Interim Deficiency Rept DER 84-15 Re Welds Attaching Pipe Restraint Supporting Less than Design Calculated Dimensions. Initially Reported on 840321.Investigation Continuing.Next Rept Will Be Submitted by 841031
ML20098E511
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 09/11/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-30479-TDS, DER-84-15, NUDOCS 8409280578
Download: ML20098E511 (2)


Text

__

1 l e Arizona Public Service Company September 11, 1984 ANPP-3047 9-TDS /TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resicent Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 84-15 A 50.55(e) Potentially Reportable Deficiency Relating To Welds Attaching Pipe Restraint Supports Less Than Design-Calculated Dimensions In Unit 2.

File: 84-019-026; D.4.33.2

%8 Ref erence : (A)TelephoneconversationbetweenP.NarbutandJ.Cookonf]

March 21, 1984 g

g (B) ANPP-29285, dated April 12, 1984 (Interim Report) @

M @T (C) ANPP-30071, dated July 30, 1984 (Time Extension) M e

r. ) <

Dear Sir:

5

~3 The NRC was notified of a potentially reportable deffeiency in Ref erence ( A), an Interim Report was transmitted by !.:f erence (B), and 'a' Time Extension was requested by Refe 'nce (C). At t'nat time, it was estimated that a Final Report would be available by September 14, 1984.

Due to the extensive investigation and evaluatira required, it is now expected that this information will be finalized by October 31, 1984, at which time a complete report will be submitted.

There is no new inf ormation or change to the Inter 6 Report at this time.

Very truly yours, Cn p

E. E. Van Brunt, Jr.

APS Vice President Nuclear Production p-SM ANPP Project Director EEVB/TRB/nj cc: See Page Two 8409280578 840911 PDR ADOCK 05000529

o it-j ~)

f-g PDR

_ _ - _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ -_ __a

s Mr. T. W. Bishop DER 84-15 Page Two cc:

Richard DeYoung, Director Office of Inspeccion and Enf orcement U. S. Nucicar Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

3 B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo J. Vorees J. R. Bynum J. M. Allen J. A. Brand D. Canady A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen R. P. Zimenaan S. R. Frost L. Clyde M. Woods T. J. Bloom Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, CA 30339 l

. ---