ML20095J297

From kanterella
Jump to navigation Jump to search
Forwards Initial Part 21 Rept Re Defective Installation of Bolting in Emergency Diesel Generator Bldg Internal Wall Seismic Supports,Per 920424 Telcon
ML20095J297
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 04/27/1992
From: Spencer J
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20095J299 List:
References
REF-PT21-92 NUDOCS 9205010230
Download: ML20095J297 (1)


Text

p E

CaroHna Power & Light Company raeJunan mucasem Brunswick Nuclear Project P.

O.

Bot: 10429 Southport, NC 28461-0429 April 27, 1992 l

FILE:

B09-13520 10CFR21 U.S.

tiuclear Regulatory Commission Document-Control Desk Washington, DC 20555 l

BRUNSWICK STEAM ELECTRIC PLANT UNITS 1 AND 2 DOOKET NO. 50-325 AND 50-324 LICENSE NO. DPR-71 AND DPR-52 HOTIFICATION OF A 10CFR21 REPORTABLE OCCURRENCE This-confirms the telephone convercation at 1601 hours0.0185 days <br />0.445 hours <br />0.00265 weeks <br />6.091805e-4 months <br /> on April 24, 1992, between Mr.- Scarfo (of your staff) and Mr. Godley (of my staff) which satisfied the requirements of 10CFR21 reporting criteria. It reported that, during initial Plant construction, defectively: installed bolting of Emergency Diesel Generator Building _ internal wall seismic supports occurred.

Very truly yours,

-1 Q.

J Spence eneral h ager ru swick Nuclear Proj et.r l

-GMT/gmt Enclosure cc:

'Mr.

S.

D.

Ebneter Mr. N. 3.

Le

-Mr.

R.

L. Prevatte i:

I."

9205010230 920427

-ADOCK 0500 4

jDR 6

./

-