ML20097J706
| ML20097J706 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 09/06/1984 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANPP-30448-TDS, DER-83-73, NUDOCS 8409210354 | |
| Download: ML20097J706 (2) | |
Text
.
2
_ e Arizona Public Service Company September 6,1984 ANPP-30448-TDS/TRB U. S. Nuclear Regulatory Commission Region V Creeknide Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Reaident Reactor Projects and Engineering Programa
Subject:
Time Extension For Report - DER 83-73 A 50.55(e) Potentially Reportable Deficiency Relating To Unqualified Foxboro Power Supplien Were Installed In IE Instrument Cabinets.
File: 84-019-026; D.4.33.2
Reference:
(A) Telephone conversation between P. Narbut and R. Tucker on October 27, 1983 (B) ANPP-28290, dated November 28, 1983 (Interim Report)
(C) ANPP-28538, dated January 3,1984 (Time Extenaton)
(D) ANPP-28334, dated February 24, 1984 (Time Extension)
(E) ANPP-29352, dated April 24, 1984 (Time Extension)
(F) ANPP-29582, dated May 23,1984 (Time Extension)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Refarence (B), and Time Extensions were requanted by References (C), (D), (E), and (F). At that time, it was estimated that a Final Report would be available by 4
Mny 25,1984.
A Final Report has been submitted to APS for review.
It in expected a Final Report will be transmitted to the NRC by September 25, 1984.
There in no new information or change to the Interim Report at this time.
Very truly yours, b$0cm Q
E. E. Van Brunt, Jr.
i APS Vice Prentdent Nuclear Production ANPP Project Diractor EEVB/TRB/nj j
cc: See Page Two 1(O 8409210354 840906
" * * *"**in ZE e 7 r
8
- p. ' T. _..
~
Mr. T. W. Bishop =
DER 83-73 Page dro cci
-Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Coomianion Washington, D. C. 20555 T. G. Wooda, Jr.
D. B. Karner W.'E. Ide D. B. Fa nnacht A. C. Rogern L. A. Souza D. E. Fowler T. D. Shriver C. N. Runno J. Voreen J. R. Bynum J. M. Allen J. A. Brand D. Canady A. C. Gehr W. J. Stuhhlefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinnon L. E. Vorderbrueggen R. P. Zimmerman S. R. Front L. Clyde M. Wooda T. J. Bloom Recorda Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta. GA 30339
)
i
-