Text
%
I F p"wr ha g
Southem Califomia Edisori Company P. O. BOX 128 SAN CLEMENTE CAllFORNIA92674 0128 EP E S DE (714) 60 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.
20555 Gentlemen:
Subject:
Docket Nos. 50-361 and 50-362 Amendment Application Nos. 155 and 139 Deletion of License Conditions 2.C(26) and 2.C(27)
Integrated Implementation Schedule Program San Onofre Nuclear Generating Station Units 2 and 3 Enclosed are Amendment Application Numbers 155 and 139 to Facility Operating Licenses NPF-10 and NPF-15 for San Onofre Nuclear Generating Station (SONGS)
Units 2 and 3, respectively. These amendment applications consist of Proposed Technical Specification Change Number NPF-10/15-455 (PCN-455).
PCN-455 is provided as Enclosure 1 to this letter.
The proposed change is to delete License Conditions 2.C(26) and 2.C(27) for SONGS 2 and 3, respectively. These license conditions require that Southern California Edison (Edison) implement and maintain a plan for scheduling all capital modifications based on an NRC approved Integrated Implementation Schedule (IIS) Program Plan.
This amendment request is expected to result in a total present worth savings in excess of $100,000 for the two units over the lifetime of the plant.
Because of this savings, this submittal is being submitted as a Cost Beneficial Licensing Action (CBLA).
PCN-299 implements the Technical Specification Improvement Program which incorporates the recommendations of NUREG-1432, " Standard Technical Specifications, Combustion Engineering Plants."
PCN-299 was submitted to the NRC for review on December 30, 1993. This proposed change does not affect that submittal.
160007 9601160430 960104 O
PDR ADOCK 05000361 P
pgg
/lg
-. _ _ _ _. ~. _. _ _ _ _ _. _ _.. _ _
9 Qt
-v, l"E?
?
Document Control Desk Edison requests this amendment be issued effective as of its date of issuance, to be implemented within 30 days from the date of issuance.
This will provide adequate time for the necessary procedure changes and training on the new Technical Specifications.
If you would like additional information on this Technical Specification j
change request, please let me know.
j I
Sincerely,
\\
i Enclosures cc:
L. J. Callan, Regional Administrator, NRC Region IV J. E. Dyer, Director, Division of Reactor Projects, NRC Region IV K. E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV J. A. Sloan, NRC Senior Resident Inspector, San Onofre Units 2 and 3 j
M. B. Fields, NRC Project Manager, San Onofre Units 2 and 3 H. Kocol, California Department of Health Services 1
.