ML20096C397

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DER 84-20 Re Displacement of Connecting Line in Safety Injection Sys.Initially Reported on 840422.Final Rept Will Be Delayed from 840822 to 0912 Due to Extensive Investigation & Evaluation Required
ML20096C397
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/20/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-30277-TDS, DER-84-20, NUDOCS 8409050262
Download: ML20096C397 (2)


Text

-

f.MEIVeu xm Arizona Public Service Company S 1% 24 Pn I: g g August 20, b k

'I ANPP-30277-TDS/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 84-20 A 50.55(e) Potentially Reportable Deficiency Relating To Displacement Of A Connecting Line In The SI System.

File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between T. Young and J. Cook on April 22, 1984 (B) ANPP-29531, dated May 17, 1984 (Interim Report)

(C) ANPP-29973, dated July 16, 1984 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B), and a Time Extension was requested by Reference (C). At that time, it was estimated that a Final Report would be available by August 22, 1984.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by September 12, 1984, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours, E. E. Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Project Director EEVB/TRB/nj cc: See Page Two 8409050262 4

20 PDR ADOCK 0 520 S

PDR l,. l: ~.)

-. -- - ']. -

Mr. T. W. Bishop DER 84-20 Page Two cc Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers s

L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo J. Vorees J. R. Bynus J. M. Allen J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen R. P. Zimmerman S. R. Frost J. Self M. Woods T. J. Bloom Records Center i

Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339 l

O