341 02 '96 12*57PM Btf tED tTHEER P.2 m o m
a
./
O l
~ '
CP&L m ummmmmmum l
c.eans p er a u he c,any wenn n.c ph.s s
i roson1o429 m poid.ni Bodport NC 28461 0429 Sevnewick Nuclear Plant NOV 0 81995 j
SERIAL: BSEP 95-0592 i
Mr. Stewart D. Ebneter i
Me91onal Administrator ATTENTION: Mr. R. F. AeNic l
U. 5. Nuclear Regulatory Commission 101 Marietta Street, N. W., Suite 2900 Atlanta, GA 30323 l
BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 AND 50 324/ LICENSE NOS. DPR 71 AND DPR 62 EXEMPTION REQUEST FROM THE REQUIREMENTS OF 10 CPR 55.35(a)
Dear Mr. Ebneten Carolina Power & Light Company (CP&L) hereby requests the NRC to:
1.
Pursuant to 10 CFR 55.11, approve an exemption from the requirements of 10 CFR l
55.35(a) for an applicant.
l 2.
Pursuant to 10 CFR 55.35(b), excuse the applicant from re examination on the l
operating test which he has successfully completed.
The applicant was administered a Senior Reactor Operator (SRO) license examination during i
the week of October 23,1995 and successfully passed the operating test. However, the j
opplicent failed to pass the written portion of the examination.10 CPR 55.35(a) states that en opplicant whose application for a licensa has been denied because of failure to pass the j
written examination or the operating test, or both, may file a new application two months after the date of the denial. CP&L is requesting this exemption for the applicant to allow him to file a new license application, NRC Form 398, prior to the end of the specified two 1
months after the date of denist.
Also, CP&L is requesting that the applicant be re administered the written examination t
during the week of December 18,1995, which is a previously scheduled examination
. period.
g 4
0 9601040352 951108 PDR ADOCK 05000324 V
- b. hU[
b 0/}lly f
JAN 02 '96~ 12857PM BrP tED MANAGER P.3
.n, m
j Document Contml Desk 88EP 96 0892 / Pa9e 2 l-i.
.The basis for this exemption is as follows:
1..
The applicant has entered a remediation. process.
I 2.
No signifloant performance issues were identified in the NRC Upgrade Ucanse j
Operating Examination adminiatored on October 23 24,1995.
i i
I 3.
The applicant satisfactorily completed CP&L's written and operating examinations
. administered in accordance with our Upgrade Ucense Program.
i 4.
The applicant haa successfully completed CP&L's requirements to be licensed as a 1
Senior Reactor Operator, and has also sucessafully performed a minimum of five j
significant control manipulations which affected reactivity or power level.
l Operations and Training management at the Brunswick Plant have reviewed the appiloont's performance to date in the Upgrade Ucensing Program and believe that, with the prescribed i
remediation, the applicant will be ready for re-examination of the written Senior Reactor l
Operstar licenas examination in December 1g95.
I Attached are the new license application, NRC Form 398, for complying with 10 CFR 55.31 l
and 55.35, and a new certification of medical condition, NRC Form 396, for complying with j
10 CFR 55.21,55.23,55.27, and 55.33(a)(1).
l Purausnt to 10 CFR 2.790(a)(6), the attached information should be withheld from public disclosure.
Please refer any questions regarding this submittal to Mr. Hal Wall at (910) 457-2213.
j sincerely, William R. Campbell SHC/she 4
Attechments 00:
Mr. C. A. Patterson, NRC Senior Resident inspector - Brunswlok Unita 1 and 2 Mr. T. A. Peebles, NRC Region 11 - Operations Branch 3
~
Mr. D. C. Trimble, Jr., NRR Project Manager Brunswick Units 1 and 2 The Honorable H. Wells. Chairman North Carolina Utilities Commission NRC Document Control Desk 2
I i
.