I hJ,.
OPERATING DATA REPORT a..
DOCKET NO 50-255 DATE 9-10-84 COMPLETED BY AFDienes TELEPHONE (616)764-8913 OPERATING' STATUS Notes 1.
Unit N,ae: Palisades 2.
Reporting Period:
840801-840831
-3.-
Licensed Thermal Power (MWt):
2530 4
Nameplate' Rating (Gross MWe):
-811.7 5.
Design Electrical Rating (Net MWe):
805 6.
Maximum Dependable Capacity (Gross MWe): *675 7.-
Maximum Dependable Capacity (Net MWe):
- 635
-8.
If Changes Occur in Capacity Ratings (Items Number 3 through *) since last report, give reasons:
4 9.
Power Level to Which Restricted, if any (Net MWe):
10.
Reasons for Restrictions, if any:
This Month Yr-to-Date Cumulative i
11.
Hours In Reporting Period 744 5855 111,350 12.
Number of Hours Reactor Was Critical 216.8 363.5 59,622.7-
- 13. Reactor Reserve Shutdown Hours j
- 14. Hours Generator On-Line 207.3 226.0 56,504.0 15.
Unit Reserve Shutdown Hours 16.
Gross Thermal Energy Generated (MWH) 166,704 176,520 115,536,744
- 17. Gross Electrical Energy Generated (MWH) 46,320
_48,780 35,799,220 18.
Net Electrical Energy Generated (MWH) 37,928 39,370 i
- 19. Unit Service Factor 27.9 3.9
,,?3,667,384 50.7 20.
Unit Availability Factor 27.9 3.9 50.7 21.
Unit Capacity Factor (Uning MDC Net) 8.0 1.1 47.6 22.
Unit Capacity Factor (Usi1g DER Net) 6.3 0.8 37.6
- 23. Unit Forced Outage Rate 72.1 71.0 32.5 24.
Shutdowns Scheduled Over dext Six Months (Type, Date and Duration of Each):
t 25.
If Shut Down at End of Report Period, Estimated Date of Start Up:
9-2-84 26.
Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY l
INITIAL ELECTRICITY i
COMMERCIAL OPERATION
?
- Based on condenser backpressure l
OC1083-0100B-TC03 1 E24 8409180497 840831
//
i '
PDR ADOCK 05000255
/I R
G,.-
]
~'
AVERAGE. DAILY UNIT POWER LEVEL.
DOCKET NO 50-255 UNIT Palisades DATE 09-10-84 COMPLETED BY AFDienes TELEPHONE (616)764-8913
~ MONTH August 1984 j:
DAY
' AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 4 1
150 17 0
2 275 18 0
1 3
326 19 0
4 121 20 0
4 i
I 5
46 21 0
l 6
146 22 0
7 144 23 0
8 147 24 0
4 9
150 25 0
10 75 26 0
11 0
27 0
12 0
28 0
i 13 0
29 0
14 0
30 0
15 0
31 0
)
I 16 0
2 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each I
day.-in the reporting month. Compute to the nearest whole megawatt.
-l'
{
OC1083-0100C-TC03 I
~,. '
.t DOCKET NO.
50-255-IMIT SHUIDOWNS AND POWER REDUCTIONS UNIT NAME Palisades DATE 09-10 COMPLETED BY AFDienes REPORT MONTH AUGUST 1984 TELEPHONE (616)-764-8913 1
2 Cause & Corrective No.
Date Type Duration Reason Method of Licensee Systp Compopnt (Hours)
Shuting Event Code Code Action to.
3 Down Reactor Report #
Prevent Recurrence Loss of turbine EHC due to a 3
840804 F
23.3 A
3 failed fitting.
Failed weld on PCS instrument 4
840810 F
513.4 A
1 84-16
- line, t
l 1
i i
1.
2.
3.
4.
5.
F: Forced Reason:
Method:
Exhibit G - Instructions Exhibit I - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data-B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)-File D-Regulatorv Restriction 4-Other (Explain)
(NIREG-0161)
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
(9/77)
H-Other (Explain)
OC1083-0100D-TCO3
T..
1
SUMMARY
OF OPERATING EXPERIENCE FOR AUGUST 1984 The Plant operated at essentialy two power levels during the' reporting period; 48 percent and 28 percent power.
The Plant tripped August 4, 1984, 1355, on loss of turbine EHC due to a failed fitting. The unit was again on line August 5, 1984, 1313. The unit was taken off line on August 10, 1984, 1437 due to a PCS leak from an instrument line. The Plant remained off line through the end of the reporting period.
i l
l OC1083-0100E-TC03
9
@ Consumers Power Company Pahsades Nuclear Plant; 27780 Blue Star Memorial Highway, Covert, MI 49o43 September 10, 1984 US Nuclear Regulatory Commission Mail and Records Section Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of August 1984.
Dewey VanDenBerg Reactor Engineer CC: CHGoralski, Palisades JGKeppler, USNRC JRSchepers, P24-314 DJVandeWalle, P24-614B DWRogers, Palisades Resident Inspector, Palisades DLHackett, P11-228B LABrown, P21-317 GWBruckmann, Div of Radiological Health Services, Lansing, Michigan SMicrzwa, Michigan Dept of Labor RCallen, Michigan Public Service Commission KMFarr, Palisades Records Center, INPO, Atlanta, GA RWraylor, CE, Palisades JBToskey, P25-101 EWRaciborski, P26-204 Document Control. 950*22*35*10/L CHG84*008
').
i OC1083-0100A-TC03 s \\
i