Text
,
ENTERGY 5% " ",,".". s"'""*'
J
. s...
June 10, 1992 j
U.S. Nuclear Regulatory Commission Mail Station PI 137 Washington, D.C.
20555 Attention:
Document Control Desk
Subject:
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Monthly Operatirg Report GNRO-92/00069 Gentlemen In accordance with the requirement of Technical Specification 6.9.1.10 Entergy Operations is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit 1 for May 1992.
If you have any questions or require additional information, please contact this office.
Yours truly,
< o rmu s
WTC/TMC/cg attachments: 1.
Operating Status 2.
Average Daily Power Level 3.
Unit Shutdowns and Power Reductions cci (Seenextpage)
I
'200/;u 9206120340 920531 i
PDR ADOCK 05000416 R
pon j,.Hye M00PMAY
/
l g
. _ _ _. _ = _
' une 10,1992 J
i GNR0-92/00059 Page 2 of 3 i
i Mr. D. C. Hintz (w/a))
^
cci-Mr. R. B. McGehee(w(w/a))
Mr. J. L. Mathis
/a Mr. N. S. Reynolds (w/a Mr.-H.L. Thomas (w/o)
Mr. Stewart D Ebneter (w/a)
Regional Administrator U.S. Nuclear Regulatory Commission Region 11 101 Marietta St.,-N.W., Suite 2900 Atlanta,_ Georgia 30323 Mr. P W. O'Connor, Project Manager-(w/2)
Office oti.1uclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C.
20555 i
3 T
E I'
t M00PMAY-
i Attachment I to GNR0-92/00069 DOCKET NO.
50-416 DATE 06/66/92 COMPLETED BY L. f. Daughtery TELEPHONE (601)437-2B4 OPERATING STATUS 1.
Unit Name: GGNS UNIT 1 Notes:
2.
Reporting Period:
May 1992 3.
Licensed Thermal Power (MWT): 3833 Mdi 4.
Nameplate Rating (Gross MWE): TDE 5 MWE 5.
Design Electrical Rating (Net HWe): 1250 MWL 6.
Maximum Dependable Capacity (Gross MWi~.): 1190 MWE 7.
Maximum Dependable Capacity (Net MWe): 11 F IFE~~
8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Las'. Report.
Give Reasons:
N/A 9.
Power Level To Which Restricted, in Any (Net MWe): ~
N/A
- 10. Reasons for Restrictions, If Any:
N/A This Month Yr to Date
_ Cumulative
- 11. Hours In Reporting Period 744 3,647 66.759
- 12. Number of hours Reactor Was Critical 0
2,420.4 52,617.5
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 0 -
2,367.0 50,417.4
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 0 8,716,470 114 439 654
- 17. Gross Electrical Energy Generated (MWH) 0 2,783,643
,#a,7BT a
- 18. Net Electrical Energy Generated (MWH) 0 2,671,806 T,932,52I
- 19. Unit Service Factor 0
64.9 78.1
- 20. Unit Availability Factor 0
64.9 78.1
- 21. Unit Capacity Factor (Using MDC Net) 0 6TT 74.4 220 Unit Capacity Factor (Using DER Net) 0 -
58.6 67.4
- 23. Unit Forced Outage Rate 0
8.7 6.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. Tf Shut Down At tnd of Report Period.
Estimated Date of Startup:
As of May 31, 1992 startup date was June 4, 1992. Actual startup date - June 8, 1992
- 26. Units in Test Status (Prior to Commercial Operation).
forecast Achieved INITIAL CRITICALITY 08/18/82 INITIAL ELECTRICITY T672T784 COMMERCIAL OPERATION 07/01/85 M00PMAY/SCMPFLR
~
- to GNRO-92/00069 DOCKET NO.
50-416 UNIT 1
DATE 06/05/92 COMPLETED BY L. F. Daughtery TELEPHONE 601-437-2334 J
MONTil May 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4-0 20 0
5 0
21 0
6
-0 22 0
7' 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
0 27 0
12-0 28 0
13 0
29 0
14 0
30 0
15 0
31 0
16' 0
N/A i
)
M00PMAY/SCMPFLR I
" toGNRO-92/0D069,^
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME 1
DATE 06/05/92 -
1 COMPLETED BY L. F. Daughtery TELEPHONE 601-437-2334 DEPORT MONTH May 1992
.I l
l l
l l Method of l Licensee l
l Cause & Corrective l
i l No. l Date l Type l Duration l Reason l Shutting Down!
Event ~
System l Component i Action To
-l l
l l (1) l Hours. l (2)'
l Reactor l Report #
l Code l Code l
Prevent Recurrence l
l l
l l
(3) l 1
I
^
(4) l (5) l (C&CA) l-l i
. l I
i 1 192-l N/A l'
N/A l Continued Refueling Outage l
- 04/17/92l 5
i 1056 i
C l
1 ll N/A l
- 1004 I
I I
I I
I I
i i
i l
l l
l 1
I I
I I
I l
i I
I I
i i
i i
i i
UNIT SHUTDOWNS AND POWER REDCCTIONS l '
2 3
4
'1 F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failure 1-Manual for Preparation of Data (Explain) 2-Manual Scram Entry Sheets for Licensee B-Maintenarce or Test 3-Automatic Scram Event Report (LER)
C-Refueling 4-Continued File (NUREG-0161)
D-Regulatory Restriction 5-Reduced load E-Operator Training &
6-Other Licensing Exemination F-Administrative 5
G-Operational Er mr Exhibit 1-Saee Source (Explain) i i
H-Other (Explain)
I i
c h
a M00PMAY/SCMPFLR'
-,