MONTHYEARML20212H5071999-09-27027 September 1999 Application for Amends to Licenses DPR-44 & DPR-56,change Application ECR 96-01511,to Revise TS Re Loss of Power Setpoints for 4 Kv Emergency Buses ML20211M7081999-09-0101 September 1999 Suppl License Change Application ECR 99-01497 for Licenses DPR-44 & DPR-56,correcting Minor Discrepancies Discovered in Pages of Attachment 2 ML20210P8811999-08-11011 August 1999 Application for Amends to Licenses DPR-44 & DPR-56 in Order to Clarify PBAPS Licensing Basis to Include Specific Info Re Allowed Containment Overpressure Credit Needed to Ensure Adequate NPSH Available for ECCS Pumps.Ufsar Changes,Encl ML20210N0711999-08-0606 August 1999 Exigent License Change Application ECR 99-01727 for Licenses DPR-44 & DPR-56,incorporating Note Into TS Which Will Permit one-time Exemption Until 990930,from 90 F Limit Stated in SR 3.7.2.2 ML20209F7641999-07-12012 July 1999 License Change Application ECR 99-01255,revising TS Sections 2.1.1.2 & 5.6.5 by Incorporating Revised SLMCPR & Deleting Previously Added footnotes.Non-proprietary & Proprietary Info Re Slmcpr,Encl.Proprietary Info Withheld ML20209B9141999-07-0101 July 1999 Application ECR 99-01497 for Amend to Licenses DPR-44 & DPR-56,reflecting Change in Corporate Structure ML20205F6221999-03-29029 March 1999 Application for Amends to Licenses DPR-44 & DPR-56,revising TS to Delete Requirement for Refuel Platform Fuel Grapple Fully Retracted Position Interlock Currently Required by TS Surveillance Requirement 3.9.1.1 ML20207E2421999-03-0101 March 1999 License Amend Request ECR 98-01802 for Licenses DPR-44 & DPR-56,proposing Changes to Support PBAPS Mod P00507 Which Will Install Digital Power Range Neutron Monitoring Sys & Incorporate long-term T/H Stability Solution Hardware ML20198N2471998-12-24024 December 1998 License Change Application ECR 96-01511,revising Setpoints & Limits of Allowable Values for LOP Instrumentation for 4kV Emergency Buses Contained in TS Table 3.3.8.1-1, LOP Instrumentation ML20236R3011998-07-10010 July 1998 Application for License Change ECR 98-01403,requesting Change to License DPR-44 Revising TS Section 2.0 & non-proprietary & Proprietary Versions of 980609 Addl Info Re 1.10 Cycle Specific Slmcpr.Proprietary Version Withheld ML20247C2481998-05-0101 May 1998 License Change Application ECR 98-00499 for Amends to Licenses DPR-44 & DPR-56,revising TS to Delete Requirements for Functional Testing of SRVs During Each Unit Startup ML20217G7481998-03-20020 March 1998 License Change Application ECR 97-02809,revising Tech Specs to Incorporate end-of-cycle Recirculation Pump Trip Sys at Units 1 & 2 ML20217Q4631998-03-0202 March 1998 Application for Amend to License DPR-12,adding Requirements to TS to Achieve Compliance w/10CFR50.36a, TS on Effluents from Nuclear Power Reactors ML20202F4151998-02-0404 February 1998 Application for Amends to Licenses DPR-44 & DPR-56,revising SR 3.6.4.1.2 & Associated Bases to Reflect Changes in Requirements for Secondary Containment Doors ML20211H9171997-09-26026 September 1997 Application for Amend to License DPR-56,deleting Submitted Page 2.0-1 to Be Replaced W/Encl Page 2.0-1 & Adding Page 5.0-21 for Unit 3 ML20141G4821997-06-30030 June 1997 License Change Request ECR 96-03620,revising TS Section 2.0, Safety Limits to Incorporate Revised SLMCPRs Due to Use of GE13 Fuel Product Line & cycle-specific Analysis Performed by GE ML20140D8501997-06-0404 June 1997 License Change Application ECR 97-00086,revising TS Section 3.8.2.1 to Eliminate Inconsistency Between Requirements for ECCS Operability & auto-start & Trip Bypass of EDGs on ECCS Initiation During Listed Events ML20141L0081997-05-23023 May 1997 License Change Application ECR 96-02324,revising Section 5.5.12 to Exclude Measured Main Steam Isolation Valves Leakage from Total Type B & C Local Leak Rate Test Results ML20141E0721997-05-0909 May 1997 License Change Application ECR 96-00982,revising TS SR 3.6.1.3.16 Re Replacement Frequency of Primary Containment Purge & Exhaust Valve Inflatable Seals ML20141A7861997-05-0505 May 1997 Application for Amend to Licenses DPR-44 & DPR-56,requesting Approval for Implementation of Plant Mod to ECCS Pumps in Order to Satisfy Recommendations Stipulated in NRC Bulletin 96-003 ML18102B0071997-04-30030 April 1997 Application for Amends to Licenses DPR-40,DPR-56,DPR-70 & DPR-75,requesting Consent of NRC for Indirect Transfer of Control of Interest in Plants That Will Occur Under Proposed Merger ML20137P7511997-03-31031 March 1997 License Change Request ECR 96-00627,extending Surveillance Interval for Calibr of Average Power Range Monitor Flow Bias Instrumentation from 18 Months to 24 Months ML20134F6091996-10-30030 October 1996 Application for Amend to License DPR-56,revising Slmcprs,Ts Section 2.0,by Incorporating Rev Due to GE Determination That Previous Calculation Is non-conservative ML20117L2821996-09-0606 September 1996 Application for Amends to Licenses DPR-44 & DPR-56 Adding Notes to Allow Core Spray & LPCI Pumps to Start out-of- Sequence Under Certain Conditions & Adding Notes to Selected Surveillance Requirements ML20117F9321996-08-27027 August 1996 Application for Amends to Licenses DPR-44 & DPR-56, Correcting Administrative Error in TS Re CRD Charging Water Header Pressure for Shutdown Margin Test ML20117H6711996-08-23023 August 1996 License Change Request 96-01 to Licenses DPR-44 & DPR-56, Revising TS Section 2.0, Safety Limits to Incorporate New Safety Limit Min Critical Power Ratios,Due to Use of GE13 Fuel Product Line ML20117M6981996-06-13013 June 1996 License Change Request ECR 96-02011 to License DPR-44, Permitting One Time Performance of SR 3.3.1.1.12 for APRM Flow Biased High Scram Function,W/Delayed Entry Into Associated TS Conditions & Required Actions for Up to Six H ML20101K7961996-03-25025 March 1996 License Change Request 96-01 to Licenses DPR-44 & DPR-56, Revising TS Section 2.0, Safety Limits ML20100J7361996-02-15015 February 1996 License Change Request 95-11 to Licenses DPR-44 & DPR-56, Reflecting Implementation of 10CFR50,App J,Option B ML20095J1251995-12-21021 December 1995 TS Change Request 95-08,eliminating Outdated Matl from FOLs & Making FOL for Unit 2 Consistent W/Fol for Unit 3 ML20095J6971995-12-19019 December 1995 TS Change Request 95-13 to Licenses DPR-44 & DPR-56, Correcting Administrative Error in Improved Tech Specs Re Ventilation Filter Testing Program ML20095A1621995-11-30030 November 1995 Application for Amends to Licenses DPR-44 & DPR-56, Consisting of Change Request 95-12,changing Minimum Allowable Control Rod Scram Accumulator Pressure & Charging Water Header Pressure from Value of 955 Psig to 940 Psig ML20094Q6541995-11-21021 November 1995 Application for Amends to Licenses DPR-44 & DPR-56,changing SR for High Pressure Test of the HPCI & RCIC Sys. Administrative Change Proposed to Eliminate Ref to Section Previously Eliminated ML20092L6251995-09-22022 September 1995 Informs of Change to Pbaps,Units 2 & 3 TS Bases,Figure 1.1-1.Change Allows PBAPS Units 2 & 3 to Maximize Generation Throughout Entire Fuel Cycle ML20092A2071995-09-0101 September 1995 Application for Amend to License DPR-56,consisting of Change Request 95-07,deleting License Condition 2.C ML20092B9361995-08-28028 August 1995 Rev E to TS Change Request (Tscr) 93-16 to Licenses DPR-44 & DPR-56 Re Implementation of Improved Ts.Rev E to Tscr 93-16 Redesignates Change Control Mechanism from 10CFR50.59,as Indicated Previously,To 10CFR50.54(a) for Six Listed Items ML20086Q4271995-07-21021 July 1995 Application for Amends to Licenses DPR-44 & DPR-56,proposing Overall Conversion of Current PBAPS TS to Improved TS as Contained in NUREG-1433, Std Ts,Ge Plants,BWR/4 ML20083Q7341995-05-16016 May 1995 Rev a to Tscr 93-16 Re Conversion to Improved TSs as Contained in NUREG-1433 ML20083K8581995-05-0909 May 1995 Application for Amend to Licenses DPR-44 & DPR-56,consisting of Change Request 93-16 Re Conversion of Current PBAPS TS to Improved TS ML20082M3191995-04-12012 April 1995 Suppl 2 to License Change Request 94-08,supporting Mod P00068-3,which Upgrades Major Components of TIP Sys to Correct Typo.Revised TS Page 186 Encl ML20087H0411995-04-10010 April 1995 Application for Amends to Licenses DPR-44 & DPR-56, Consisting of Change Requests 94-11,94-12 & 94-13,relocating Certain Review & Audit Requirements to Plant UFSAR ML20082B2121995-03-23023 March 1995 Revised Page 4 to TS Change Request 90-03 ML20082B0491995-03-22022 March 1995 License Change Request 95-04 to Licenses DPR-44 & DPR-56, Reducing Local Leak Rate Test Hold Time Duration from One H to 20 Minutes ML20081H1261995-03-16016 March 1995 Application for Amends to Licenses DPR-44 & DPR-56 Re Requirements for SRMs While in Refueling Condition ML20080H0401995-02-10010 February 1995 Application for Amends to Licenses DPR-44 & DPR-56, Correcting Administrative Errors Made During Past TS Changes ML20078A0531995-01-17017 January 1995 Application for Amends to Licenses DPR-44 & DPR-56,proposing to Change Source Range Monitor to Range Neutron Monotors & Delete Intermediate Range Monitors ML20077S6191995-01-13013 January 1995 License Change Request 94-07 to Licenses DPR-44 & DPR-56, Revising Allowed Time Between Signal Calibrs of LPRM from Every 6 Wks (Approx 1,000 EFPH) to Every 2,000 Megawatt Days Per Std Ton ML20077S4691995-01-13013 January 1995 License Change Request 94-08 to Licenses DPR-44 & DPR-56, Revising TS Tables 3.7.1 & 3.7.4 to Reflect Reduction in Number of Primary Containment Power Operated Outboard Valves for TIP Probes,Per PBAPS Mod P00068 ML20078L7541994-11-21021 November 1994 TS Change Request 94-14 to License DPR-56,re One Time Schedular Exemption from 10CFR50,App J,Section III.D.1(a) Concerning 10CFR50,App J Type a Test Intervals ML20078K7601994-11-17017 November 1994 License Change Request 93-13 to Licenses DPR-44 & DPR-56, Revising TS to Support Mods 5384 & 5386,upgrading Main Stack & Vent Stack Radiation Monitoring Sys 1999-09-27
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217K9761999-10-14014 October 1999 Amend 234 to License DPR-56,changing TS in Response to 990301 Application & Suppls ,1001 & 06,to Support PBAPS Mod P00507,which Will Install Digital Pr Neutron Monitoring Sys ML20217B4261999-10-0505 October 1999 Amend 233 to License DPR-56,changing Minimum Critical Power Ratio Safety Limit & Approved Methodologies Referenced in Core Operating Limits Repts ML20212H5071999-09-27027 September 1999 Application for Amends to Licenses DPR-44 & DPR-56,change Application ECR 96-01511,to Revise TS Re Loss of Power Setpoints for 4 Kv Emergency Buses ML20216H6891999-09-24024 September 1999 Amends 229 & 232 to Licenses DPR-44 & DPR-56,respectively, Delete SR Associated Only with Refueling Platform Fuel Grapple Fully Retracted Position Interlock Input,Currently Required by TSs SR 3.9.1.1 ML20211M7081999-09-0101 September 1999 Suppl License Change Application ECR 99-01497 for Licenses DPR-44 & DPR-56,correcting Minor Discrepancies Discovered in Pages of Attachment 2 ML20211D5471999-08-23023 August 1999 Amends 228 & 231 to Licenses DPR-44 & DPR-56,respectively, Revising TSs to Correct Typo & Editorial Errors Introduced in TSs by Previous Amends ML20210P8811999-08-11011 August 1999 Application for Amends to Licenses DPR-44 & DPR-56 in Order to Clarify PBAPS Licensing Basis to Include Specific Info Re Allowed Containment Overpressure Credit Needed to Ensure Adequate NPSH Available for ECCS Pumps.Ufsar Changes,Encl ML20210N0711999-08-0606 August 1999 Exigent License Change Application ECR 99-01727 for Licenses DPR-44 & DPR-56,incorporating Note Into TS Which Will Permit one-time Exemption Until 990930,from 90 F Limit Stated in SR 3.7.2.2 ML20209F7641999-07-12012 July 1999 License Change Application ECR 99-01255,revising TS Sections 2.1.1.2 & 5.6.5 by Incorporating Revised SLMCPR & Deleting Previously Added footnotes.Non-proprietary & Proprietary Info Re Slmcpr,Encl.Proprietary Info Withheld ML20209B9141999-07-0101 July 1999 Application ECR 99-01497 for Amend to Licenses DPR-44 & DPR-56,reflecting Change in Corporate Structure ML20205K7371999-04-0707 April 1999 Amends 227 & 230 to Licenses DPR-44 & DPR-56,respectively, Consisting of Changes to TS SRs Re Secondary Containment Doors in Response to 980204 Application,As Revised by ML20205F6221999-03-29029 March 1999 Application for Amends to Licenses DPR-44 & DPR-56,revising TS to Delete Requirement for Refuel Platform Fuel Grapple Fully Retracted Position Interlock Currently Required by TS Surveillance Requirement 3.9.1.1 ML20207E2421999-03-0101 March 1999 License Amend Request ECR 98-01802 for Licenses DPR-44 & DPR-56,proposing Changes to Support PBAPS Mod P00507 Which Will Install Digital Power Range Neutron Monitoring Sys & Incorporate long-term T/H Stability Solution Hardware ML20198N2471998-12-24024 December 1998 License Change Application ECR 96-01511,revising Setpoints & Limits of Allowable Values for LOP Instrumentation for 4kV Emergency Buses Contained in TS Table 3.3.8.1-1, LOP Instrumentation ML20155C6011998-10-26026 October 1998 Amend 226 to License DPR-44,revising TSs for Safety Limit MCPR from Current Value of 1.11 to 1.10 for Two Recirculation Loop Operation & from 1.13 to 1.12 for Single Recirculation Loop Operation ML20154H4691998-10-0505 October 1998 Amends 225 & 229 to Licenses DPR-44 & DPR-56,respectively, Revising TSs to Permit Incorporation of EOC-RPT Sys at Plant,Units 2 & 3 ML20154J2261998-10-0505 October 1998 Amends 224 & 228 to Licenses DPR-44 & DPR-56,respectively, Revising TSs to Delete Requirements for Functional Testing of SRVs During Each Unit Startup ML20154G6551998-10-0101 October 1998 Amends 223 & 227 to Licenses DPR-44 & DPR-56,respectively, Revising Plant,Units 2 & 3 TSs to Exclude MSIV Leakage from Total Type B & Type C Local Leak Rate Test Results ML20153B9581998-09-14014 September 1998 Amend 9 to License DPR-12,adding Requirements for Control of Effluents & Annual Reporting Per 10CFR50.36a ML20238F2611998-08-24024 August 1998 Amend 222 to License DPR-44,revising Pbaps,Unit 2 TSs to Support Mod P00271,which Would Replace SRMs & IRMs W/Wrnms, During Forthcoming Outage 2R12,scheduled for Early Oct 1998 ML20236R3011998-07-10010 July 1998 Application for License Change ECR 98-01403,requesting Change to License DPR-44 Revising TS Section 2.0 & non-proprietary & Proprietary Versions of 980609 Addl Info Re 1.10 Cycle Specific Slmcpr.Proprietary Version Withheld ML20247C2481998-05-0101 May 1998 License Change Application ECR 98-00499 for Amends to Licenses DPR-44 & DPR-56,revising TS to Delete Requirements for Functional Testing of SRVs During Each Unit Startup ML20217G7481998-03-20020 March 1998 License Change Application ECR 97-02809,revising Tech Specs to Incorporate end-of-cycle Recirculation Pump Trip Sys at Units 1 & 2 ML20217Q4631998-03-0202 March 1998 Application for Amend to License DPR-12,adding Requirements to TS to Achieve Compliance w/10CFR50.36a, TS on Effluents from Nuclear Power Reactors ML20202F4151998-02-0404 February 1998 Application for Amends to Licenses DPR-44 & DPR-56,revising SR 3.6.4.1.2 & Associated Bases to Reflect Changes in Requirements for Secondary Containment Doors ML20212G8261997-10-24024 October 1997 Amends 221 & 226 to Licenses DPR-44 & DPR-56,respectively, Changing TSs to Eliminate Inconsistency Between ECCS Operability Requirements & Autostart & Protective Trip Bypass of EDGs on ECCS Initiation Signal ML20217J5571997-10-0909 October 1997 Amend 225 to License DPR-56,revising MCPR Safety Limit in Section 2.1 of TSs from 1.07 to 1.11 for Two Recirculation Loops in Operation ML20217D8101997-09-30030 September 1997 Amend 224 to License DPR-56,revises TS to Support PBAPS Mod P00271,which Would Replace Source Range & Intermediate Range Monitors W/Wide Range Neutron Monitoring System ML20211H9171997-09-26026 September 1997 Application for Amend to License DPR-56,deleting Submitted Page 2.0-1 to Be Replaced W/Encl Page 2.0-1 & Adding Page 5.0-21 for Unit 3 ML20216G5321997-09-0404 September 1997 Amends 220 & 223 to Licenses DPR-44 & DPR-56,respectively, Revising TS to Extend Replacement Frequency for Inflatable Seat Seals for Primary Containment Purge & Vent Valves to 96 Months ML20217M7961997-08-19019 August 1997 Amends 219 & 222 to Licenses DPR-44 & DPR-56,respectively, Extending APRM Flow Bias Instrumentation Surveillance Interval from 18 Months to 24 Months ML20141G4821997-06-30030 June 1997 License Change Request ECR 96-03620,revising TS Section 2.0, Safety Limits to Incorporate Revised SLMCPRs Due to Use of GE13 Fuel Product Line & cycle-specific Analysis Performed by GE ML20140D8501997-06-0404 June 1997 License Change Application ECR 97-00086,revising TS Section 3.8.2.1 to Eliminate Inconsistency Between Requirements for ECCS Operability & auto-start & Trip Bypass of EDGs on ECCS Initiation During Listed Events ML20141L0081997-05-23023 May 1997 License Change Application ECR 96-02324,revising Section 5.5.12 to Exclude Measured Main Steam Isolation Valves Leakage from Total Type B & C Local Leak Rate Test Results ML20141E0721997-05-0909 May 1997 License Change Application ECR 96-00982,revising TS SR 3.6.1.3.16 Re Replacement Frequency of Primary Containment Purge & Exhaust Valve Inflatable Seals ML20141A7861997-05-0505 May 1997 Application for Amend to Licenses DPR-44 & DPR-56,requesting Approval for Implementation of Plant Mod to ECCS Pumps in Order to Satisfy Recommendations Stipulated in NRC Bulletin 96-003 ML18102B0071997-04-30030 April 1997 Application for Amends to Licenses DPR-40,DPR-56,DPR-70 & DPR-75,requesting Consent of NRC for Indirect Transfer of Control of Interest in Plants That Will Occur Under Proposed Merger ML20137P7511997-03-31031 March 1997 License Change Request ECR 96-00627,extending Surveillance Interval for Calibr of Average Power Range Monitor Flow Bias Instrumentation from 18 Months to 24 Months ML20135B3851997-02-19019 February 1997 Amends 218 & 221 to Licenses DPR-44 & DPR-56,respectively, Changing Min Allowable Charging Water Header Pressure from Value 955 Psig to Value of 940 Psig in TS 3.10.8 ML20134F6091996-10-30030 October 1996 Application for Amend to License DPR-56,revising Slmcprs,Ts Section 2.0,by Incorporating Rev Due to GE Determination That Previous Calculation Is non-conservative ML20117L2821996-09-0606 September 1996 Application for Amends to Licenses DPR-44 & DPR-56 Adding Notes to Allow Core Spray & LPCI Pumps to Start out-of- Sequence Under Certain Conditions & Adding Notes to Selected Surveillance Requirements ML20117F9321996-08-27027 August 1996 Application for Amends to Licenses DPR-44 & DPR-56, Correcting Administrative Error in TS Re CRD Charging Water Header Pressure for Shutdown Margin Test ML20117H6711996-08-23023 August 1996 License Change Request 96-01 to Licenses DPR-44 & DPR-56, Revising TS Section 2.0, Safety Limits to Incorporate New Safety Limit Min Critical Power Ratios,Due to Use of GE13 Fuel Product Line ML20117M6981996-06-13013 June 1996 License Change Request ECR 96-02011 to License DPR-44, Permitting One Time Performance of SR 3.3.1.1.12 for APRM Flow Biased High Scram Function,W/Delayed Entry Into Associated TS Conditions & Required Actions for Up to Six H ML20101K7961996-03-25025 March 1996 License Change Request 96-01 to Licenses DPR-44 & DPR-56, Revising TS Section 2.0, Safety Limits ML20100J7361996-02-15015 February 1996 License Change Request 95-11 to Licenses DPR-44 & DPR-56, Reflecting Implementation of 10CFR50,App J,Option B ML20095J1251995-12-21021 December 1995 TS Change Request 95-08,eliminating Outdated Matl from FOLs & Making FOL for Unit 2 Consistent W/Fol for Unit 3 ML20095J6971995-12-19019 December 1995 TS Change Request 95-13 to Licenses DPR-44 & DPR-56, Correcting Administrative Error in Improved Tech Specs Re Ventilation Filter Testing Program ML20095A1621995-11-30030 November 1995 Application for Amends to Licenses DPR-44 & DPR-56, Consisting of Change Request 95-12,changing Minimum Allowable Control Rod Scram Accumulator Pressure & Charging Water Header Pressure from Value of 955 Psig to 940 Psig ML20094Q6541995-11-21021 November 1995 Application for Amends to Licenses DPR-44 & DPR-56,changing SR for High Pressure Test of the HPCI & RCIC Sys. Administrative Change Proposed to Eliminate Ref to Section Previously Eliminated 1999-09-27
[Table view] |
Text
.
PillLADEl.I'lilA El.ECTRIC COMi%NY NUCLEAR GROUP HEADQUARTERS 955-65 CHESTERDROOK IILVD.
WAYNE, l'A 19087-3691 (215) 640-6000 NUCLEAN ENGINEERING & St.RVICES DEPAirTMENT 10 CFR 50.90 May 18, 1992 Docket Nos. 50-277 50-278 License Nos. DPR-44 DPR-56 U.S. Nuclear Regulatory Commission Attn: Dccument Control Desk Washington,- C 2055L
SUBJECT:
Peach Bottom Atomic Power Station, Units 2 and 3 Technical Specifications Change Request 92-02
Dear Sir:
Philadelphia Electric Company (PEco) hereby submits Technical Specifications Change Request (TSCR) No. 92-02, in j
accordance with 10 CFR 50.90, requesting a change to Appendix A of the Peach Bottom Facility Operating Licenses. The proposed changes concern extending the frequency of inspecting and replacing the r
Main Steam Safety Valves (SV) and Relief Valves (RV) from every
- . refuel outage to a 24' month testing interval (i.e., a maximum of 30 months accounting for the allowable grace period). This change is being requested to support a change to a 24 month fuel cycle at Peach Bottom. To analyze the offacts of the change to a 24 month fuel cycle the guidelines propagated in NRC Generic Letter 91-04,
" Changes In Technical Specitication Surveillance Intervals to Ace:ommodate a 24 - Month - Fuel Cycle" were f ollowed.
As discussed in our February 11, 1992 letter (D. R.
Helwig to USNRC)-additional requests will be u bmitted to address all of the offects of a 24 month fuel-cycle; L wever, because of -
the impact on operations and outage scheduling at Peach Bottom we are' requesting that this change be reviewed and approved-by September 1992.
Attachment I to this letter describes the proposed changes, and provides justification for the changes. Attachment 2 contains the revised Technical Specification pages.
9205260245 920518 PDR ADOCK 05000277 A ng/
P PDR jyV l{ l -
U .$ , Nuclear llegulatory Commission May 18, 1992 TSCR 892-02 Page 2 l .
If you hrve any questions regarding this matter, please contact us.
Very truly yours, h g.[ d OL
/G . J. Beck, Manager Licensing Section
Enclosures:
Affidavit, Attachment 1, Attachment 2 cc: T. T. Martin, Adlainistrator, Region I, USNRC J. J. Lya6h, USNRC Senior Resident Inspector, PBAPS W. P. Dornsife Commonwealth of Pennsylvania 1
\
~
_ - - _ . . _ - . . . _ _ _ ____-_-_____m__ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , ,
_ _ . . _ _ _ _ . _ _ ~ _ _ . . _ . . . . _ _ . . . . _ . _ .
_________.______m._ _ _ _ _
I l
COkMONWEALTil OF PENNSYINANI At 4
83.
COUNTY OF CHESTER :
D. R. Helwig, being first duly sworn, deposes and says !
That he is Vice_ President of e.iladelphia Electric Company; a
the Applicant herein; that he has read the attached Technical Specifications Change Request (Number 92-02) for Peach Bottom Facility _ Operating Licenses DPR-44 and DPR-56, and knows the contents'thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, i
~
information and belief.
r t .
4 J. *< [ 7
.Vice President l
l Subscribed and sworn to before me this c9dkay of Y MI 1992.
d l (
d' , , .
?
_Jal; -
d M._ AI jj y
Notary Public Notai2Soal l
Efica A Srnon, bhay Pt No -
Trt@ T*o. Chew
. My Comnwan Egres Ab10. P35 .
ATTACilMENT 1 >
PEAC11 BOTTOM ' ATOMIC POWER STATION UNITS 2 AND 3-I Docket Nos. 50-277- !
50-278 License Nos. DPR-44 DPR-56.
TECl!NICAL SPECIFICATION CHANGE REQUEST 92-02 l
" Change to the Frequency of Main Steam Safety and Rollof Valve Inspections and Tests" l
Supporting Information for Changes 4 Pages t
l L
l l
Docket Nos. 50-277 50-278 License Nos. DPR-44 DPR-56 Philadelphia Electric Company (PECo), Licensee under Facility Operating Licenses DPR-44 and DPR-56 for the Peach Bottom Atomic Power Station (PBAPS) Unit No. 2 and Unit No. 3, respectively,
, requests that the Technical Specifications contained in Appendix A to the Operating Licenses be amended. Proposed changes to the Technical Specifications are indicated by vertical bars in the margin of page 147. The proposed revised page 147 for each unit are included in Attachment 2.
The proposed changes are being requested to support changing the fuel cycle at PBAPS from 18 to 24 months. In reviewing the effects of this change PECo made a conservative assumption that
- aurveillance frequencies defined as either " REFUEL OUTAGE" or "OFERATING CYCLE" were to be considered as an 18 month interval with a 25 percent grace period. In completing the analysis of the ,
l effects of changing to a 24 month cycle with a 25 percent grace period it became apparent that some changes would have a much more
. severe impact on operations and outage planning than others. The ;
impact of this determination was discussed in our February 11, 1992 .
letter (D. R. Helwig to USNRC) and as discussed in that letter these changes were identified and labelled as PRIORITY I changes. ;
This request includes the single PRIORITY I change identified at PBAPO. Additional offects are being evaluated and a change request which addresses those changes will be submitted by July 1992. The
- original schedule submitted in the February 11, 1992 letter i indicated that_these additional change requests would be submitted in June; however, that schedule has now been extended to July of i 1992. This change request should be considered a single change and we are. requesting that this change be reviewed and approved by September 30, 1992. This date is'being requested bt.ause the subject TS requirements have a significant impact on outage scheduling.
Description of Changes (1) The Licensee proposes a change to Section 4.6.D of the <
PBAPS TS. _This section defines the inspection and testing requirements of the Main Steam Line Safety (SV) and Relief Valves (RV). The SVs and RVs are installed at PBAPS to prevent overpressurization of the reactor coolant precsure boundary. All RVs can be manually operatod for depressurization. Five of the RVs have the additional safety-function of automatically depressurizing the reactor to permit the Low Pressure Coolant Injection (LPCI) and Core Spray-(CS) systems to
- operate. In this Automatic Depressurization System (ADS) modo the five.RVs provide a backup to the High Pressure Coolant Injection (HPCI) system. ;
I I
~
c-,-- p--y--, m-ym-,,w_r,,_.,,..... m ,% .- % . , . -,,,,w-%.w_,-,__,-__.,_m._,.m.-,, _ , . . _ _ . _ _ , , , _ _ , . _ , . . _ . , , , , , , , _ . . _ . . . _ ..._._.-[
--.~.. - . .- -..-~. - ~.. - - - _ _ - - .
Docket Nos. 50-277 50-278 License Nos. DPR-44 DPR-56 The testing of the SV and RV provides assurance that if required these valves will be able to perform their design function. The current TS Section 4.6.D requires j that at least one safety valve and 5 relief valves be '
checked or replaced with bench tested relief valvos once :
per operating cycle. The RV and SV are required to meet !
a TS set pressure acceptance criteria of plus or mit.us one (1) percent. For performing the historical review ,
, recommended by Generic Letter (GL) 91-04 those previous tests in which the valve failed the TS limit were ;
considered as failures. The proposed section 4.6.D will read:
"At least one safety valve and 5 relief valves shall :
be-checked or replaced with bench checked valves !
every 24 months. All valves will be tested every two_ cycles." (emphasis added)
L The reference to testing all valves every two cycles was reviewed under a 10 CFR 50.59 evaluation. It was ,
determined that it .is acceptable to test all valves every 54 months - two 24 month operating cycles with a single 6 month grace period. It should be noted that the reference to "two cycles" in the quoted section of TS is being interpreted as an 18 month fuel cycle. This ;
interpretation is consistent wJth the current definition section of PBAPS TS. This and.all other references to
" cycles" will continue to be interpreted as an 18 month cycle unt.11 all of the effects of changing the def.inition !
of cycle to 24 months have been evaluated and approved. ;
(2) The Licensee proposes a change to Section 4.6.D.2 of the
! PBAPS TS. This section defines the-frequency to l- disassemble and LLspect a relief valve. This l survell]ance requirement is meant to detect possible deteriorations that could affect relief valve performa' O. The current Section 4.6,0.2 requires at least onu relief valve be disassembled and inspected each .
refueling outage. The proposed TS 4.6.D.2 will read:
L "At least one of the relief valves shall be L disassembled and inspected every 24 months" r l
[emphak > added)
Safety Discussion !
l The NRC GL 91-04 provided guidelines for dctermining the safety impact of a change required to go to a 24 month fuel cycle. As recommended by the GL, PEco evaluated the- ,
effect on safety of the change in surveillances intervals ;
i
.-.-.. , - .-. _ . - - . ~ -.. .. - - - - .., . , - . ~ , . . . . . , . . . ...,-..-.n..-_.-_.--. -.-n - , , . , - , ~ , - , , - . , , - - ,
_ - ._. _ _ m..___ _ _ _ . - - _ . - . _ _ . _ . . _ _ _ _ . -
Docket Nos. 50-277 50-270 License Nos. DPR-44 DPR-56 to accommodate a 24 month fuel cycle. This evaluation concluded that this proposed amendment does nots (1) involve a significant jncrease in the probability or
! consequences of an accident previously evaluated; or (2) create the possibility of a new or different kind of i accident from any accident pt. 'tously evaluated; or (3) involve a significant reductic in a margin of safety.
, From this determination it was concluded that the effect on safety is small. In addition, PEco confirmod that the historical maintenance and survoillance data support this conclusion. F
, Specifically, the historical data is summarized below.
I Change Request (1) ;
i A review of the ST documentation identified that a total of 6 SV tests and 30 RV tests were performed since 1987; ,
when as found data was first taken or recorded. A review of the as found data did not identify any time based failure mechanism; therefore, PECo has concluded that extending the surveillanco frequency for this TS requironent will not have an adverse effect on safety.
Change Request (2)
A review of the Surveillance test documentation identifjed that at least 9 RV disassemblies and inspections were performed for the two unitu since 1982 with no documented problems. Therefore, PECo has concluded that extending the surveillance frequency for this TS requirement will not have an adverse affect on ,
safety.
_ N_o_
o Significant flazards Consideration The two change requests proposed in this Application do not constitute a significant hazards consideration in that:
- 1) The proposed' changes do not involve a significant increase in the-probability or consequences of an ,
accident previously_ evaluated because the availability and response of the valvtv b the event of an accident is unchanged. The changes;beihy proposed do not change any of the accident precursors; therefore, the probability of an accident remains the same. The e:va11 ability of the valves to mitigate the consequences of an accident remain essentially the same. Any change in the possibility of a failure in these valves due to less frequent testing is insignificant given that the surveillance history does l not indicate any time based failure mechanism.
l i
..m._ __ _ _ _ _ . _ _ _ . _ _ _ _. _ . . _ - - __.____ ___ _.
Docket Nos. 50-377 '
50-270 License Nos. DPR-44 ;
DPR-56
- 11) The proposed;,,c,har1ges__do not create the possibility of a new or different kind of accident from any previously evaluatej because the proposed change does not make any ;
physical changes to the plant and the extension of the '
surveillance intervn1 will not introduce any new failure mechaniums. No phy changes to the plant are being made as a roralt o. ; request; therefore, no new accident initiators precursors are being introduced.
The only change being proposed is an extension of an existing survaillance test for the Main Steam SV and RV, The existing evaluation for PBAPS has already considered !
the failure ot a MS RV. The extended operating time does not introduco any new accidents scenarios.
iii)-The proposed changes do not involve a significant reduction _in a margin of safety because the proposed ,
= surveillance frequency is adequate to detect SV/RV failures or aeteriorations. It can be concluded that an increase in the interval to reflect a 24 month operating cycle will have a negligible impact on the margin of safety. The ability to detect a failure or deterioration
~1n the1 performance of SV and RV is essentially unchanged by extending the surveillance frequency; therefore, the
, likelihood that these valves are available to perform their design functions is the same and the margin of safety provided by those valves is essentially unchanged.
Information Supporting _an Environmental Assessment i
AnTenvironmentaliimpact assessment .ts not required for the changes -
l proposedLby this Application because the changes conform to the criteria for " actions eligible for categorical exclusion" as
=specified in 10 CPR 51.22(c)(9). The proposed changes do not .
- involve a significant-hazards consideration as discussed in the preceding-section, The: proposed changes do not involve--a >
significant change in the types or significant increase in the amounts of any effluents that may be released offsite. In addition, the proposed changes do not involve an increase in the individual or cumulative occupational radiation exposure. ,
=
Conclusion ,
The-Plant _ Operations-Review committee and--the Nuclear Review Board have-reviewed.these proposed changes and have concluded that they
- do not involve an unreviewed safety question and are not a threat to the health and safety of the_public.