. _ . _ . . __ _ _ _ _ _ - - ,

f ,

,AJ Beaver Vallsy Powsr Stition Shi p n rt PA 150774X)04 (412) 643-8009 FAX GEORGE S. THOMAS Dm o V ce President January 8, 1996 Nuclear Power Division U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. DPR-66 Updated Inservice Testing Program, Issue 2, Revision 13 The purpose of this submittal is to provide the Nuclear Regulatory Commission (NRC) with an informational copy of revisions to the Beaver Valley Power Station Unit 1 (BVPS-1) Inservice Testing (IST) Program.

Enclosure 1 provides a summary of the IST program changes which have been incorporated into Issue 2, Revision 13.

Enclosure 2 is Issue 2, Revision 13 of the BVPS-1 IST Program. It has been determined that the Revision 13 IST program changes do not require NRC approval prior to implementation. This determination was made because all of the changes are either:

. editorial in nature, or e in compliance with the 1983 Edition through Summer 1983 Addenda of the ASME Boiler and Pressure Vessel Code,Section XI, or e in compliance with the positions delineated in Attachment 1 or Supplement 1 of Generic Letter No. 89-04, " Guidance on Developing Acceptable Inservice Testing Programs."

19dC6 9601190086 960108 PDR P

ADOCK 05000334 PDR hid.

I llI

t-t.

~ '

Beaver Valley Power Station, Unit No.1 Updated Inservice Testing Program, Issue 2, Revision 13 Page 2 i

If you have any questions regarding this submittal, please contact Mr. Roy K.

Brosi, Manager, Nuclear Safety Department at (412) 393-5210.

Sincerely, George S. Thomas c: Mr. L. W. Rossbach, Sr. Resident inspector Mr. T. T. Martin, NRC Region I Administrator Mr. D. S. Brinkman, Sr. Project Manager

i j

l ENCLOSURE 1 BEAVER VALLEY UNIT 1 IST PROGRAM

SUMMARY

OF CHANGES Issue 2, Revision 13

I i

ENPrmstE 1 4

i i SGGERY OF QiANGES 'IO 'IHE WIT 1 IST PROGRAM (REV.13) i I) 'Ihe following changes made to the thit 1 Isr Program are in armrdaroe with the ASME XI Code, Generic Intter 89-04 and Supplement 1 (NUREG-1482) :

A) Added CSI 34 for [1m -152, 153, 154], the Charging Punp Mini-Flow Check Valves. 'Ihese valves can only be full-stroke tested by using a non-intrusive technique and therefore will only be tested during cold Shutdowns. (pages 169 and 170) Also revised the " Valve Testing Outlines" Section to call the quarterly test a partial stroke and to add reference to CSI 34. (page 87)

B) Added CSI 35 fx [1PW-50, 51, 52, 68, 69, 70], the APW Pump Inbe Oil cooler Line Check Valves. 'Ihese valves can only be full-stroke tested by using a nonintrusive tedinique and therefore will only be tested during Cold Shutdowns. (pages 171 and 172) Also revised the " Valve Testing Outlines" Section to call the quarterly test a partial stroke and to add reference to CSI 35. (page 124)

C) O)anged the valve caragnry to "A" instead of "A/P" fx [M3V-1CH-142],

the Residual Heat Renoval Imtdown to the Chemical and Volume Control System, and aMad a struke and time test during Cold Shutdowns. 'Ihis was done because this ocntalment isolation valve may be open during Mode 4 and may have to be closed. (page 86) Also aMad CSI 36 with the basis for stroking at the CSD frequency. (page 173) j D) Added a stroke and time test in the closed direction for [SOV-1RC-102A, l 102B, 103A, 103B, 104, 105], the Reactor Vessel Head Vent Valves, in i order to be consistent with Unit 2. (page 83) Also revised CSI 1 to reference the closed stroke test. (page 149)

E) Deleted [TV-11M-100A1, A2], because they were removed from the plant.

(page 104) Added [1CV-57, 58, 59, 60], the sealed shut manual valves that are the new containment isolation valves. (page 103) Also revised RR1 to reflect these charges. (page 176)

II) 'Ihe following changes made to the Unit 1 IST Program are editorial:

A) Revised the "NSA" to Shut for sanple valves [TV-1SS-102A1, 102A2, 105A1, 105A2]. (pages 106 and 107)

B) Revised the reverse direction test number refmascisd for (1RW-95, 96, 97] to 10ST-30.2, 3, 6. (page 129)

C) Revised the stroke and time test number refmasil for ['IV-1VS-101C, 101D, 101E] to 1/20ST-44A.11. (page 141)

ENC [DSURE 1 SW99M OF GANGES TO ' DIE WIT 1 ISP PROGRAM (REV.13)

D) Deleted "not to exceed every 2 years" frun the sentence rbweribing Appendix J leak testing. 10CFR50 Appendix J already ocntains the frequency requirunents. In addition, the revision of Appendix J may not require testing every 2 years. (page 77)

E) Deleted the following valves fran the IST Pr@ har==a they are not in the IST Scope per 1W-1100 or are excluded per IWV-1200:

[lOV-12-370, 373] -

these valves are de e.- vized open and no longer perform a function in shutting down a reactor or in mitigatirq the consequences of an accident. (page 89)

[1DA-104, 134] -

these manual valves are for maintenance only. (page 138)

F) Deleted the tenperature and Mode requirements specified in the Alternate Test of CSI 24 for (TV-MS-101A,101B,101C], the Main Steam Isolation Valves. Tech. Spec Amendment No.162 deleted mention of the specific conditions for testing. (page 162)

G) AMari OP Curves to the "Puup Minhamn Operating Point (POP) Curves" section of the IST Pig for the following pungs:

[1m-P-1A,1B,1C) - Charging /lfiSI Pungs (page 40)

[1m-P-2A,2B] - Boric Acid Transfer Pumps (pages 41 and 42)

[1RH-P-1A,1B] - Residual Heat Renoval Pungs (pages 43 and 44)

[1SI-P-1A,1B] - Low Head Safety Injection Punps (page 45)

[1QS-P-1A,1B] - Quench Spray Pumps (pages 46 and 47)

[1RS-P-1A,1B] - Inside Recirculation Spray Pungs (pages 48 and 49)

[1RS-P-2A, 2B] - Outside Reciru11ation Spray Pungs (pages 50 and 51)

[1WR-P-1A, 1B, IC] - Reactor Plant River Water Punps (pages 58 - 60)

Also deleted the Note p+ Wing the POP Curves Section and ariekd pages saying "In Developnent" for (1CC-P-1A,1B,1C). (pages 52 - 54)

H) Added reference to Supplement 1 of Generic Ietter 89-04, NUREU-1482, to the Pung and Valve Tbstirg RequireisixAm Sections. (pages 2 and 75)

I) Added the words "(accuracy and range)" to define accurate in the Puup Testing Requirements Section under the punp curve riie== ion. (page 4)

J) Mriati the word " centrifugal" to the parq$a describing POP Curves -

Curves are not included for positive displacement punps. (page 5) 1