Forwards Independent Design Review of Limerick Generating Station 1 Core Spray Sys,Bi-Monthly Status Rept 5 for Period Ending 840731. Related Correspondence
ML20096A216
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 08/01/1984
From: Carpenter F
TORREY PINES TECHNOLOGY
To: Boyer V
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
OL, NUDOCS 8408310023
Download: ML20096A216 (7)


Text

,-.

r...

TOllREY PINES TECHNOLOGY l(~[] ~

gLATi'D C

.,g gp,giNGi.

f PO Boe 8%00

,.J P...

San Dairju. caktornia 02130

  1. ~*

]***w T&phy /r (019) 4W2054

~

0 A tu,on et G A lechliologies Inc.

TFT:029:FDC:84 August 1,1984

.g ASO 13 gj -

ern

' ~ ' Td 'C@?' r -

. ; L' Philadelphia Electric Cmipany

.?

2301 Market Strcot S25-1 Philadelphia, PA 19101 V. S. Boyer, Sr. Vice President Nuclear Power Attention:

[3sb~ M.h s

OL Gentlanen:

The onclomd st.atua report is the fifth of six scheduled for the Independcht the Limerick Generating Station Unit 1 Core Spray Sy stua.

Design Rcvicw of covers the period July 16, 1984 to July 31, 1984.

A manpower actual effort to This report activit,y sanmary graph illustrates the planned projected vs.

meet the 31NP toilestonen in the Progrrm Plnn.

A co;ry of this report in tcing sent directly to the representative of the U.S.

!!uclear Regttlatory Ca;urdsnion.

Please call c:e if you have any quections regarding the cont,cnts of this report.

Sincerely, c-

+

1

.F. D. Carpcn'.,cr ITC/da Project Manager Encl.

cc: PECo:

R. A. Mulford N2-l E. C. Kistner J. Moskiwitz L. B. Pyrih G. J. Beck cc:

Limerick Service List, Bechtcl: S. J. Ployhar J. M. Milboan, Chief Licensing Section USNHC:

Quality Assurance Branch, Office of Inspect, ion & Enforcement U.S. Nuclear Regulatory Commission EWS-305A Washington, DC 20555 B408310023 840001 PDR ADOCK 05000352 R

PDR 1

cc: Judge Lawrence Brenner (w/ enclosure)

~

Judge. Peter A. Morris (w/ enclosure)

Judge Richard F. Cole (w/ enclosure)

Troy it.. Cunner, J r., Esq.

(w/ enclosure)

Ann P. Iludgdon, Esq.

(w/ enclosure) lir. Vtank R. Roliano (w/enclocure)

Mr.' Robert L. Anthony (w/ enclosure)

Naureen Mu1119dt:

(w/ enclosure)

~

Charles W. Elliott, Eug.

(w/ enclosure)

Zori G. Ferkin, Esq.

(w/ enclosure)

Mr. Tholins Gerusky (w/ enclosure)

Director, Penna. Einergency (w/ enclosure)

Management Agency Angus Inve, Esq.

(w/ enclosure)

David Wersan, Esq.

(w/ enclosure)

Robett J. Sugarlian, Esq.

(w/ enclosure)

S (w/ enclosure)

MacLian W. Suuh, Esq.

Spence W. Perry, Esq.

(w/ enclosure)

Joy M. Gutierrez, Esq.

(w/ enclosure)

Atomic Safety & Licensing Appeal Board (w/ enclosure)

Atomic Safety & Licensing Board Panel (w/ enclosure)

DucKet & Service Section (w/ enclosure - 3 copies))

Jaision Wiggins (w/ enclosure)

Titluttiy H. S. Campbell (w/ enclosure) d

INDEPENDENT DESIGN REVI&l 0F LIIERICK GENERATING-STATION ll.

CORE SPRAY SYSTEM

- Bi-Monthly St,atus Report #5 Period Ending Jtdy 31, 1984 lntr_Qduction'

'lhis is the fifth of six planned bi-monthly status' reports.

1his report docu--

+

monts information concerning the independent design revicw of Limerick's Core Spray System.

  • lhe work performed covers the period Jtdy 16, 1984 to Jtdy 31, 1984.

Suum 1Ey.

1he design procedure' review ubich descrites the Ecchtel and GE design process and PEco's design revicw function for conformance to the PSAR or to 10CFR Part 50, Appendix B is complete.

No PFRs were issued on Task A.

al) des 3 nn procedure implcmentation' revicw checklists are canp] etc.

For Tart H, Design docuncnts generated by 13echtel, CE, and PEco's design. revicw doconents are being evaluated for conformance to the established design process.

Task C is progressind ns }danrcd wiut a clie)1t agreed to perturtation rcqherted it/ the 11h0 during their rcvicw of TPf's IDVP efforts.

With Taska A, B, C and D nealing canpletion, or completed, the proErtm ujll be focusing on resolution of the potential findings.

This process is in various stages for the fiftcen PFRs gonarated as of this date, Three representatives of the' NRC's 1&E function visited TFf's facilitics on Jtdy 24 and 25 to revim the Limerick 1DVP progress.

Their revim concentrated on the potential finding reports generated and the Task C technical ~ revici.

IAM A DMi1QttyjlRfJMldtE_Jfyll11 All work on Task A is complete.

'ihe cunmary of the Task A work is doctmented in mano 2524-QA-11 dated July 27,~1984. Several additional immos were generated to docuacnt previous work completed.

These included sunmary mano 2524-QA-13 which described the GE procedure structure for the design control audits (sub-

. task A2), and sunmary menos 2524-QA-12,14, and 15, docunenting early procedure revisions (subtask A6).

TASK B DESIGN PROCEDURE IMPLEMENTATION REVIIN Bl= Completc - Procedure 252il-PD-2 issued.

Docunents 'have been selected and are consistent with the technical review q

B2 in Task C.

Several additional docunents are required and will be included in the revicw as a result of the extended technical review noted in Cll.

1his subtask is considered complete.

2 Task B revicuers visited PECo and GE to revis design d B3 able at ' TFr..

Since the locations of doctments revicu docunents not transnitted to TPT.

are identified, this subtask is considered complete.

All checid.ists to conduct the design docunent conformance revicws are ecm and GE design doctments were initiated.

PA Reviwa of PEco, Bechtcl, On site revicws of PEco and GE doctments not a plcto.

+

The caaplete revicw tion was started with docunents located in San Diego.

will require a visit to Dcchtcl's San Francisco Offico, which is presentlyS a,chediil ed for the week of August 6, 19811.

subta: k ru: ain: July 10, ]9811.

DS 11o activity to date.

.TASJLG_.Tl4JITLC/LJElW Cunpletc - Procedure P52Li-PD-3 issued.

C1 Representative vendors have been identified for purposes of defining the design chain.

'lhis completes the subtack.

'lhe information will be C2 docuacnted in an engineering mano.

C3 No change.

ptsp, A visit to GE was made to revicw docunentation for the core spray This sparger, reactor vessel nozzle, and piping insido the reactor vesr.el.

fA One PFH was issued during the rcvicw.

revim has been completca.

'lhe revim of the cabic tray support.n is compieted with one FFH issued.

The revicw of electrical equipnent consisting of a ptap motor, valve motor Tne revicw operator, mitchgcar, and motor control center was completed. One PFR was of instrunentation and control cquipacnt was also caapleted.

issued during the review of I&C equipnent.

They specifically requested An HRC audit temi cvaluated the TFT progran. penetration include the penetration that the revicw of the containnent anchorage and effects on the concreto.

Appropriate docuucntation was

'lhey also asked requested fran BPC for implanentation of their rcquest.

concrete slab supporting the punp be reviewed for adequacy.

sinec this alab bears directly on the ground and hence all puup

.that the the design of this slab would be

!! wever, loads can be transnitted to the ground, governed by loadings which are not related to the co hence will not be reviewed.

f t

e

k-3-

v c..

a Dared on'the revicw work performed.to dato,. it appears that the reviw can t

'CS merc-be ' completed within the guidelinos of ANSI N45.2.ll, Section 6.3.1.

fore,. independent ' analysis with different analytical models and computer However, the coden than those used by DPC or GE chould.not be rcquired.

completion date 'is extended until.the end.of the techttical design revicw,

' August 10,_1984.

.C6 !!o activity to date.

i JASK D PJ)LSICAL VERIFICATION All work on Task D is complete.

IASK E PQTINTJJLflHDIES EL K3 Gmpl ete s

For this period, three potentia't findings were initiated under Task C.

.2e three PFH, related to the follwine, areas: cable tray e,upports, core npray nozz)c, 6nd the instruuentation and control equipuent.

All PFRs to date are in various stages of proccasing.

l TASK F ' /Gilg]fIl@E AffD__Ill@BIJJiG The stanary of projected vs. actual unnpower and percent complete gralh was updated to thcw current data, in addition Tab) e I was modificd at the rcquest of PEco to include three clcments within the schedule colunn; ori iini schedule date, revised schedulo dates, and the actual cwpletion h

dates.

A stmmary rccmo, FECO:Olli:FDC,E4 dated July 26, 1984 uas issued which doctmented ccxrnenta made by the NRC reviw of the Licmrick IDVP at TfT on t

l Jtoy 231 and 25,19811.

C 3

o lt a

August 1, 19811 i

.-o.

TABLE I~

CORE SPRAY SYSTEM

)

INDEPENDENT DESIGN REVIEW TASK / MILESTONE STKI1JS Schedule EtJmime

_fub. itch

.OrJE. Revised _ _ Actual Doc _ument

'Al Procedurc/ Checklist 5/30 5/24 252fi-PD-1 & 7 A2 Proceduro Structure 6/15 7/08 2524-QA-01,05, 07,13 A3 Access Design Procedures 6/ 15 7/06 NA A4 Bechtel Review 7/05 7/03 TPr:012:FDC:84 A5 PECo/GE Review 7/05 7/05 2524-QA-01, 05, 07 A6 Time-period Procedures 7/10 7/10 2524-QA-12, 14, 15 N(

Task Suninary 7/2tl 7/2'(

2524..QA-11 D1 Procedurc/ Checklist 5/30 5/24 2524-PD-2 P2 Docunent Sclection 6/15 7/27 7/27 B3 Docunent Location 7/01 7/2/

7/27 Bil Docunent Review 7/27 8/10 D5 Task Strrary 8/10 8/17 Cl Procedure / Criteria S/30 5/30 ab24-PD-3 C2 Design Chain 6/08 7/31 7/31 C3 Feature Selcotion Cont 2524:ENG :02: AS:8 11 C4 Desirp 1;cvica 8/]0 C5 Inde ndent Analysis 7/ 27 8/10 C6 Task Sumnary 8/ 17 D1 Walkdown Procedure 5/30 5/31 25Pfl-PD-4 D2 Item Selection 6/04 5/29 2S211:ENG :03:AS:8 11 D3 Complete Walkdown 6/27 6/15 Dil Task Suunary 8/10 6/22 2524:ENG:07:CFD:84 El Establish Committee 5/30 5/18 Proj. Directive #3 12 Dcrine Criteria S/30 5/25 2524-PD-5 E3 Procedure 5/30 5/30 252fi-PD-5 FA Processing PFRs cont F1 Management / cost cont Project Directive #1 F2 Protocol Procedurc 6/01 6/01 2524-PD-6 F3 Status Report #1 6/1 5/31 TFr:005:FDC:8 11 Status Report #2 6/ 15 6/ 15 TPT:012:FDC:8tt Status Report #3 7/1 7/2 TPT:018:FDC:8 11 Status Report #11 7/15 7/16 TPT:023:FDC:8 16 Status Report #5 8/1 8/1 TPT:029:FDC:8 11 Status Report #6 8/15 F4 Information compilation 8/15 F5 Final Report Draft 8/24 F6 Final Report-Issue 8/31 9

MAY JUNE l

Jrl,Y AUGUST 07-11 14-18L 21-25l 28-01 04-08l 11-15; 18-22! 25-29, 02-0609-13 i 16-2d 23-5$ 30-03' 06-10] 13-17 20-24' 27-31 -- 100

~

  • - - 1

- - - * ~ -


4-~~

5000 l

l i

l 90 80-4000 w

l

/

1

! yo I

/

/

/

E 60

/

8 3000

~

/

1

=

t

/

l b'~

l 50 -4 l '

I

,/

/,'

/

40-2000

/

/~

30 I

e' i

20 1000 e'

I

,s*

l 10

/

1 1

i I

~

-O 0

1920l2320! 2690l3090! 3490!3930!4290!4630 4830 4870i 4910 Proj ected-10 l 130 350 680 1100 1 1500 a

i Actual

,200 357 552 838 1169l 1536 1876l 2197A 2473l 28911 3347l 3876i s

s l

I:'TIVITY

SUMMARY

_,m-.,

.,-c.,...

- -...........n,_-

,.,