hS07 06td no Med FB,
~
- sW%2 GPU Nuclear Corporation
. Nuclear
~ um- - e-rawany. New Jersey 0705b 201-316 7000 n
TELEX 130-462 2
Writers Dweet Dal NuhrS April 29, 1992 h
C300 92-2129 g
g, so 7
4 U. S. Nuclear Regulatory Comission W
x Attn: Chief, Regulatory Publications Branch Washington, D.C.
20555
?
Dear Chief:
Subject:
NUREG 1449 Draft Report for Comment February,1992, Shutdown and Low Power Operation at Commercial Nuclear Power Plants-in the United States GPUN has been involved in the Golling Water Reactor Owner's Group (BWROG) Joint Outage Management - Shutdown issues NUREG-1449 Review Working Group which has developed numerous comments on the draft NUREG.
These comments are being consolidated by NUMARC for transmittal to NRC.
GPUN endorses the BWROG and NUMARC comments on draft NUREG-1449.
Draft HUREG-1449, Section 6.12.1, incorrectly states that Oyster Creek declared an Alert for the March,1991 event involving loss of both on-site AC power sources. An Alert was not declared for this. event and no Emergency Action Level was entered. The Oyster Creek Emergency Plan would have required an Alert level declaration had off-site AC power also been lost, and a Site Area Emergency within 15 minutes, but this did not occur.
However, it is true that thase Emergency Plan requirements would have been overly conservative for the actual plant condition at that time since the reactor was defueled, the refueling cavity was flooded with water, and spent fuel pool boiling would not have occurred for approximately 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
Additionally, it should be noted that the reference in Sections 6.12.1 and 8.6 to NUMARC/NESP-007 should be Revision 2 not Revision 1.
Sincerely, 50 g g 920429
/
e 1449 C PDR James Knubel Licensing and Regulatory Affairs, Director JK/DJD/amk cc:
R. J. Barrett - Plant Operations, Director, OC C. Brown - Department Specialist - NUMARC File - Shutdown Issues G. J. Giangi - Manager, Emergency Prepare, THI-1, E0F A. Marion - NUMARC GPU Nuclear Corpora 90n is a subsdwy of General Pubhc UtihNs Corporation