Forwards Rev to Page 1 & 2 of Encl 3 of .Item 8 of Encl Identified Unit 2 Cycle 6 for Installation of Central Fire Alarm Panel in Unit 3 Cr.Util Intends to Perform Work During Unit 3 Cycle 5B Outage
ML20096D721
Person / Time
Site: Browns Ferry  
Issue date: 05/13/1992
From: Zeringue O
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9205180210
Download: ML20096D721 (4)


Text

_

IA

- -.._- -- -. P 9 Once Bw m Ow e A, bm w M Weswe hey Aum7'y O J '!ke Zenngue W:s P*cs&nt 31c niriVeo, Cyrran: a MM 131992 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.

20555 Gentlemen:

In the Matter of J

Docket Nos. 50-259 hwessee Valley Authority

)

50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - FIRE PROTECTION REPORT (FPR)

Reference:

TVA letter dated January 15, 1992 This letter is being issued to provide NRC with a revision to page 1 and 2 of Enclos'are 3 of the letter issued on January 15, 1992.

In the January 15, 1992 letter, TVA submitted the revised BFN FPR. t' the letter provided a list of fire protection projects that 17A is committed to perform the Unit / Cycle outage for scheduled implementation. A recent review of the Enclosure has identified a typographical error.

Item P.

cf the Enclosure, identified Unit 2 Cycle 6 for installation of a central fire alarm panel in Unit 3 control room when TVA's intention was to perform this work during Unit 3 Cycle 5B outage.

Consequently, TVA is providing revised pages for the Enclosure.

Please remove pages 1 and 2 of the Enclosure and insert the pages provided.

If you have any questions, please contact Raul R. Baron at (205) 725-7570.

^l

~ 8 0 0 c,! ~o s/

?

'2at

)/

)M O. J. Zeringue Enclosure I

cc: See pa.ge 2 I

9205180210 920513 PDR ADOCK 05000259 F

ppy

  • 2 y

U.S. Nuclear Regulatory. Commission PUti 13L1992' Enclosure cc (Enclosure):

NRC-Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens,_ Alabama -35611 Mr. Thierry M. Ross, Project Maneger U.S. Nuclear' Regulatory Commik'ior.

One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr. B. A. Wilson, Prof)ct Chief U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 i

l'

\\

2 :

4

+

ENCLOSURE 3 Fire Protection Upgrade Program The April 4,1988 Fire Protection Report submittal had a supplement which corte.ined a Fire Protection Upgrade List. This Fire Protection Upgrade list contained 52 projects. The scope of this list included the entire Browns Ferry Nuclear Plar.t site and was to provide complete and integrated fire protection system for the plant considering NRC and NFPA guidelines and insurance company and utility industry standard practices.

The list below shows cl1 projects that TVA is committing to the NRC with the unit / cycle outage scheduled implementation. Those projects not included in the list have been evaluated by TVA and determined to be seceptable in their existing configuration to satisfy safe shutdown requirements. The deleted projects previously submitted as "tc be determined" stated that these projects will be evaluated for inclusion in the BFN integrated schedule. TVA will continue to pursue this course of action and each fire protection project will be evaluated on a case by case basis per the Masters Issues List. An economic evaluation will be performed and then these projects will be ranked with all other potential projects by the BFN Change Control Board. TVA will then work cl1 projects in ranked order that can be financed by the available annual budget.

The following projects are committed to by TVA with specified outages for implementation.

1.

Unit 3 Reacter Building - Automatic Sprink'er Upgrade -

Unit 3 Cycle SB 2.

~ Unit 2 Reactor Building - Automatic Sprinkler Upgrade -

Unit 2 Cycle 6 3.

Unit 1 Reactor Building - Automatic Sprinkler Upgrade -

Unit 1 Cycle 6 4

Install Central Fire Alarm Panel in Units 1 and 2 Control Rcom -

Unit 2 Cycle 6 5.

Unit 3 Reactor Building - Upgrade fire Detection / Alarm -

Unit 3 Cycle 5B 6.

Unit'l Reactor Building - Upgrade Fire Detection / Alarm -

Unit 1 Cycle 6 7.

Unit 2 Reactor Building - Upgradt Fire Detection / Alarm -

Unit 2 Cycle 6

)

~

1

p..

4 Page 2 i

j..

/*

8.

Instell Central Fire Alarm Panel in Unit 3 Control Room -

Unit 3 Cycle 5B 9i Upgrade Unit 3 Control Room Fire Detection - Unit 3 Cycle 5B

- 1C.

Unit-3 Diesel Generator Building - Fire Detection / Alarm Upgrade -

Unit 3 Cycle 5B

-11.

Units 1 and 2 Diesel Cenerator Building - Pire Detection /Alann Upgrade - Unit 2 Cycle 6 12.. Control Building - Upgrade Fire Detection / Alarm and Suppression -

Unit 2 Cycle 6 13.

Upgrade Units 1 and 2 Control Room F. ire Detection -

Unit 2 Cycle 6 14.

Cable Spreading Room A - Fire Detection / Alarm Upgrade -

Unit 2 Cycle 6

. ' 15. Cable Spreading Room B - Fire Detection / Alarm Upgrade -

Unit 3 Cycle SD

~16.

Intake Pump Station - Upgrade Fire Dete ' ion / Alarm System -

Unit 2 Cycle 6 l;

17.

Cable Spreading Room A - Suppression System Upgrade -

Unit 2 Cycle 6 18.

Cable Spreading Room 8 - Suppression System Upgrade -

Unit 3 Cycle SB t

l ll I

i

~

...