ML20095J297
| ML20095J297 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 04/27/1992 |
| From: | Spencer J CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20095J299 | List: |
| References | |
| REF-PT21-92 NUDOCS 9205010230 | |
| Download: ML20095J297 (1) | |
Text
p E
CaroHna Power & Light Company raeJunan mucasem Brunswick Nuclear Project P.
O.
Bot: 10429 Southport, NC 28461-0429 April 27, 1992 l
FILE:
B09-13520 10CFR21 U.S.
tiuclear Regulatory Commission Document-Control Desk Washington, DC 20555 l
BRUNSWICK STEAM ELECTRIC PLANT UNITS 1 AND 2 DOOKET NO. 50-325 AND 50-324 LICENSE NO. DPR-71 AND DPR-52 HOTIFICATION OF A 10CFR21 REPORTABLE OCCURRENCE This-confirms the telephone convercation at 1601 hours0.0185 days <br />0.445 hours <br />0.00265 weeks <br />6.091805e-4 months <br /> on April 24, 1992, between Mr.- Scarfo (of your staff) and Mr. Godley (of my staff) which satisfied the requirements of 10CFR21 reporting criteria. It reported that, during initial Plant construction, defectively: installed bolting of Emergency Diesel Generator Building _ internal wall seismic supports occurred.
Very truly yours,
-1 Q.
J Spence eneral h ager ru swick Nuclear Proj et.r l
-GMT/gmt Enclosure cc:
'Mr.
S.
D.
Ebneter Mr. N. 3.
Le
-Mr.
R.
L. Prevatte i:
I."
9205010230 920427
-ADOCK 0500 4
jDR 6
./
-