ML20098A667

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 83-06 Re Use of Nonconforming Matls Mfg by Tube-Line Corp.Tube-Line Matls Identified & 64% Located Thus Far.Review of safety-related Const Travelers Continuing,Nonconformance Repts Issued & Matls Returned
ML20098A667
Person / Time
Site: Clinton Constellation icon.png
Issue date: 09/14/1984
From: Hall D
ILLINOIS POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
0982-L, 982-L, IEB-83-06, IEB-83-6, U-0732, U-732, NUDOCS 8409250206
Download: ML20098A667 (1)


Text

q.

y.

U-0732 M

0982-L LO8(IEB83-06)-84(09-14)-L

'llLIN018 POWER COMPANY IP CLINTON power STAllON, P.o. BOX 678. CLINToN, ILLINOIS 61727

-Docket No./50-461~

September 14, 1984

~

Mr.; James'G. Keppler Regional Administrator Region III-

.U..S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

. Subj ect: Clinton Power Station Unit 1 IE Bulletin No. 83-06

~

Dear Mr. Kappler:

This interin report is an update in response to the subject IE Bulletin addressing the use of. nonconforming materials supplied by Tube-

-Line Corporation. Previous -Illinois Power reports on this subject were supplied to you via letters from Mr. D..P. Hall to Mr. J. G. Keppler dated December-23, 1983 and May 4, 1984. These reports provided Illinois Power's plan for identifying, locating and dispositioning Tube-Line Corporation materials supplied to the Clinton Power Station (CPS);

To date. Tube-Line materials supplied to CPS have been identified and 64% of these materials have been located.. Review of safety related construction travelers to locate the remaining materials is continuing.

'Nonconformance reports (NCRs) are being' issued and dispositioned as materials are located and the nonconforming materials are being returned to the vendors.

Illinois Power will. provide your office with an interim report on resolution of IE Bulletin No. 83-06 in ninety (90) days.

Please notify us if you have-any questions concerning this matter.

I hereby affirm that the informatf.on in this letter is correct to the best of my knowledge.

Sincerely _yours,

. Ha 1 Vice President KAB:1m cc:

B. L. Siegel, NRC Clinton Licensing Project Manager NRC Resident Office NRC Document Control Desk, Washington, D.C.

20555 Illinois Department of Nuclear Safety f

/ Elf M'

~ ' '

8409250206 840914

o PDR ADOCK 05000461 G

PDR SEP 2 0 W u

a

'