Interim Deficiency Rept DER 84-33 Re Incorrectly Installed Hanger Support Assembly.Initially Reported on 840504.Final Rept Will Be Transmitted by 840927
ML20097C945
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/29/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T, Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-30356-TDS, DER-84-33, NUDOCS 8409170324
Download: ML20097C945 (2)


Text

j^

}

g 58 0-I3 Ari n Public Service Company 6

August 29, 1984 ANPP-30356-TDS /TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T.-W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 84-33 A 50.55(e) Potentially Reportable Deficiency Relating To Incorrectly Installed Hanger Support Assembly.

File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between P. Narbut and T. Bradish On May 4, 1984 (B) ANPP-29642, dated June 4, 1984 (Interim Report)

(C) ANPP-30130, dated August 6,1984 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B), and a Time Extension was requested by Reference (C). At that time, it was estimated that a Final Report would be available by August 31, 1984.

A Final Report has been submitted to APS for review.

It is expected a Final Report will be transmitted to the NRC by September 27, 1984.

There is no new information or change to the Interim Report at this time.

Very truly yours, 4%

LL Gk E. E. Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Project Director EEVB/TRB/nj cc: See Page Two

.Sl/ :l Jg g _ g j

DUit 8409170324 840829 g)

~

PDR ADOCK 05000528 S

PDR

-g_

c s

1,.

o.

Mr. T. W. Bishop DER 84-33 Page Two cc: -

Richard DeYoung, Director Office of Inspection and Enforcement-U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo J. Vorees

- J. R. Bynum J. M. Allen J. A. Brand D. Canady A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen R. P. Zinnerman S. R. Frost L. Clyde M. Woods T. J. Bloom Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339 m..

m.

__, _