Interim Deficiency Rept (Rdc 111 (84)) Re Fuel Pool Gates Preoperational Test Requirements Not Addressed by Test Specs.Initially Reported on 840813.Evaluation of Test Commitment Review Will Be Completed by 841031
ML20098E489
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 09/12/1984
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
(RDC-111-(84)), NUDOCS 8409280553
Download: ML20098E489 (2)


Text

1 f-5 f) fh T H E C L E V E l.!w D E l. E C T R ! C I L L U N ! N !iT I N G C O M PM Y P.o. Box 5000 - CLEVELANo. OHIO 44101 - TEL E F" ONF d216) 622-9800 - BLLUMINATING BLoG. - $$ PUBLICSQUARE Serving The Best Location in the Nation MURRAY R. EDELMAN VICE PRE $iOENT NUCU A R September 12, 1984 Mr. James G. Keppler Regional Administrator, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 Re:

Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Fuel Pool Gates Preoperational Test Requirements [RDC 111 (84))

Dear Mr. Keppler:

This letter serves as an interim report pursuant to 10CFR50.55(e) on the potential significant deficiency regarding Fuel Pool Gates preoperational test requirements not addressed by test specifications.

Mr. J. McCormick-Barger of your office was notified on August 13, 1984, by Mr. B. D. Walrath of The Cleveland Electric Illuminating Company (CEI) that this problem was being evaluated per our Deviation Analysis Report 194.

This report contains a description of the deficiency, the corrective action being pursued, and the planned date for our next report.

Description of Deficiency No Gilbert / Commonwealth Inc. (G/C Inc.) test specification requirement was written to address acceptance criteria for inspections and tests for the Fuel Pool Gates (sectionalizing devices). Final Safety Analysis Report Table 1.8-1 references Regulatory Guide 1.68, Revision 2-1978, " Initial Test Programs for Water Cooled Nuclear Power Plants." Appendix A, Section M of this Regulatory Guide requires operability and leak tests of sectionalizing devices in the refueling canal and fuel storage pool.

Corrective Action Project Organization observation Action Request P084-65 was issued to track resolution of this problem. A review is being conducted of Final Safety 8409280553 840912 SEP 181984 PDR ADOCK 05000440

[ ;()

R PDR L

0;..

"o

g.

Sspterbar 12, 1984

Mr.~ James G. Ksppisr

. Analysis Report and Safety Evaluation ReportEcommitments to assure all applicable. criteria are addressed by G/C Inc. test specifications. Completion i of the Test Commitment Review Is anticipated-by September 28, 1984. Our-evaluation of the results of this review will be. completed by October 31, 1984, and we will then' submit the next; report on this-subject.

Please call if'there are any' additional questions.

Sincerely, Murr R..Edelman Vic President Nuclear Group MRE:nb DW165/l!/2 cc:

Mr. J. A. Grobe USNRC, Site Office Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington. D.C.

20555 U.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D.C. 20555 Records Center, See-In Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339 s