ML20096C738
| ML20096C738 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 08/16/1984 |
| From: | Hall D ILLINOIS POWER CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20096C725 | List: |
| References | |
| 0981-L, 981-L, U-10188, NUDOCS 8409050387 | |
| Download: ML20096C738 (2) | |
Text
,
s f_
'lLLIN0/8 POWER COMPANY g
CLINTON POWER STATION, P.O. 80X 678. CLINTON, ILLINOIS 61727 August 16, 1984 Docket No. 50-461 Mr. James G. Keppler Regional Administrator Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137
Subject:
Clinton Power Station Plant Staffing
Dear Mr. Kcppler:
Illinois Power Company has received your Insaection Report 50-461/84-11 dated July 3, 1984.
Our review of this report identified inconsistencies in the staffing data presented on page 9.
To ensure correct information is available, the plant staffing status at the time of your inspection is provided.
% of Authorized Positions Filled Radiation Protection 66%
Chemistry 84%
Maintenance 87%
Technical 73%
Compliance and Configuration 92%
Radwaste 83%
Operations 98%
The IP Startup Group consisted of the following personnel:
IPC Startup Employees 73 Contractors (As of June 1,1984)
Test Engineers 52 C&I Technicians 37 Technical Specialists 19 Schedulers 11 Total Employees 192 ONk$s i
MA PM
\\
L
, en ?>rb
~
Mr. James G. Keppler Page 2 August 16, 1984 If you have any questions regarding this matter, please contact Illinoin Power Company.
Sincerely yours,
D. P. Hall Vice President JRS/ lag (R*iC) cc:
Director, Office of I&E, US NRC, Washington, DC 20555 NRC Resident Office Illinois Department of Nuclear Safety l
l l
l' L..__