Requests Exemption from 10CFR55.35(a) Re SRO License Exam Requirements.Applicant Had Taken Exam & Passed Operating Test But Failed Written Portion.Seeks re-administration of Written Portion of Test Only
ML20096A266
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 11/08/1995
From: Campbell W
CAROLINA POWER & LIGHT CO.
To: Aiello R, Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 9601040352
Download: ML20096A266 (2)


Text

.

341 02 '96 12*57PM Btf tED tTHEER P.2 m o m

a

./

O l

~ '

CP&L m ummmmmmum l

c.eans p er a u he c,any wenn n.c ph.s s

i roson1o429 m poid.ni Bodport NC 28461 0429 Sevnewick Nuclear Plant NOV 0 81995 j

SERIAL: BSEP 95-0592 i

Mr. Stewart D. Ebneter i

Me91onal Administrator ATTENTION: Mr. R. F. AeNic l

U. 5. Nuclear Regulatory Commission 101 Marietta Street, N. W., Suite 2900 Atlanta, GA 30323 l

BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 AND 50 324/ LICENSE NOS. DPR 71 AND DPR 62 EXEMPTION REQUEST FROM THE REQUIREMENTS OF 10 CPR 55.35(a)

Dear Mr. Ebneten Carolina Power & Light Company (CP&L) hereby requests the NRC to:

1.

Pursuant to 10 CFR 55.11, approve an exemption from the requirements of 10 CFR l

55.35(a) for an applicant.

l 2.

Pursuant to 10 CFR 55.35(b), excuse the applicant from re examination on the l

operating test which he has successfully completed.

The applicant was administered a Senior Reactor Operator (SRO) license examination during i

the week of October 23,1995 and successfully passed the operating test. However, the j

opplicent failed to pass the written portion of the examination.10 CPR 55.35(a) states that en opplicant whose application for a licensa has been denied because of failure to pass the j

written examination or the operating test, or both, may file a new application two months after the date of the denial. CP&L is requesting this exemption for the applicant to allow him to file a new license application, NRC Form 398, prior to the end of the specified two 1

months after the date of denist.

Also, CP&L is requesting that the applicant be re administered the written examination t

during the week of December 18,1995, which is a previously scheduled examination

. period.

g 4

0 9601040352 951108 PDR ADOCK 05000324 V

PDR

b. hU[

b 0/}lly f

JAN 02 '96~ 12857PM BrP tED MANAGER P.3

.n, m

j Document Contml Desk 88EP 96 0892 / Pa9e 2 l-i.

.The basis for this exemption is as follows:

1..

The applicant has entered a remediation. process.

I 2.

No signifloant performance issues were identified in the NRC Upgrade Ucanse j

Operating Examination adminiatored on October 23 24,1995.

i i

I 3.

The applicant satisfactorily completed CP&L's written and operating examinations

. administered in accordance with our Upgrade Ucense Program.

i 4.

The applicant haa successfully completed CP&L's requirements to be licensed as a 1

Senior Reactor Operator, and has also sucessafully performed a minimum of five j

significant control manipulations which affected reactivity or power level.

l Operations and Training management at the Brunswick Plant have reviewed the appiloont's performance to date in the Upgrade Ucensing Program and believe that, with the prescribed i

remediation, the applicant will be ready for re-examination of the written Senior Reactor l

Operstar licenas examination in December 1g95.

I Attached are the new license application, NRC Form 398, for complying with 10 CFR 55.31 l

and 55.35, and a new certification of medical condition, NRC Form 396, for complying with j

10 CFR 55.21,55.23,55.27, and 55.33(a)(1).

l Purausnt to 10 CFR 2.790(a)(6), the attached information should be withheld from public disclosure.

Please refer any questions regarding this submittal to Mr. Hal Wall at (910) 457-2213.

j sincerely, William R. Campbell SHC/she 4

Attechments 00:

Mr. C. A. Patterson, NRC Senior Resident inspector - Brunswlok Unita 1 and 2 Mr. T. A. Peebles, NRC Region 11 - Operations Branch 3

~

Mr. D. C. Trimble, Jr., NRR Project Manager Brunswick Units 1 and 2 The Honorable H. Wells. Chairman North Carolina Utilities Commission NRC Document Control Desk 2