ML20097C962

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DER 84-41 Re Adequacy of Cardinal Industrial Products Program for Supplier Qualification. Initially Reported on 840524.Final Rept Will Be Submitted by 840921
ML20097C962
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/31/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-30410-TDS, DER-84-41, NUDOCS 8409170332
Download: ML20097C962 (2)


Text

-

y 4

g

+%c) m 9 o :.

g Arizona Public Service Company go' August 31, 1984 ANPP-30410-TDS/KCP U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 84-41 A 50.55(e) Potentially Reportable Deficiency Relating To Adequacy Of Cardinal Industrial Products Program For Supplier Qualification.

File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between P. Narbut and T. Bradish on May 24, 1984 (B) ANPP-29809, dated June 22, 1984 (Interim Report)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B).

At that time, it was estimated that a Final Report would be available by August 31, 1984.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by September 21, 1984, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours, b

N E. E. Van Brunt, Jr APS Vice President Nuclear Production ANPP Project Director EEVB/KCP/nj cc: See Page Two 8409170332 840831 PDR ADOCK 05000528 8

PDR

_f. 8 ~ 27

L

!o ;

_q Mr. T. W. Bishop DER 84-41 Page Two cc:

. Richard DeYoung, Director Office of Inspection and Enforcement U.-S. Nuclear Regulatory Commission Washington, D. C. 20555 T. C. Woods, Jr.

D. 3. Karner W. E. Ide D. B. Fasnacht A. C. Rogers

.L. A. Souza.

D. E. Fowler T. D. Shriver C. N. Russo J. Vorees J. R. Bynum J. M. Allen.

J. A. Brand D. Canady A. C. Gehr W. J. Stubblefield l

W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen R. P. Zimmerman S. R. Frost L. Clyde i

M. Woods T. J. Bloom Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339

-~

-~, - - - -

,.,,.-.-,,,-n-.

~., --, - - -,,.c, c---,,m~r

.. ~,,,,----

,,e,,

-,,-