ML20095K681

From kanterella
Jump to navigation Jump to search
Corrected Page 3/4 3-12 W/Overleaf to Maintain Document Completeness to Amends 84 & 83 to Licenses DPR-80 & DPR-82, Respectively
ML20095K681
Person / Time
Site: Diablo Canyon  
Issue date: 12/21/1995
From:
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20095K685 List:
References
NUDOCS 9512290174
Download: ML20095K681 (2)


Text

. _...

TABLE 4.3-1 ou e my g REACTOR TRIP SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREENTS

>$ U 3Q TRIP 0

ACTUATING.

NODES FOR l

nN CHANNEL DEVICE WHICH CHANNEL CHANNEL OPERATIONAL OPERATIONAL-ACTUATION SURVEILLANCE og.

FUNCTIONAL UNIT CHECK CALIBRATION TEST TEST LOGIC TEST IS REQUIRED o-g on

13. Steam Generator Water Level-

$0". 51 Low-Low mN*

e.

a.

Steam Generator S

R 0

N.A.

N.A.

1. 2 m

Water Level-Low-Low b.

RCS Loop aT N.A.

R 0

N.A.

N.A.

1, 2 t

14. DELETED
15. Undervoltage-Reactor Coolant N.A.

R N.A.

Q N.A.

I Pumps w

a

16. Underfrequency-Reactor N.A.

R N.A.

O N.A.

1 wg Coolant Pumps

17. Turbine Trip a.

Low Fluid Oil Pressure N.A.

N.A.

N.A.

S/U(1. 9)

N.A.

I b.

Turbine Stop Valve N.A.

N.A.

N.A.

S/U(1. 9)

N.A.

1 Closure Ng

18. Safety Injection Input from N.A.

N.A.

N.A.

R N.A

1. 2 g

ESF A

19. Reactor Coolant Pump Breaker M.A.

N.A.

N.A.

R N.A.

1 y

Position Trip ID

20. Reactor Trip System Interlocks a.

Intermediate Range N.A.

R(4)

R N.A.

N.A.

2N Neutron Flux. P-6 Sg b.

Low Power Reactor Trips Block. P-7 N.A.

R(4)

R N.A.

N.A.

1 W

c.

Power Range Neutron Flux P-8 N.A.

R(4)

R N.A.

N.A.

I

.h I