ML20096C738

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Insp Rept 50-461/84-11. Staffing Status at Time of Insp Provided to Eliminate Inconsistencies
ML20096C738
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/16/1984
From: Hall D
ILLINOIS POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20096C725 List:
References
0981-L, 981-L, U-10188, NUDOCS 8409050387
Download: ML20096C738 (2)


Text

, - _ _ _ _ _ _ _ _ _ _ _ _ _

s

'lLLIN0/8 POWER COMPANY f_ g CLINTON POWER STATION, P.O. 80X 678. CLINTON, ILLINOIS 61727 August 16, 1984 Docket No. 50-461 Mr. James G. Keppler Regional Administrator Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Subject:

Clinton Power Station Plant Staffing

Dear Mr. Kcppler:

Illinois Power Company has received your Insaection Report 50-461/84-11 dated July 3, 1984. Our review of this report identified inconsistencies in the staffing data presented on page

9. To ensure correct information is available, the plant staffing status at the time of your inspection is provided.

% of Authorized Positions Filled Radiation Protection 66%

Chemistry 84%

Maintenance 87%

Technical 73%

Compliance and Configuration 92%

Radwaste 83%

Operations 98%

The IP Startup Group consisted of the following personnel:

IPC Startup Employees 73 Contractors (As of June 1,1984)

Test Engineers 52 C&I Technicians 37 Technical Specialists 19 Schedulers 11 Total Employees 192 i MA ONk$s

  • PM L , en ?>rb

\

~

, Mr. James G. Keppler Page 2 August 16, 1984 If you have any questions regarding this matter, please contact Illinoin Power Company.

Sincerely yours ,

D. P. Hall Vice President JRS/ lag (R*iC) ,

cc: Director, Office of I&E, US NRC, Washington, DC 20555 NRC Resident Office Illinois Department of Nuclear Safety l

l l'

L..__