| Site: | Grand Gulf |
| Issue date: | 04/30/1992 |
| From: | Cottle W, Daughtery L ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GNRO-92-00055, GNRO-92-55, NUDOCS 9205190013 | |
| Download: ML20096E001 (5) | |
Text
-_
g, J
.{F W ENTERGY I'd!"%f~"*" '"*-
l?,[ ' ^
P~c R s u MS S GO
-'s i e UM 437 608
%,--. _.~.__,.__.
- y ;d W, T. Cott!e i
, c I ew1 i
L
[ "I N'~,
& y 12,-1992 7
.m.
m j
3.,
!. S "uclear Regulatory Commission
-tation P1-137
- =
f "a. D.C.
20:iS5 0*
Document Control Desk Sw_.*
Grand Gulf Nuclear Station Unit 1 Docket No.'$0-416
_P License No. NPF-29 Monthly Operatir.g Xeport I
'NRO-92/00055-Y Gentlemen:.
In accordance with the requirement of Technical Specification 6.9.1.10, Entergy Operations is providing the Montiily Operatir.g Report for Grand Gulf Nuclear Station Unit, for April 1992.
If you have at;j q-nie.1s or require additional-information. please
.corte, this off;r*
Yours truly,-
+
Y, WTC/TMC/cg attachments: 1.
0perating Statur 2.
Average Daily Power-Level
-3.
Unit Shutdowns and Power Reductions 7
cc:
(See.nextpage)
Lj
- in i
M00PAPR 9205190013 920430
- {l t
mr - FDR ~ ADOCK 05000416-ij)R.
PDR-R
_=
y.
74
-.=
e 4 -
l*
,4' h
-May 12.L1992 GNR0-92/00055 JPage.2 of.
cc:-
Mr. D. C. - Hintz (w/a)
Mr. J. L. Mathis (y/a)
Mr. R. B~ McGehee (w/a)
Mr. H. -' L. Thomas. (w/o/a)
Mr' N.. S. Reynolds (w
)
~
Mr. Stewart 0. - Ebneter (w/a).
. Regional Administrator U.S.. Nuclear Regulatory Commission Region II 101 Harietta St., N.W., Suite 2900-Atlanta, Georgia 30323 Mr.- P. W. 0'Ceanor, Project Manager (w/a)
Office of-Nuclear. Reactor Regulation
- U.S. Nuclear Regulatory Commission Nail Stop 13H3 Washington,-D.C.- 20555
.5 w
1, s
4
- e-l r
96 M00PAPR t
u Attachment I to GNRO-92/00055 m
3
-ff c
i DOCKET NO.
50-416
~
DATE Of '07/92 COMPLETED BY L. f. Daughtery
'ELEPHONE (601)437-2334
'0PERATING STATUS-1.
Unit:Name: GGNS UNIT 1-Notes:
?
Reporting Phriod:
April 1992 3.;_ Licensed Thermal Power _(MWT): 3833 MWT
~
- 4. _ Nameplate _'Ratin, (Gross MWE): 1372.5 MWE 5.
Design Electrical Rating (Net MWe): 1250 MWE
- 6. :: Maximum Dependable Capacity (Gross M'We): 1190 MWE 7.
Maximum Dependable' Capacity (Net MWe 1143 MWE L8.! (if Changes Occur !n Capacity Ratings): Items Number 3 Through 7) Since Last Rep
(
Gia Reasons:
N/A-19.
Power Level.To_Which Restricted, in Any (Net MWe):
N/A
- 10. Reasons for Restrictions, If Any:
N/A This Month Yr to Date Cumulative
'11.l Hours In' Reporting Period 719 2,903 66,015
- 12. Number of Hours Reactor Was Critical 409.4~
2,420.4 52,617.5
- 13.. Reactor Reserve Shutdown Hours 0
0 0
'14.-Hours Generator Ond.ine.
~-~407.0-2,367.0 50,417.4
- 15. Unit Ruerve-Shutdown' Hours 0
0 0
116.GrossThermal-Energy _ Generated (MWH) 1,426 808 8,716,470 174,439,654 1
- 17. Gross' Electrical Energy Generated (MWH) 4 8,2T 2,785,643 55,355,753
- 18CNet. Electrical Energy Generated (MWH) 431,628.
2,671,806 52,932,521 19; Unit Service-Factor 56.F 8f3 79.1
- 20. Unit _ Availability Factor.
56.6 81.5 79.1-21.UnitCapacityFactor(UsingMDCNet) 52.F 8Ti3 75.3 i
- 22. Unit' Capacity. Factor (UsingDERHet) 48.0 7U 68.3 i
~ 23.-: Unit Forced Outage Rata 0
8.7-6.6 24~. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Eacli):-
- 25. IT Shut.0cwn.At End of Report Period.
Estimated Date of Startup:
Jur.e 02, 1992 126. Units In. Test Status (Prior to Commercial' Operation).
' I Forecast Achieved j
INITIAL CRITICALITY 08/18/82 p.
-INITIAL ELECTRICITY 10/20/84 COMMERCIAL OPERATION 07/01/L85 M00PAPR/SCK'FLR 1
_.m e-<'7
- -~-"**-*
E1 4
6;6j
' ' -, -.
- to GNRO-92/00055 3-
. - y-l y
(:
-DOCKET NO. 416 UNIT:
1 DATE.
65/07/92 COMPLETED BY L. F. Daughtery TELEPHONE ED1-437-2334 p-
-MONTH >
April 1992
- DAYl AVERAGE DAILY' POWER LEVEL DAY
-AVERAGE DAILY' POWER LEVEL
_(MWe-Net);
(MWe-Net) l-1182 17 436
.2--
1191 18 0
-3 :
1189 19 0
14 -
!1176 20-0 15 -.
1176-21 0
6 1169 22 0
.7
'1175 23 0
- 8.
1169 24 0
9 1163 25 0
10 ';
1162
.26 0
l-11,.
1152 27-0 112 11577 28 0
6J
<13-1160 29 0
14:
1031=
30
-0 15 763 31 N/A
/16 582 N/A
- h.,
I b
M00PAPR/SCMPFLR
!4
. to GNRO-92/00055;
- MIT SHUTDOWNS AND POWER REDUCTIONS
. DOCKET No.
50-415 UNIT NAME 1
Df,TE M/67/92 COMPLETED.BY L. F. Daughtery TELEPHONE 601-437-2334 REPORT MONTH April 1992
-l
. Method of Licensee Cause & Corrective No.
Date.
Type Duration Reason Shutting Down' Event System Component Action To (1)
!!ours (2) l Reactor l Report #
Code Code Prevent Recurrence l
1
-(3)
(4)
(5)
(C&CA) l I
i L
i l
92-
.04/15/92 S
0 H
1 h/A 1
N/A N/A Commenced shutdown for, Refueling l
l l 0utage 5.
i 4
1002 l
l l
192-04/16/92 S
l 0
H I
N/A N/A N/A
' Continue shutdown for RF05 l
l003 l
l l
l 1
I I
l92-04/17/92l S
312 C
1 l
N/A N/A N/A l Refueling Outage 5 l004 l
l l
l l
l UNIT SHUT 00WNS AND FOWER REDUCTIONS 1
2 3
4 F: Forced Reason:
Hethod:
Exhi*oit G - Instructions 5: Scheduled A-Et,uipment Failure 1-Manual for Preparation of Data (Explain) 2-Manual Scram Entry Sheets for Licensee B-Maintenance or Test 3-Automatic Scram Event Report (LER)
C-Refueling 4-Continued File (NUREG-0161)
D-Regulatory Restriction 5-Reduced load E-Operator Training &
6-Other l
Licensing Examination 5
1 F-Administrative Exhibit 1-Same Source G-Operational Error (Explain)
H-Other(Explain)
MOOPAPR/SCMPFLR
_ _ - -