Interim Deficiency Rept DER 84-42 Re Replacement of Environmentally Qualified Torque Switches W/Unqualified Switches.Initially Reported on 840618.Final Rept Will Be Submitted by 840913
ML20096F137
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/20/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-30276-TDS, DER-84-42, NUDOCS 8409070299
Download: ML20096F137 (2)


Text

r 4

RECEngo iGC Arizona Public Service Company E /JS 23 fH 1: 38 REGlanv1rh August 20, 1984 ANPP-30276-TDS/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Naria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 84-42 A 50.55(e) Potentially Reportable Deficiency Relating To Environmentally Qualified Torque Switches Were Replaced With Unqualified Switches.

File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between J. Ball and T. Bradish on June 18, 1984 (B) ANPP-29993, dated July 18, 1984 (Interim Report)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Refereace (B).

At that time, it was eatinated that a Final Report would be available by August 20,'1984.

A Final Report has been submitted to APS for review. It is expected that a Final Report will be transmitted to the NRC by September 13, 1984.

There is no new information or change to the Interim Report at this time.

Very truly yours, h

E. E. Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Project Director EEVB/TRB/nj cc: See Page Two 8409070299 840920 PDR ADOCM 05000$28 s

PDR

\\g ZE-X)

.w.

O'

)

I Mr. T. W. Bishop Dat 84-42 Page Two cc:,

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

D. B. Karner-W. E. Ide D. B. Fasnacht A..C. Rogers L. A. Sousa j

D. E. Fowler T. D. Shriver C. N. Russo J. Vorees J. R. Bynum J. M. Allen J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen R. P. Zimmerman

  • S. R. Frost J. Self M. Woods T. J. Bloom Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339 r

f r

d' I

.