Monthly Operating Rept for Apr 1992 for Grand Gulf Unit 1
ML20096E001
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 04/30/1992
From: Cottle W, Daughtery L
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GNRO-92-00055, GNRO-92-55, NUDOCS 9205190013
Download: ML20096E001 (5)


Text

-_

g, J

.{F W ENTERGY I'd!"%f~"*" '"*-

l?,[ ' ^

P~c R s u MS S GO

-'s i e UM 437 608

%,--. _.~.__,.__.

  • y ;d W, T. Cott!e i

, c I ew1 i

L

[ "I N'~,

& y 12,-1992 7

.m.

m j

3.,

!. S "uclear Regulatory Commission

-tation P1-137

=

f "a. D.C.

20:iS5 0*

Document Control Desk Sw_.*

Grand Gulf Nuclear Station Unit 1 Docket No.'$0-416

_P License No. NPF-29 Monthly Operatir.g Xeport I

'NRO-92/00055-Y Gentlemen:.

In accordance with the requirement of Technical Specification 6.9.1.10, Entergy Operations is providing the Montiily Operatir.g Report for Grand Gulf Nuclear Station Unit, for April 1992.

If you have at;j q-nie.1s or require additional-information. please

.corte, this off;r*

Yours truly,-

+

Y, WTC/TMC/cg attachments: 1.

0perating Statur 2.

Average Daily Power-Level

-3.

Unit Shutdowns and Power Reductions 7

cc:

(See.nextpage)

Lj

in i

M00PAPR 9205190013 920430

{l t

mr - FDR ~ ADOCK 05000416-ij)R.

PDR-R

_=

y.

74

-.=

e 4 -

l*

,4' h

-May 12.L1992 GNR0-92/00055 JPage.2 of.

cc:-

Mr. D. C. - Hintz (w/a)

Mr. J. L. Mathis (y/a)

Mr. R. B~ McGehee (w/a)

Mr. H. -' L. Thomas. (w/o/a)

Mr' N.. S. Reynolds (w

)

~

Mr. Stewart 0. - Ebneter (w/a).

. Regional Administrator U.S.. Nuclear Regulatory Commission Region II 101 Harietta St., N.W., Suite 2900-Atlanta, Georgia 30323 Mr.- P. W. 0'Ceanor, Project Manager (w/a)

Office of-Nuclear. Reactor Regulation

U.S. Nuclear Regulatory Commission Nail Stop 13H3 Washington,-D.C.- 20555

.5 w

1, s

4

e-l r

96 M00PAPR t

u Attachment I to GNRO-92/00055 m

3

-ff c

i DOCKET NO.

50-416

~

DATE Of '07/92 COMPLETED BY L. f. Daughtery

'ELEPHONE (601)437-2334

'0PERATING STATUS-1.

Unit:Name: GGNS UNIT 1-Notes:

?

Reporting Phriod:

April 1992 3.;_ Licensed Thermal Power _(MWT): 3833 MWT

~

4. _ Nameplate _'Ratin, (Gross MWE): 1372.5 MWE 5.

Design Electrical Rating (Net MWe): 1250 MWE

6. :: Maximum Dependable Capacity (Gross M'We): 1190 MWE 7.

Maximum Dependable' Capacity (Net MWe 1143 MWE L8.! (if Changes Occur !n Capacity Ratings): Items Number 3 Through 7) Since Last Rep

(

Gia Reasons:

N/A-19.

Power Level.To_Which Restricted, in Any (Net MWe):

N/A

10. Reasons for Restrictions, If Any:

N/A This Month Yr to Date Cumulative

'11.l Hours In' Reporting Period 719 2,903 66,015

12. Number of Hours Reactor Was Critical 409.4~

2,420.4 52,617.5

13.. Reactor Reserve Shutdown Hours 0

0 0

'14.-Hours Generator Ond.ine.

~-~407.0-2,367.0 50,417.4

15. Unit Ruerve-Shutdown' Hours 0

0 0

116.GrossThermal-Energy _ Generated (MWH) 1,426 808 8,716,470 174,439,654 1

17. Gross' Electrical Energy Generated (MWH) 4 8,2T 2,785,643 55,355,753
18CNet. Electrical Energy Generated (MWH) 431,628.

2,671,806 52,932,521 19; Unit Service-Factor 56.F 8f3 79.1

20. Unit _ Availability Factor.

56.6 81.5 79.1-21.UnitCapacityFactor(UsingMDCNet) 52.F 8Ti3 75.3 i

22. Unit' Capacity. Factor (UsingDERHet) 48.0 7U 68.3 i

~ 23.-: Unit Forced Outage Rata 0

8.7-6.6 24~. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Eacli):-

25. IT Shut.0cwn.At End of Report Period.

Estimated Date of Startup:

Jur.e 02, 1992 126. Units In. Test Status (Prior to Commercial' Operation).

' I Forecast Achieved j

INITIAL CRITICALITY 08/18/82 p.

-INITIAL ELECTRICITY 10/20/84 COMMERCIAL OPERATION 07/01/L85 M00PAPR/SCK'FLR 1

_.m e-<'7

- -~-"**-*

E1 4

6;6j

' ' -, -.

  • to GNRO-92/00055 3-

. - y-l y

(:

-DOCKET NO. 416 UNIT:

1 DATE.

65/07/92 COMPLETED BY L. F. Daughtery TELEPHONE ED1-437-2334 p-

-MONTH >

April 1992

DAYl AVERAGE DAILY' POWER LEVEL DAY

-AVERAGE DAILY' POWER LEVEL

_(MWe-Net);

(MWe-Net) l-1182 17 436

.2--

1191 18 0

-3 :

1189 19 0

14 -

!1176 20-0 15 -.

1176-21 0

6 1169 22 0

.7

'1175 23 0

8.

1169 24 0

9 1163 25 0

10 ';

1162

.26 0

l-11,.

1152 27-0 112 11577 28 0

6J

<13-1160 29 0

14:

1031=

30

-0 15 763 31 N/A

/16 582 N/A

h.,

I b

M00PAPR/SCMPFLR

!4

. to GNRO-92/00055;

MIT SHUTDOWNS AND POWER REDUCTIONS

. DOCKET No.

50-415 UNIT NAME 1

Df,TE M/67/92 COMPLETED.BY L. F. Daughtery TELEPHONE 601-437-2334 REPORT MONTH April 1992

-l

. Method of Licensee Cause & Corrective No.

Date.

Type Duration Reason Shutting Down' Event System Component Action To (1)

!!ours (2) l Reactor l Report #

Code Code Prevent Recurrence l

1

-(3)

(4)

(5)

(C&CA) l I

i L

i l

92-

.04/15/92 S

0 H

1 h/A 1

N/A N/A Commenced shutdown for, Refueling l

l l 0utage 5.

i 4

1002 l

l l

192-04/16/92 S

l 0

H I

N/A N/A N/A

' Continue shutdown for RF05 l

l003 l

l l

l 1

I I

l92-04/17/92l S

312 C

1 l

N/A N/A N/A l Refueling Outage 5 l004 l

l l

l l

l UNIT SHUT 00WNS AND FOWER REDUCTIONS 1

2 3

4 F: Forced Reason:

Hethod:

Exhi*oit G - Instructions 5: Scheduled A-Et,uipment Failure 1-Manual for Preparation of Data (Explain) 2-Manual Scram Entry Sheets for Licensee B-Maintenance or Test 3-Automatic Scram Event Report (LER)

C-Refueling 4-Continued File (NUREG-0161)

D-Regulatory Restriction 5-Reduced load E-Operator Training &

6-Other l

Licensing Examination 5

1 F-Administrative Exhibit 1-Same Source G-Operational Error (Explain)

H-Other(Explain)

MOOPAPR/SCMPFLR

_ _ - -