ML20098E440

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DER 84-20 Re Displacement of Connecting Line in Safety Injection Sys.Initially Reported on 840420.Next Rept Will Be Submitted by 841024
ML20098E440
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 09/11/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-30478-TDS, DER-84-20, NUDOCS 8409280479
Download: ML20098E440 (2)


Text

_ __ ___

3

,g Arizona Public Service Company September 11, 1984 ANPP-30478-TDS/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210

+

Walnut Creek;' CA 94596-5368 Attention: Mr. Ti' W. Bishop; Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 84-20 A 50.55(e)- Potentially Reportable Deficiency Relating To Displacement Of A Connecting Line In The SI System.

File: 84-019-026; D.4.33.2 Ref ere nce: (A) Telephone conversation between T. Young. and J. Cook on "

April 20,1984 N

.,3 m

(B) ANPP-29531, dated May 17, 1984 '

..srim Report)

]

x8 (C) ANPP-29973, dated July 16,1984 (Time Extension)

E' c-gy (D) ANPP-30277, dated August 20, 1984 (Time Extension)E g

7

=c

Dear Sir:

FG The NRC was notified of a potentially reportable deficiency in b

Reference (A), an Interim Report was transmitted by Reference (B),

and Time Extensions were requested by References (C) and (D). At that time, it was estimated that a Final Report would be available by September 12, 1984 l

A Final Report has been submitted to APS for review.

It is expected a Final Report will be transmitted to the NRC by October 24, 1984.

There is no new inf ormation or change to the Interim Report at this time.

Very truly yours, b

om E. E. Van B runt, Jr.

APS Vice President Nuclear Production ANPP Project Director EEVB/TRB/nj cc: See Page Two 8409280479 840911 PDR ADOCK 05000528

/ O yb_- M S

PDR J

~.

'('

i I

0, Mr. T. W. Bishop

. DER 84-20 Page Two n.

cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555-T. G. Woods, Jr.

-D..B. Karner W.'E. Ide D. B. Fasnacht A.

C._ Rogers L. A. Souza D. E. Fowler T. D.- Shriver C..N..Russo J. Vorees

. J. R. Bynum J. M. Allen J. A. Brand D. Canady A. C. Gehr W. J. Stubblefield-W. G. Bingham R. L. Patterson R. W.. Welcher H. D. Foster

' D. R. Hawkinson L. E. Vorderbrueggen R. F. Zimmerman S. R. Frost L. Clyde M. Woods T. J. Bloom-Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500

-Atlanta, GA 30339

.,