ML20096F332

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DER 84-27 Re Improperly Handled Instrumentation from Waldinger.Initially Reported on 840510. Investigation & Evaluation in Progress.Final Rept Will Be Provided by 840928
ML20096F332
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/23/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-20217-TDS, ANPP-30317-TDS, DER-84-27, NUDOCS 8409070393
Download: ML20096F332 (2)


Text

r y

Arizona Public Service Company August 23, 1984 ANPP-30317-TDS/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Iane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 84-27 A 50.55(e) Potentially Reportable Deficiency Relating To Improperly Handled Instrumentation From Waldinger.

File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between P. Narbut and T. Bradish on May 10, 1984 (B) ANPP-29648, dated June 4, 1984 (Interim Report)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B).

At that time, it was estimated that a Final Report would be available by August 24, 1984.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by September 28, 1984, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours, p A E. E. Van Brunt, Jr.

3 APS Vice President Nuclear Production

,ANPP Project Director

= Yil, W);933 EEVB/TRB/nj O'ldlju g gy g cc:

See Page Two 3 840823 7..

h0 05000 g ggj;yjg, S

yg 1E-f]

q

.?*

i Mr. T. W. Bishop DER 84 Page Two cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

D. B. Karner

~W. E. Ide D. B. Fasnacht-A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo J. Vorees J. R. Bynum J. M. Allen J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Pattersen R. W. Welcher H. D. Foster D. R. Hawkinson L.~E. Vorderbrueggen R.. P. Zinnerman S. R. Frost J. Self M. Woods T. J. Bloom D. Canady Records Center Institute of "uclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339