ML20097G651

From kanterella
Jump to navigation Jump to search
Amend 131 to License NPF-12,revising TS Pages 3/4 7-15 & 3/4 9-13
ML20097G651
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 02/10/1996
From: Hebdon F
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20097G653 List:
References
NUDOCS 9602210357
Download: ML20097G651 (5)


Text

,_

6 i

k# Cf f y

  • 2 UNITED STATES s

j NUCLEAR REGULATORY COMMISSION 2

WASHINGTON, D.C. 20008 4 001

%...../

{

SOUTH CAROLINA ELECTRIC & GAS COMPANY a

DOCKET NO. 50-395 VIRGIL C. SUMMER NUCLEAR STATION AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 131 License No. NPF-12

1. The Nuclear Regulator Commission (the Comission) has found that:

A.

The application for amendment by South Carolina Electric & Gas Company (the licensee) dated February 10, 1996, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission;.

C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this licente amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-12 is hereby amended to read as follows:

9602210357 960210 PDR ADOCK 05000395 P

PDR

J i

(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment 131, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance to be iaplemented immediately.

FOR THE NUCLEAR REGULATORY COMISSION

.f M.

L Frederick J. Hebdd6, Director Project Directorate II-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: February'10, 1996

'9l 4

ATTACHMENT TO AMENDMENT 131 FACILITY OPER_ATING LICENSE NO. NPF-12 DOCKET NO. 50-395 Revise Appendix A as follows:

Remove Paaes Insert Paaes 3/4 7-15 3/4 7-15 3/4 9-13 3/4 9-13 i

I

A j

REFUELING OPERATIONS i

SURVaff 74NCE D*OUTWFMENTS (ContinnM) i i

2.

V within 31 days aAer rennovelthat alaboratory i

a representative carben sample obtamed in wita Position,C.6.b d tory 4

i Guide 1.52,Revisi 1978,mootsthe tery j

testingcriteria DAN N609-1980,ata testmedia I

j temperature d30'C.

l oper wheate Y w

d j

c.

Priorto the movementdfhalorcrane withloadso' erthe v

poolbyv thata d

j carbon in PositionC.6.b 1

d Guide 1.52 Revision 2.Manh1 thelabora-criteria of ANSI N5061980 at a test media temperatore I

i d

uentto eachinitial (whichumstbecompleted l

i priortofuelmovementorcrane withloadsoverthepeo0, i

duringthe periodoftimeinw thereistobefhetorerane 4

moveementwithleadsoverthe

,verifycharcoaladsorber deseNaN. These f:y-2ana h

within thirty-one (81) days of sample removal d.

Atleastonceper18 monthsby:

1.

V thatthepressure across thecombined HEPA and altersandcharcoal banksisless than Gause while operating the systema at a fknr rate of 80,000 een t 106.

2.

VerifHas +that an a loss of maa power test signal, the systeam au mnaHamilystarts.

3.

Verifying that the systema maintains the smt fhat areaat a negative greaterthanor equal <a1/8 Water to the outside atmosphere during systema o.

After each complete er partial rept=>ama=* of a HEPA filter bank by that the HEPA filter banks remiove greater than or equal to v

99, of the DOP when they are tested in-place in aceeedence with ANSI N610-1975 while operating the systema at a flow rate of 80,000een i 10E f.

AAereach or partial reptseemment of a chareeel adsorber bankby thatthe chareoaladsorbersremere thanor eq ualto 99.9 ahal stad hydrocarben testgas w non they are testedin-in accordance with N5101975 while operating the systema at a flow rate of 80,000 een i 10E SUMMER-UNFr1 3/4 9 13 A=aadman* No. 42, ' '

i 9

l PLANT SYSTEMS k

gunvart r Awcm unoutnuuuNTS (Contianae t

l

' 1.

Verifying that the cleanup system satisSes the testing i

criteria and uses the test precedures tory

~

P C.5.a. C.6.c and C.6.d ofRegulatory Guide Revision 2, March 1978, and the systeem flow rate is 21 0 chn i 10%.

i 2.

Verifying,fawithin31da after thatalaboratory I

analysiso charcoal in assord-I anee Position C.6.b of Guide 1.62, i

Revision 2, 178,meetsthelaboratory criteria of ANSI N5091980, at a relative humidity of 70%

26T, with a methyliodido penetration of < 15.

l l

3.

Verifying a system flow rate af 21,270 cha t 10% durm' g system j

operation when tested in acesedance with ANN N5101975.

l d.

After every 790 hours0.00914 days <br />0.219 hours <br />0.00131 weeks <br />3.00595e-4 months <br /> of charcoal adsorber operation verifying within 81 days aftar removal, that a laboratory ofa I

mpresentative carbon sample obtained in accordance with Regulatory t

Position C.6.b of Regulatory Guide 1.52, Revision 2, March 1978 j

meetsthelabora testing criteria of ANE N50S.1960, at a relative I

j humidity of 70%

25'C with a methyliodido penetration of <15.

l l

e.

Atleasteneeper18 monthsby:

t 1.

thatthe d

across thecombined HEPAand chareaal banksisless than l

Gauge while operating the system at a flow rate i

of 21,270 chn i los.

l l

2.

Verifying that on a simulated M or high radiation test signal,f I

the a=+--h11w switebes into a vecirculation mode o with Sow thringh the HEPA futars and charenal banks.

i j

3.

that on a simulated E or high radiation test signal-i the startsthe normaland airhandHassysteams j

pressurine thecentretroosatoa pressureof j

greaterthanorequalto1/BinchW.O tothe outside

=~ -i. and v==Inamina the 1/8 inch W. G. positive pressure i

with a nazimum of1000 c8n ofoutside air during system

[

ol,aration.

i f.

Aftereach lete or

. ?---t of a HEPAfilter bankby futer banks ressere greater than er equal to j

99, when they are tested in-place in asoonlance l

with ANN N5101975 whue operating the systema at a flow rata of 21,270 cen i 10%.

j i

g.

After eachcom,plete er replaessmentofasharcoaladsarber bankbyverifp% ofaagthatcharcoaladsarbersresneve than or i

to 99.95 ated h,4.

rtM m gas l

theyare testedin-inaeonedancewith N5101975 j

while operating the system at a flow rate of 21,270 ces i 105.

1 SUMMER-UNIT 1 a/47-15 A===d===6 No.' 24, " '

i-l t i

i

.