May 6
'92 9:20 4363 D QUICK PR1.TCRS 203-G0S'-9525 ye M,1_
. WISTERN UNION FSI RENOu NEVADA 69502-2375 04PM 1-004545$125002 05/04/92 MGM TDRN UNCASVILLE CTICS IPRRNCZ CSP NNVB 1 2030488124 05-04 0802P EST
.. y DONALD W DEL CORE: SR.
NUMBER 4 DRISCOLL DR UNCASVILLE CT 06382 THIS IS A CONFIRMATION COPY OF THE FOLLOWING MESSA
-e e
2038488124 ZIP MGMR TORN UNCASVILLE CT 149 05-04 0002P EST IVAN SELIN, CHAIRMAN USNRC WASHINGTON DC 20S55 DEAR CHAIRMAN SELIN:
ON DECEMBER 15 1991, WE THE UMDERSIGNED GENT'A LETTER TO YO FROM THE SEABROOK NUCLEAR POWE U AND THE FER (NAEC). WE IIAVE NOT RECEIVED A RESPONSE REGARD 1HG T DATE.
TER TO IN AN ASSOCIATED PRESS RELEASE PROM WASEINGTON DC TRANSFER IN A COMMISSION MEETING ON RAYTHA WE EAVE LEARNED 11 1992 SB REARING WOULD BE HELD TO PROPERLY ADDP.RS LIC ARE CLEARLY RAISED BY THIS PROPOSED
--~~
m...._..
THAt RESPONSE, VERY TRULY YOURS,
. NE ANAIT YOUR v
DONALD W DEL CORE, SR.AND TIMOTHY O'SULLIVAN 20:03 EST
~
MGMCOMP i
-~~A 9206020319 920529 ADOCK0500g3 pDR H
1.,
gg. ggygg =,,
l
t
.II.
SUMMARY
OF RESULTS V
!!.A. Overview During this SALP period, performance declined A al units.
for programmatic and/or equipment problems, including:
requalification retraining and erosion / corrosion; Unit 2 forUnit I for ope.'ator erosion / corrosion, steam generator geterator operability; and Unit 3 fo(r biofouling of the service water sys SG) tube leakage, and emergency diesel b
and erosion / corrosion. Notwithstanding these probicms outage safety ethic was cicarly evidenced at all three, units.a good operating and Significant additional resources and priority were given to problem areas r.oted in the last SALP such as the handling of employee safety concerns, personnel attention to detail, and procedere adherence.
in the area of radiologW1 controls and the handling of ' emergent safetyImprovin issues was noted. However, some programs Corrosion) were inconsistently implemented (e.g., Inservice Testing, Erosion /
$\\
ineffective corporate eWeerin across the three units, indicating period in the emergency pre.ther,g oversight and further need to co intra-unit experience, b'
performance weaknesses became evident this paredness and security areas which were not previously identified.
problem area at all three units.In addition, procedure adherence continued as a In response to NU and NRC identified declines in performance during the previous two years, NU initiated a number of evaluation efforts to assass their performance.
The results of their efforts and the follow-on management actions to correct these deficiencies portrayed a strong cocaiteent for improvement, but highlighted the inherent ineffectiveness of other established management programs (i.e., NRB/QA and other quality functions) to identify and correct the performance weaknesses noted.
NU's Performance Enhancement Program was under development at the end nf the SALP period, and its effectiveness remains to be evaluated by the NRC.
Signific int numbers of employee concerns continued to be relayed to tne NRC during this SALP period.
NU made to and resolving employee concerns; improvements to the process for responding however, the effectiveness of these chages also remains to be evaluated by the NRC.
Several significant organizational changes in the second half of the SALP period were taken by NU in an effort to improve engineering support and operational performance; however, it is too early to. judge the effectiveness of these changes.
As part of these changes, the role of the Station Director was strengthened towards tha end of the period by the removal of two levels of corporate management.
i m
J
!!.B. Facility Performance Analysis Swma*y Rating, Trend Rating, Trend fE E119.n_al Area last Perid IhisPeriod 1.
Plant Operations 1,1 Deci. 2 2,2,2 2.
Radiological Controls 2
MLintenance/ Surveillance 2, Improving 3.
1,2,1 2.2.2 4.
2 5.
Security 1
2 6.
Engineering / Technical Support 2
2 7.
Safety Assessment /0uality Verification 2
3 Previous Assessment Period: June 16, 1989, through December 15, 1990 (Millstone Units I and 2)
October 16, 1989, through December 15, 1990 (Millstone Unit 3)
Present Assessment Period:
December 16, 1990, through February 15,1992 4
W l${V N l 6 L
)
. ' '. ' /
jg UNITED $TATES NUCLE AR REGULATORY COMMIS$10N
[
3"c
.I
\\...../
EDO PrincipalHiCCTtuticastence Contro QT N
FROM:
DUE: 05/27/92 DO CONTROL: 0007747 f
DOC DT: 05/04/92 i
FINAL REPLY:
DONALD W.
DEL CORE, SR.
TIMOTHY O'SULLIVAN y [.rfyf m g p f y n.-
N'/ $<rf/ Muser wiry
[ro t q o W aJ CHAIRMAN SELIN (Y
f/ t lf 2-y FOR SIGNATURE OF:
- GRN CRC NO: 92-0388 MURLEY
^~'9 (ML 6 (,,n y, c 6 ESC:
ROUTING:
g f 4 y g m g g --
hd REF 12/15/91 LETTER TO THE ASLB AND CHAIRMAN SELIN TAYLOR RE SEABROOK LICENSE TRANSFER SNIEZEK THOMPSON DATE: 05/12/92 BLAHA RMARTIN ASSIGNED TO:
CONTACT:
SCINTO NRR MURLG1 SPECIAL INSTRUCTIONS OR REMARKS:
fitv / et%.* N PEYVag L
$4w bdb q}t/n G
w:sra,~
77ec fdcubay. 9Mn
??Lwpa 12ws fe&
AufS Sged d
/R &M ygQ ger>w ACT!0N DUE T0 ilrA D'R ca s 0FFICE Ob BY e
1 4
OFFICE OF Tile SECRETARY CORRESPO!!DENCE CONTROL TICKPT PAPER HUhdER:
CRC-92-0388 LOGGI!!G DATE: May 11 92 ACTION OFFICE:
EDO AUTilOR:
DEL CORE & O'SULLIVAN AFFILIATION:
ADDRESSEE:
CHAIRMAN SELIN LETTER DATE:
Dec 5 92 FILE CODE: ID&R-5 SEABROOK SUBJFCT:
REF 12/15/91 LTR TO Tile ASLB Ill REGARDS TO A LICEllSE TR ANSFER FM THE SEABROOK NUC POWER STATION TO t10RTllEAST UTILITIES ACTION:
Appropriate DISTR 7 BUTION :
CllAIRMAN, DSB, COMRS SPECIAL liANDLING: NONE CO!1STITUENT:
NOTES:
NO RECORD OF REFEREllCED LTR DATE DUE:
SIGNATURE:
DATE SIGNED:
AFFILIATION:
4 4
EDO --- 007747 92 0 3.2(f2./1-0 d rof6 OH. COO yaj)h'
~
vs W~
n.
EDUN K@ W DEL CORE, SR.
m6vv
?
)f
. NUMBER 4 DRISCOLL DR T
j '(
{
UNCASVILLE CT 06382 04PM
'h., i s,
~'(iffyd. kl9 23 #V g
f gi rg q.g b
s h*
h hb 1-0045453125 05/04/92 ICS IPMRNCZ CSP WHSB t
}
2038488124 MGMB TDRN UNCASVILLE CT 149 05-04 0802P EST I
C L
- l'
, b > IVAN SELIN, CHAIRMAN ii USNRC O
WASHINGTON DC 20555 O
O DEAR CHAIRMAN SELIN:
O ON DECEMBER 15 1991, ATOMIC SAFETY AND LICENSING BOARD IN REGARDS TO >WE O
FROM THE SEABROOK NUCLEAR POWER STATION TO NORTHEAST UTIL (NAEC). WE HAVE NOT RECEIVED A RESPONSE REGARDING THAT LETTER TO DATE.
O IN AN ASSOCIATED PRESS RELEASE FROM WASHINGTON DC, WE HAVE LEARNED TRANSFER IN A COMMIS9 ION MEETING ON MAYTHAT TH O
11 1992. AS YOU ARE AWARE, WE HEARING WOULD BE HELD TO PROPERLY ADD
[O ARE CLEARLY RAISED BY THIS PROPOSED LICEN RESP NSE. vERY TRULY YOuRS, WE AWAIT YOUR O
DONALD W DEL CORE, SR.AND TIMOTHY O'SULLIVAN O__