.lLLIN0/8 POWER COMPANY 3
CLINTON POWER STATION, P.O. BOX 678, CLINTON, ILLINOIS 61727 August 13, 1984
. Docket No. 50-461 Mr. James G. Keppler Regional Administrator
- Region III U.'S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137
Subject:
Revised Response to Notice of Violation, NRC IE Inspection Report Number 50-461/81-25
Dear Mr. Keppler:
This letter is in reference to the Illinois Power Company response U-0396, dated January 8, 1982, to your Notice of Viola-tion dated December 9, 1981, NRC IE Inspection Report Number 50-461/81-25.
The violation identified by the NRC inspector was that
" physical and environmental protection from nearby construction activity was not provided for.... numerous p' recut, coiled, temp-orarily stored Class 1E electrical cables.
The response con-tained in Illinois Power Company letter U-0396 stated in part:
With regard to cable protection, four (4) enclosed staging areas are being constructed in the plant to provide a suitable controlled environment for cables temporarily stored near the construction activity.
Illinois Power Company provides the following revised response:
1.
Baldwin' Associates rocedure BAP 3.3.2, Cable Installation, will incorporate the requirement that cable be stored in designated areas for protection from potential damage.
Cable storage prior to installation shall be in accordance with procedure BAP 2.4, Storage and Maintenance.
8409260408 840824 gDRADOCK 05000461 PDR AUG 16 I984
c
.,"u
.a
- Mr. James G. Keppler August 13, 1984 2.
Baldwin Associates-Quality Control shall perform in-plant storage inspections on a periodic basis to assure storage requirements are maintained.
I trust that our response is satisfactory to maintain compliance with regulatory requirements.
Sincerely yours, D. P. Hall Vice President JRS/cbs (NRC2) cc:
Director, Office of I&E, US NRC, Washington, DC 20555 NRC Resident Office Illinois Department of Nuclear Safety i