ML20097D434

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for May 1992 for Cooper Nuclear Station
ML20097D434
Person / Time
Site: Cooper Entergy icon.png
Issue date: 05/31/1992
From: Gardner R, Kernes E
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CNSS928700, NUDOCS 9206100112
Download: ML20097D434 (5)


Text

..

l 4

- ym cm.< n ~ucu a n s1,1.o~

[@dd @% *v.w w -m==w= = =.==nwnw wwaw wxmwam m axn.an=ma ngam x

Nebraska Public Power Olstrict

" " " M"A7"Os'.1%^Y^ ""'

L CNSS928700 June 3, 1992 Dociunent Control Desk U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Monthly Operating Status Report for May 1992, Decket No. 50 298.

Gentlemen:

Enclosed for your information and use is the Cooper Nuclear Station Monthly Operating Status Report for May 1992.

The report includes Operating Status, Average Daily Unit Power Level, Unit Shutdown Data and a Narrative Summary of Operating Experience.

Should you have any connents, or require additional information regarding this report, please contact me.

Sincerely.

OYk R. L. Gardner Acting Division Manager of Nuclent Operations RLC:EAK: kap Enclosurt:

cc:

C. D. Watson w/ enclosures R. D. Martin w/ enclosures 100003

'If 9206100112 920531 PDR ADOCK 05000298 8

PDR

$0?hkS5$ $ ?SS$N$NYb{$b$ b h h$h E

$$$W bb $

$$hh $

"b_

OPERATING DATA REPORT DOCKET NO.

050 0298 UNIT CNS DATE June 3. 1992 OPERATING STATUS TELEPHONE (402) 825 5766 1.

Unit Nanw:

CooDor Nuclear Station Notes 8

ReportinD Porlod:

Mav 1992 3.

Uconsod Thermal Power (MWt):

2381 4.

Namoplate Rating (Gross MWe):

836 0.

Doolgn Electrical Rating (Not MWe): 778

- 6.

Maximum Dependable Capactif -(Gross MWe): JJ7 7.

Maximum Depondable Capacity (Not MWe):

764 8.

!! Changes occur in Cat acity Ratings (home Number 3 Thtc'Jgh 7) Since Last Report. Givo Renochs:

9.

Power Level To Which Rostrictod, If Any (Not MWe):

10.

Reasons For Restricton, if Any:,

This Month Yr.-to-Date Cumulative 11, Hours Ir. Apporting Period 744.0 3.647.0 157.0@A =

13.

Number of Hours Reactor Was Critical 744.0 3.413.1 119.913.4 13.

Reactor Roserve Shutdown Hours 0.0 0.0 0.0 14.

Hours Generator on-Une 744.Q 3.392.j,,

118.164 1 15.

Unit Resor' e Shutdown Houre 00 0.0 OA

-10c Gross Thermal EnerJy Generated (MWH) ;

1.767.864.0 7.927.416.0 241.483.4MA 17.

. Gro's Electric Enorgy Generated (MWH) 688.884.0 2.647.726.0

. JJ,217.878.0 18.

N(t Electric Energy Generated (MWH)

G72.244.0

. 2.5 @.614.0 75.499.001.0 10.

Unit Servico Factor 100 0 93.0 75._2_

20.

Unit Availability Factor 100.0 93.0 75.2 21, Unit Capacity Factor (Using :ADC Not) 100.7 27_2.

62 1 I

22.

UnN Capacity Factor (Using DER Nat) 96 9 90.5 61.8 23.

Unit Fort.ed Outage Rate OA -

3.7 4.5 l

24.

Shutdown Scheduled Over Next C Months (Type, Date, and Duration of Each):

s

- 25.

It Shut Down At End of Repor1 Period, Estimated Date of Startup:

l.

. 20i Units in Test Status (Prior to Commercial Operation):.

Forocast -

' Achioved

' INITIA1. CRfTIC %LITY INITIAL ELECTRICITY l

. COMMERCIAL OPERATION L

l,

i

~

AVERAGE DAILY UNIT POWER LEVEL DOCKET 7'3.

050-0298 Uli1T

_CNS DATE

_ June 3, 1992 TELEPHONE (402) 825-5766 MONTH May 1992 I

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL i

(MWe-Net)

(MWe-Net) 1 120 17 763 2

772 18 767 3

766 19 769 4

771 20 768 5

7 7 0,_,

21 767 6

770 22 767 7

771 23 770 8

772 24 767 9

771 25 770 10 765 26 773 11 770 27 773 12 769 28 772 13 767 29 768 14.

718 30 71,1 15 769 31 766 16 769 INSTRUCTIONS on this format, list the average daily unit power level in MWe-Net for each

' day in the reporting month.

Compute to the nearest whole megawatt.

L l

l

UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO-050-0206 UNIT NAME Cooper Nuclear Station DATE Jurw 3.1992 COMPLETED BY E. A. Kemes TELEPHONE (402)825-5766 REPORT MONTH May 1992 Method Of Licerrsee Cause& Correcbve 5

Duratiors Shuttrig Er~it System

  • Component Action to 2

3 No.

Date Type' (Hours)

Renon Down Reactor Report Code Code Prerent Recurrence P

NONE i

i n

I t

t t

i W

i p

I

+

1 F: Forced 2

Reasort 3 Method:

4 Exhibit G - Instruebonsfor S: Scheduled A - Eqeipment Fa3ure (Expr in; 1 - Manual Preparats of Data Entry a

B-MaintenanceorTest 2 - ManualScram Sheets for umsee Event 1

C-Refueling 3 - AutomaticScram Report (LER) File (NUREG4161)

D - Regulatory Restriction 4 - Contire;ed E - OperatorTraining & ticense Examinat;on 5 - Reduced Load 5 ExhibitI-Same Suce F - Adrrdnistrative 6 - Other G - Operational Error (Erplain)

H - Other (carplain) a

,s

~

s _-- --

4 4

~

AA.A w

,a,,

4 OPERATIONS NARRATIVE COOPER NUCLEAR STATION MAY 1992 NORMAL POWER OPERATION WAS EXPERIENCED FOR THE MONTli 0F MAY.

A CAPACITY FACTOR OF 100.7% WAS ACHIEVED FOR THE MONTH.

l t

l