i spi aaa O r UNION EECTRIC COMPMW June 5, 1992 C 4 W Plord Nuclear Regulatory Commission Document Control Desk-Washington, DC 20555 ULNRC 2644
Dear Sir:
DOCKET NUMBER 50 483 CALIAWAY PLANT. UNIT 1 FACILITY OPERATING LICENSE HPF 30 MONTitLY OPERATING REPORT
_ MAY 1992 The enclosed Monthly-0;ieratin6 Report for May, 1992 is submitted pursuant to section 6.9.1'.8 of'the Callaway Unit 1-Technical Specifications.
. D. Blosser.
Manager, Callaway Plant JDB/DEY/I.DA/ TAM /RJH/cig-E.nclosure nc:
Distribution attached
[
J
-,,_. _ e25<
q,
O cc distribution for ULNRC.2644 vith enclosures Mr. Richard Hague, Chief Project Section IA U. S. Nuclear Regulatory Commission R*Eton 111 799 Roosevelt Road Glen Ellyn, IL 60137 Mr. R. J. Itall (2 copies)-
Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission 1 White Flint, North,- Mail Stop 13E21 11555 Rockville, MD 20252 NRC Resident Inspector Manager, Electric Deparcment Missouri Public Service Commission P.O. Box 360 Jefferson City, MO 65102
'1 k
)
_a
-1__
DOCKET NO, 50 483 UNIT NAME CALLAVAY UNIT 1 DATE 06 04 92 COMPLETED BY R. J. McCann TELEP110NE 314/676 8243 PART A OPERATIONS
SUMMARY
The plant resumed power operation from a scheduled refueling outage on 5/18/92. The plant attained approximately 984 power on 5/23/92 at which time a reactor trip occurred due to a low icvol in the C steam generator The low steam generator level was caused by a faulty relay driver card.in the feed water isolation system. Power operation resumed on 5/26/92, On 5/27/92, teturn to full power operation was suspended due to repairs on the B main feed pump. Return to full power operation resumed later that day.
PART B PORV AND SAFETY VALVE
SUMMARY
None s
Page 1 of 4-
.' r PART C AVERAGE DAILY UNIT POVER LEVEL DOCKET NO 50 483 UNIT Callaway Unit 1
.DATE 06 04 92 COMPLETED BY R. J. McCann TELEPilONE 314/676 8243 MONTH: MAY 1992 AVERAGE DAILY POVER LEVEL AVERACE DAILY POVER LEVEL M
(MVe Net)
M (MVe) 1 0
17 0
2 0
18 j}
3 0
19 215 4
0 20-434-5 0-21 526 6
0 22 1002-7 0
23-762 8
0 24 0
9 0 0 10 0
26 184 11 0
27 846 12 0
f,8 1124 13 0
2 9 --
L152-14 0
30 ~
=1152 15 0
31.
1151-16 0
Page 2 of 4-
t.
Part D OPERATING DATA REPORT DOCKET No.
50-483 UNIT NAME CALLAWAY UlllT 1 DATE 06 04 92 COMPLETED BY R. J. McCANN TELEP110NE 314/676 8243 OPERA 11NG $1ATUS
(.7,, Q nt) 1 1.
REPORilNG PtR100: May 1992 GR055 KVR$ IN REPORilNG PER1001 744 3647 65.268.5 2.
CURRINTLY AUTHORil[0 POVER LtVtl (HWti: 3555 MAX. OtttND, CAPACITY (We-Net): 1125 DES!GN(LitTRICALRAT!hG(MVeNet): 1171 3.
POVER((V[l10VHICHRE11RICT(0(lfANY)(HWeNet):
4 RCA$0NS FOR R[$1RICil0N (!F ANY):
THf$ MONTH YR TO DATE CUMULAi1VE 5.
NUMBER OF HOUR $ REACTOR VAS CRiflCAL.....
149.1 2027.7 56.!!6.2 6_
RIACTOR REl(RVC $HU100VN H0VR$...........
0 0
0 7.
HOUR $ GENERATOR ON LINE..............,
246.5 2099.5 54.947.9 8.
UNIT RESERVE SHUT 00VN H0UR$..............
0 0
0 t
9.
GROS $THERMALENERGYGENERATED(MVH).....
657.818 6.E98.265 183.161.148
- 10. GRO$$ ELECTRICAL (NCRGYGENERAi[0(MVH).
219.4!8
!.192.383 62.455.547 11, NET [LCCTRICAl.[NCRGYGENERATED(MVH)....
194.279 2.265.755 59.345.303
- 12. REACTOR SERVICE FACTOR...................
20.0 55.6 06.0
- 13. REACTOR AVAILABILITY FACTOR...........
20.0 55.6 86.0
- 14. UNIT $tRVICE FACTOR.....................,
33.1 57.5 64.2
- 15. UNIT AVAllABill1Y FACTOR.................
33.1 51.5 64.2
- 16. UNii CAPACITY FACTOR (Using MDC).........
23.2 55.2 80.8 17, UWli CAPACITY FACTOR (Using Design MVe)..
22.3 53.1 77.6
- 18. UNii FORCCD OUTAGE RATE......
!!.3 5.1 3.1
- 19. $ HUT 00WN5 $CHEDULED QVER NtKT 6 HONTHS (TYPE. DATE, AND DURATION OF (ACH);
- 20. IF $ HUT 00VN AT (ND OF REPORTING PERIOD. ($11 HATED DATE OF STARTUP Page 3 of 4
f V
l m
=
PART E UNIT SHUTDOW45 A43 POWER REDUCTIONS DOCAET E0.
50-483 LWIT MAME CALLAWAY LSIT I DATE C6-04-92 r.CMFLETED BY R. J. Ecnne TELEPHONE 314/676-8243 REPORT PCMTH: NAY 1932 NETH00 CF TYPE Si4;TTING DC"A F: FDRCED DURATICM THE REACTOR OR No.
DATE 5: SCHEDULED (HOJRS)
REA50M REDUCIMG PCVER CORRECTIVE ACTICMS/COPeTNTS 05 03/20/92-5 426.1 C
1 On 3/20/92, the unit was r w f e service a M the j
reactor shutde=9 for a normal refueling cutage.
06 05/18/s2 5
4.9 B
4 On 5/18/92, a -:ain turbine everspeed test =es perfo=d at 1C% cower.
D' 05/23/92 F
66 5 A
3 On 5/23/92, a reacter trip occuered da to a le= level in tre C steam mrater. Tre low sters gmater level was caused by a faulty -elay & iver card in the feed =ater isclation cont ci system. Fow=r cperatice res M on 5/26/32. Refe ence: LER 92-007-00.
08 C5/27/92 F
5.3 A
1 On 5/27/92. return to fall power coe ation==s rurW u l
to repairs en the B mata fe=d cmp. Retu*n to full p>er I
J i
operation rests 9ed later that day.
l l
\\'
SUW"ARY:
REASON 8'ETH00 I
A: EQUIPMENT FAILURE (EXFLAIR) 1: MANUAI B: PAINT. OR TEST 2: MANUAL SCRAM C. RE WELIRG 3: AUT0"ATIC SLRAM i
D: REGULATORY RESTRICTICM 4: OTHER (EXPLAIS) l E: CPERATOR TRAINItG AND LICEn5E EXAs'INATIDM F: ADMINISTRATIVE G: OPERATIONAL ERROR ! EXPLAIN)
H: OTHER (EXP AIN)