriate Tech Spec Changes for Reducing Cooling Flow Rate in Process.Changes Will Provide Increased Margin to Vortexing Conditions ML20059K1951990-09-18018 September 1990 Clarifies Auxiliary Feedwater Sys Commitments Concerning Ability of Sys to Prevent Total Loss of Feedwater Following Various Pipe Breaks & Component Failures ML20059H2811990-09-0707 September 1990 Forwards Rev 4 to Calvert Cliffs Nuclear Power Plant Performance Improvement Plan Implementation Program. Rev Creates Std Format for Action Plans Which States Scope, Deliverables & Overall Objectives of Action Plan ML20059F4761990-09-0707 September 1990 Forwards Rev 5 to Security Training & Qualification Plan.Rev Withheld ML20059H4241990-09-0707 September 1990 Forwards Performance Improvement Plan Implementation Program Schedule Status as of 900905 05000317/LER-1989-023, Advises That Licensee Plans to Complete Detailed Design for Automatic Isolation Sys Upgrade by 910401,per NRC Request for Schedule for Enhancement Implementation as Discussed in LER 89-23 Re Postulated Pipe Rupture1990-08-24024 August 1990 Advises That Licensee Plans to Complete Detailed Design for Automatic Isolation Sys Upgrade by 910401,per NRC Request for Schedule for Enhancement Implementation as Discussed in LER 89-23 Re Postulated Pipe Rupture ML20059B7481990-08-21021 August 1990 Forwards fitness-for-duty Program Performance Data for Jan-June 1990 ML20058Q2211990-08-14014 August 1990 Forwards Performance Improvement Plan Implementation Program Schedule Status as of 900807.Synopsis of Activities Since Last Update & Updated List of Key Action Plan Info Also Encl ML20058L8811990-08-0101 August 1990 Withdraws License Amend Request Changing Tech Spec Pages 3/4 25a & 25b, RCS Pressure-Temp Limitations. Change Would Have Revised Min Reactor Vessel Flange bolt-up Temp from 70 F to 90 F ML20058L7271990-08-0101 August 1990 Forwards Plant Performance Improvement Plan Implementation Program Schedule Status as of 900724 ML20058L2151990-07-27027 July 1990 Responds to NRC Re Unresolved Item Noted in Insp Repts 50-317/90-80 & 50-318/90-80.Corrective Action: Evaluation of Battery Charger Determined That Provisions Adequately Verify Requirements of Tech Spec 4.8.2.3.2 ML20055H9241990-07-26026 July 1990 Forwards Decommissioning Plan for Calvert Cliffs Isfsi ML20055G9981990-07-20020 July 1990 Responds to NRC Re Generic Implications & Resolution of Control Element Assembly Failure at Plant on 900607.New Control Element Assemblies Ordered.Addl Response Will Be Submitted at Least 60 Days Prior to Restart ML20044B0401990-07-13013 July 1990 Forwards Rev 3 to Calvert Cliffs Nuclear Power Plant Performance Improvement Plan Implementation Program. Brief Summary of Changes Listed ML20055E0801990-07-0303 July 1990 Responds to NRC Re Violations Noted in Insp Repts 50-317/90-08 & 50-318/90-08.Corrective Actions:Instruction CCI-309B Re Control of Locked Valve Revised to Clarify Required Documentation and Verification of Locked Valves ML19298E2271990-06-29029 June 1990 Confirms That Work Intended to Resolve Unresolved Items & Incorporate Improvement Suggestions Completed,Per Insp Repts 50-317/90-04 & 50-318/90-04 ML20055D0311990-06-25025 June 1990 Submits Corrections to Commitments Re Hydrogen Analyzer Sys. Under Worst Case Condition,Hydrogen Recombiners Would Be Started Prior to Hydrogen Concentration Inside Containment Reaching 3.0% Hydrogen ML20043G1771990-06-12012 June 1990 Forwards Monthly Operating Repts for May 1990 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 & Revised Operating Rept for Apr 1990 for Calvert Cliffs Unit 1 ML20043G5931990-06-0808 June 1990 Requests one-time Exemption from Requirement of 10CFR50.71(e) to Allow 3-month Extension to Schedule for Submitting 1990 Rev to Updated Fsar,Per NRC 1989 QA Audit & Insp Repts 50-317/89-27 & 50-318/89-28 Noting Weaknesses ML20043F7101990-06-0606 June 1990 Suppls 900330 Response to Station Blackout Rule (10CFR50.63).Two Addl Class 1E Diesel Generators Added to Reduce Required Coping Duration.Required Coping Duration Is 4 H for One Unit ML20043D7281990-06-0404 June 1990 Responds to NRC 900404 Ltr Re Weaknessess Noted in Maint Team Insp Repts 50-317/90-80 & 50-318/90-80.Efforts to Clean,Insulate & Paint Plant Areas to Improve Cleanliness Being Undertaken ML20043C9051990-05-31031 May 1990 Notifies of Relocation of Ofcs,Effective 900604.New Addresses & Telephone Numbers Listed ML20043C5971990-05-29029 May 1990 Forwards Startup Review Board Self-Assessment Rept:Apr 1990 Unit 1 Startup. Based on Assessment,Mgt Efforts Taken Through Performance Improvement Plan Appears Substantially on Track ML20043B9341990-05-25025 May 1990 Advises of Licensee Progress to Date Re Unresolved Item Noted in Inps Repts 50-317/90-04 & 50-318/90-04 & Identify Slippage Past 900601 Target Date.Completion Date Extended to 900701 ML20043B4691990-05-21021 May 1990 Reaffirms Licensee Intention to Submit Rept Re Deletion of Tech Spec 3/4.6.1.8, Containment Sys - Containment Vent Sys, Upon Receiving Notification That Vent Valves 1(2)-MOV-6900 & 1(2)-MOV-6901 Established ML20043A3381990-05-15015 May 1990 Responds to NRC 900409 Ltr Re Violations Noted in Insp Repts 50-317/90-01 & 50-318/90-01.Corrective Actions:Detailed & Specific Directions for Radiography Will Be Incorporated in Radiography Procedures within NDE Program ML20043A3321990-05-14014 May 1990 Responds to SALP Rept Dtd 900404 Covering Util Performance During 1989.Feedback Mechanisms Established to Improve Training & 10CFR50.59 Screening Procedure & Training Revised ML20042G3751990-05-10010 May 1990 Forwards Changes 1-3 to Rev 0 to Program Plan for Second Insp Interval for Calvert Cliffs Nuclear Plant,Units 1 & 2. Plan Revised to Include Volumetric & Surface Exams of Class 2 Piping Welds in Containment Spray & Shutdown Cooling Sys ML20042G6141990-05-0505 May 1990 Requests Regional Temporary Waiver of Compliance to Provide Relief from Provision of Limiting Condition for Operation of Tech Spec 3.4.10.1, Structural Integrity of ASME Code Class 1,2 & 3 Sys. ML20042G4581990-05-0404 May 1990 Responds to Request for Addl Info Concerning Tech Spec Amend Re Emergency Diesel Generators.Preventive Maint Procedures Prepared on 900411 & Final Approval Will Be Completed After Issuance of Amend ML20042F5771990-05-0404 May 1990 Responds to NRC 900404 Ltr Re Violations Noted in Insp Repts 50-317/90-80 & 50-318/90-80.Corrective Actions:Surveillance Test Procedure M-538-1 Revised to Include Verification of Alarm Function & Alarm Testing Reviewed ML20042F0101990-04-30030 April 1990 Forwards Update of Tables 1C,2A,2B,3A & Page 7 of Semiannual Effluent Release Rept for Second Half of 1989 & Table 3A for Second Half of 1988 & First Half of 1989.Update Includes Strontium Results for Fourth Quarter for Gaseous Releases ML20042E8271990-04-30030 April 1990 Forwards Rev 2 to Calvert Cliffs Performance Improvement Plan Implementation Program. Accountability Improvements, Engineering Planning & Sys Circles Action Plans Completed. New Sections to Rev Listed ML20042F0391990-04-19019 April 1990 Submits Initial Response to SALP Rept Dtd 900404.Licensee Devoted Substantial Senior Mgt Attention & Resources to Improving Facility Performance & Committed to Continue Efforts to Attain High Stds of Safety & Quality ML20012F5511990-04-0606 April 1990 Responds to NRC 900306 Ltr Re Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $100,000.Corrective Actions:Operating Procedures Changed to Prohibit Testing of ECCS When in Solid Water Condition ML20012F2991990-04-0404 April 1990 Revises Scheduled Completion Date for Implementation of Computerized Trending of Surveillance Test Data,In Response to Special Team Insp Repts 50-317/89-200 & 50-318/89-200 from 900601 to 901228 ML20042D8101990-03-30030 March 1990 Forwards Supplemental Info,Clarifying Util 890414 Response to Station Blackout Rule Noting That Util Followed NUMAR-87-00 Methodology ML20012F0211990-03-29029 March 1990 Responds to NRC 900227 Ltr Re Violations Noted in Insp Rept 50-317/89-25.Corrective Actions:Plugging Error Identified & Correct Tube Plugged & Corrective Action Procedures Revised ML20012D3111990-03-19019 March 1990 Provides Followup Response to Violation Noted in Insp Repts 50-317/89-24 & 50-318/89-24.Corrective Actions:Radiation Safety Technicians Responsible for Safety Procedures Trained in Jan 1990 & Radwaste Scaling Factors Approved on 900201 ML20012D1871990-03-16016 March 1990 Discusses Readiness for Restart of Facility ML20012B9121990-03-0909 March 1990 Withdraws 891113 Request for Relief from ASME Code Section XI Requirements ML20012B9221990-03-0909 March 1990 Responds to NRC 900207 Ltr Re Violations Noted in Insp Repts 50-317/89-27 & 50-318/89-28.Corrective Actions:Demineralized Water & Chemicals Added to Steam Generators to Restore Chemical Concentrations to Required Specs ML20012B6111990-03-0707 March 1990 Responds to NRC 900229 Ltr Re Violations Noted in Readiness Assessment Team Insp Rept 50-317/89-81.Corrective Actions: Memo Issued re-emphasizing Importance of Mgt Controls & General Supervisor Counselled ML20012D7271990-03-0505 March 1990 Responds to Violations Noted in Insp Repts 50-317/90-03 & 50-318/90-03 on 900108-12.Corrective Actions:Medical Svcs Tested All Members of Nuclear Security Force for Glaucoma & field-of-vision Requirements ML20011F4251990-03-0101 March 1990 Forwards Page 4-9 of Rev 25 to Security Plan,Originally Submitted on 900228.Encl Withheld (Ref 10CFR73.21) ML20011F4491990-02-28028 February 1990 Forwards 1989 Steam Generator Insp Results Rept.Rept Includes Number & Extent of Tubes Examined,Imperfections Noted & Identity of Tubes Plugged.No Steam Generator Tube Exams Conducted on Unit 1 During 1989 ML20012A1481990-02-28028 February 1990 Forwards Rev 25 to Security Plan & Details of Changes Made by Rev.Encls Withheld (Ref 10CFR73.21) ML20012A1531990-02-28028 February 1990 Forwards Rev 11 to Safeguards Contingency Plan & Details of Changes Made by Rev.Encls Withheld (Ref 10CFR73.21) ML20011F4141990-02-27027 February 1990 Forwards Rev 2 to, Evacuation Time Estimates within Plume Exposure Pathway EPZ for Calvert Cliffs Nuclear Power Plant. Evacuation Time Estimates Updated to Reflect Population & Road Network Changes Since 1981 ML20012A2331990-02-26026 February 1990 Advises That Erosion/Corrosion Program Controlling Implementing Procedure 5.05, Secondary Sys Piping Erosion/ Corrosion Insp Program, Fully Implemented on 891229 1990-09-07
[Table view] |
Text
.
BALTIMGRE GAS AND ELECTRIC CHARLES CENTER P. O. BOX 1475. BALTIMORE, MARYLAND 21203 ARTHUR E. LUNDVALL. .JR.
v.cc paes='"
September 26,1984 sumv U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D.C. 20555 A 4TENTION: Mr. Darrell G. Eisenhut, Director Division of Licensing
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2, Docket Nos. 50-317 & 50-318 Generic Letter 84-15; " Proposed Staff Actions to Improve and Maintain Diesel Generator Reliability" Gentlemen:
The enclosure and accompanying attachment provided herein constitute our reply to your request for information made in Generic Letter 84-15. Enclosure (1) is a discussion of and reply to your specific items and questions. One table is provided in Enclosure (1) and has been segregated in a manner that reflects the specific concerns of item 2 in Generic Letter 84-15.
Pending safety committee review, we plan to submit a proposed Technical Specification change involving diesel generators. The requested change is proposed not only on behalf of previous commitments to Generic Letters 83-28 and 83-41, but to ensure the reliability of the emergency diesel generators installed at our facility is maintained.
Considering the critical role diesel generators play in mitigating various transients and postulated events following a loss of offsite power, we feel diesel generator reliability is important to the early solution to USI A-44, Station Blackout. It is our judgment that timely actions regarding diesel generator reliability will have a significant safety benefit, f
9 0\
8410020168 840926 PDR ADOCK 05000317 PDR i s)
P
l Mr. Darrell G. Eisenhut September 26,1984
- Page 2 h
l Should you have further questions regarding this reply, please do not hesitate to contact us.
Very truly yours, f.
,.l, y ydw- -
O' \
AEL/SRC/ms Enclosure (1)
STATE OF MARYLAND :
- TO WIT:
CITY OF BALTIMORE :
Arthur - E. Lundvall, Jr., being duly sworn states that he is Vice President of the Baltimore Gas and Electric Company, a corporation of the State of Maryland; that he provides the foregoing response for the purposes therein set forth; that the statements made are true and correct to the best of his knowledge, information, and belief; and that he was authorized to provide the response on behalf of said Corporation.
WITNESS my Hand and Notarial Seal:
nh Public
[ Notary '
< dwt /
My Commission Expires: N6 u/ /[<[d
(/ I' '
l ENCLOSURE 1 REPLY TO NRC GENERIC LETTER 84-15 NRC REQUEST
- 1. Reduction in Number of Cold Fast Start Survelilance Tests for Diesel Generator1 This item is directed towards reducing the number of cold fast start surveillance tests for diesel generators which the staff has determined results in premature diesel engine degradation. Licensees are requested to describe their current programs to avoid cold fast start surveillance testing or their intended actions to reduce cold fast star: surveillance testing for diesel generators.
BG&E RESPONSE Based on maintenance experience at our facility and studies performed in reply to Generic Letter 83-41 (Fast Cold Starts of Diesel Generators), we feel that frequent fast cold starts and excessive surveillance testing of the diesel generators have the potential to cause undue wear and damage to moving parts and thereby degrade safety. As stated in the Generic Letter, industry experience shows that an overall improvement in diesel engine availability can be gained by performing diesel starts for surveillance testing using engine prelube and other manufacturer recommended procedures. Accordingly, we have studied various options and discussed them with our vendor. A short term solution has been provided by performing engine prelubrication prior to every start except those specifying ambient starting conditions in the Technical Specifications. Of a long term
. nature, our staff is evaluating modifications to the diesel lube oil system designed to ensure a prelubed condition upon fast start. This would eliminate cold fast starts and improve overall reliability. There are two modifications undergoing analysis and
- evaluation.
(1) Engine prelube system designed to maintain continuous warm tube oil flow through the diesel generator when shutdown. This modification is intended to lubricate the lower internals up to the upper crankline.
(2) Lube oil injection system designed to instantly lubricate upon demand.
This modification uses pressure from the air start system and a bladder-type container to inject at high pressure oil into the engine when air start system demand is actuated.
We currently have an installed lube oil heating system performing continuous lube oil warm-up. We are considering a modification that would increase the lube oil heating capacity to limit the effects of ambient starting by raising the lube oil temperature to a level approximating normal loaded conditions.
'1
-3 ENCLOSURE 1 REPLY TO NRC GENERIC LETTER 84-15 l
l Consistent with.the concern eroressed in NUREG/CR-0660, and Generic Letters 83-41 l
-and 84-15, we. too _have been 'm restigating the impact of needless diesel engine test J
starts. .Our staff has changed several Surveillance Test Procedures (STP's) to minimize
- the amount _ of surveillance - testing. We previously had two separate STP's testing the diesel : generator. under Technical Specification- requirements for verification of
. operability and under-voltage starts. These have since been combined into one.
i procedure, eliminating many redundant requirements.
-In review of NUREG-1024 and Generic Letter 83-28 " Required Actions Based on Generic Implications of Salem ATWS Events", we have committed to reviewing those Technical
-Specifications -which potentially degrade safety. Certain required surveillance tests, testing . frequencies,'ard action statements have been determined to be performance
- degrading. We have ideitified several Technical Specifications that impose n edless test starts _ano
- accordingly, are developing proposed amendments to those previously mentioned.~ For examplej Technical Specification 3/4.8.I' offers many opportunities to relax - needless diesel generator testing. In our proposed Technical Specification
-amendment (to be submittei after safety committee review), we are developing changes to the requirement to demon.-trate diesel generator operability from one hour to eight or 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (depending on circumstanceOfter entering the action statement. . v'dition,
- we are requesting deletion of the retest requirement every eight hours until the other AC power source is restored.' Deletion of this requirement along with the extended time to Everify operability will reduce the number of needless safety-degrading diesel starts.
Concurrent with our changes proposed for the action statements, we have identified seas to be modified in_the Surveillance Requirements. - We are requesting a change to Surveillance P.equirement 4.8.1.1.2.a that eliminates the-term Staggered Test Basis to ensure that diesel generators (including the common unit) are not tested more often than the intent 'of the Technical Specifications. We have deleted the requirement in Technical uSpecification 4.8.1.1.2.a.4 that specifies starting the diesel each time under ambient
- conditions, and as recommended in Generic Letter 84-15, we have proposed adding a new item that requires testmg under ambient conditions every 184 days instead. We feet
.these changes to our Technical Specifications will significantly reduce unnecessary fast cold starts.
NRC REQUEST
- 2. Diesel Generator' Reliability Data This _ item requests licensees to furnish the current reliaMiity of each diesel generator at their plants, based on surveillance test data. Licensees are requested to provide the information requested in Enclosure 2 of Generic Letter 84-15.
w
ENCLOSURE 1 REPLY TO NRC GENERIC LETTER 84-15 BG&E RESPONSE Table 2-1 in Attachment I to Enclosure 1 provides the reliability data requested. As this data indicates, we have established a high level of diesel generator reliabitity, and we feel our current practices are a considerable success.
In addition to the reliability information requested, we have evaluated surveillance test data provided to the NRC in a letter to R. A. Clark, from A. E. Lundvall, Jr., dat;J October 7,1951, addressing USI A-44, Station Blackout. All valid demands between 1976 and 1980 inclusive were analyzed and the results showed that each individual diesel generator had a start reliability greater than 95%. Over a period of five years, each diesel generator attained an average reliability of 98%, with the lowest eliability for an individual diecel unit in a single year reaching 96.7%. While continually monitoring diesel generator. surveillance test data, if our reliability should fall below 95%, we would impose a reliability improvement program designed to raise the level of reliability to 95% or greater. This program is discussed further in Item 3.
NRC REQUEST
- 3. Diesel Generator Reliability Licensees are requested to describe their program, if any, for attaining and maintaining a reliability goal for their diesel generators. An example of a performance Technical Specification to support a diesel generator reliability goal has been provided by the staff in Enclosure 3 to Generic Letter 84-15. Licensees are requested to con. ment on, and compare their existing program c,c any proposed program with the example performance specification.
BG&E RESPONSE Our goal is te maintain all diesel generators at or above a reliability of 95%. We have initiated a program to monitor diesel generator operations and testing to record results of all valid demands (defined in Regulatory Guide 1.108, Position C.2.e.). If an individual diesel generator reliability should fall below 95%, we will impose a program to improve reliability. That program is described in Attachment 2.
Part of our overall effort to maintain reliability was explained in response to item 1. As stated in that response, we are committed to proposing changes to the Technical Specificatio ns aimei at eliminating unnecessary diesel generator testing. As mentioned in that item, we are considering diesel engine modifications that minimize the affects of cold fast starts.
In addition to our committments made in Item I, we have other mechanisms in place to help maintain our high reliability. We routinely review all mechanical Surveillance Test and Preventive Maintenance procedures for their applicability and intent. Our diesel engine vendor periodically provides suggested practices and programs for operation. We maintain communications with our diesel engine manufacturer to keep up to date on equipment changes and problems. We perform complete mechanical inspections every cycle which require a qualified factory representative on hand to assist and advise.
s m
.n ENCLOSUREI REPLY TO NRC GENERIC LETTER 84-15 We record and. maintain data .and results from testing required in the Technical
' Specifications,' and will trend them over time, providing a valuable . tool to evaluate projected diesel generator reliability. This parameter trending program will help predict
.. potential problems- before they become irreversable. The STP's we discussed in our response to item 1 c.re the Surveillance Requirements that provide the trending data.
NUREG/CR-0660, " Enhancement of On-Site Emergency Diesel Generator Reliability",
has many recommendations for licensees to improve their diesel generator reliability.
We 'have been . evaluating the recommendations and have implemented some changes.
- Additionally, much of the philosophy contained in the NUREG has been adopted at our
~
facility. We project a completion date for review of all racommendations in the NUREG by January 31,.1985. At that time we may decide to c.ake additional modifications to
. enhance diesel generator reliability.
All' of the previously mentioned projects, proposals, and programs are part of our comprehensive diesel generator reliability program. We have compared cur program and philosophy with the example performance specification provided in Generic Letter 84-
-15. ' Although the performance specification utilizes many concepts similar to ours, there
- exists some elements that differ substantially with 'our philosophy. The performance
- specification apyars to be 'more punitive than constructive. We feel a reliability program should attempt to identify the incipient causes of failure and provide assurance of reliability. In our judgment, the example reliability improvement program requires excessive testing beyond what we feel is necessary. There appears to be little flexibility for -staff action and even fewer mechanisms available allowing a timely solution to reliability problems. We agree that the frequency'for diesel generator testing must be
. increased when reliability becomes unacceptable to ensure the correct c.auses were identified and corrected. However, accelerated testing is a trade-off made in NUREG/CR-0660 which must be controlled to minimize excessive diesel generator starts. It is our judgment that the increased frequency of testing required by the example performance specification will degrade rather than enhance safety. Those sections of the example Technical Specification that limit diesel generator tests and allow engine prelubrication and/or . warm-up agree with our concerns and the manufacturer's recommendations. Accordingly, we are proposing such changes to our Technical Specifications.
t
I ATTACHMENT 1 TO ENCLOSURE 1 TABLE 2-1 *
- OF PERCENT # OF PERCENT # OF PERCENT FAILURES RELIABILITY FAILURES RELIABILITY FAILURES RELIABILITY I Last 20 Valid Demands
- 0 100 1 95 0 100 Ltst 100 Valid Demands 3 97 3 97 0 100 i NO.11 DIESEL GENERATOR l L:st 100 Valid Demands - August 9,1983 - June 1,1984 FAILURE TIME HISTORY August 17,1983 Diesel Generator failed to reach rated speed and voltage within 10 seconds on start January 12,1984 Diesel Generator failed to reach rated speed and voltage within 10 seconds upon start January 12, 1984 Diesel Generator failed to reach rated speed and vologe within 10 seconds upon start l Last 20 Valid Demands - March 5,1984 - June 1,1984 No Failures NO.12 DIESEL GENERATOR Last IOC Valid Demands - September 9,1983 - June 1,1984 l FAILURE TIME HISTORY l
l September 27,1983 Failure to reach rated speed and voltage within 10 seconds upon start November 14,1983 Failure to reach rated speed and voltage within 10 seconds upon start April 4,1984 Failure to reach rated speed and voltage within 10 seconds upon start l Last 20 Valid Demands - March 11,1984 - June 1,1984 April 4 .984 Failure mentioned above No. 21 DIESEL GENERATOR Last 100 Valid Demands - June 22,1983 - June 1,1984 No Failures Last 20 Valid Demands - February 15,1984 - June 1,1984 No Failures NOTES All start attempts mentioned above were failuies because the diesel generator did not attain rated speed and/or voltage within 10 seconds. It should be noted that the diesel generators did start and did reach rated voltage and speed only a few seconds after the required time.
I s'
ATTACHMENT 2 TO ENCLOSURE 1 DIESEL GENERATOR RELIABILITY IMPROVEMENT PROGRAM
- 1. If a diesel generator has two failures in the last 20 valid demands
- but less than six failures in the last 100 valid demands, then the testing frequency will be increased to at least once per week until the number of failures in the last 20 valid demands is less than two. All failure causes and corrective actions will be reviewed.
- 2. If a diesel generator has three or more failures in the last 20 valid demands or six or more failures in the last 100 valid demands, the General Supervisor - Operations shall review the causes and corrective action of all failures in the last 100 valid demands and approve a program of accelerated testir.g and/or inspection as appropriate to address the nature of the failures. The results af this program will be presented to the Plant Operations & Safety Review Committee (POSRC).
- 3. If a diesel generator has 10 or more failures in the last 100 valid demands it will be declared inoperable. Prior to returning the diesel generator to service, the POSRC will review the causes and corrective actions for all failures in the last 100 valid demands and prescribe a program of testing and/or inspection as it deems necessary.
NOTE: All start attempts (valid demands) shall be logged and maintained in accordance with Position C.3 of Regulatory Guide 1.108.
- Criteria for determining the number of failures and valid tests shall be in accordance with Position C.2.e of Regulatory Guide 1.108.