Revises 910327 & 1028 Responses to NRC Request for Addl Info Re Fracture Toughness of Feedwater Sys Matls.Existing Bonnets for Feedwater Valves 2FW-0071,2FW-0077 & 2FW-0089 Will Be Replaced W/Bonnets Meeting ASME Requirements
ML20095H226
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 04/27/1992
From: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TXX-92211, NUDOCS 9204290311
Download: ML20095H226 (2)


Text

.- - .-_ - . - - __-- .

TUELECTRIC  :

April 27. 1992 William J. Cahill, Jr.

Omp Vice Pmideat U. S. Nuclear Regulatory Commission Attn:-Documen: Control Desk ,

Washington, DC 20555 '

SUt1 JECT: C0liANCHE PEAK STEMi ELECTRIC STATION. (CPSES) - UNIT 2 DOCKET N0. 50 446 RE0tlL5T FOR ADD 1110NAL INFORMATION FR ACTURL TOUGHNESS OF THE FEEDWATER SYSTEM MATERI ALS REF: 1) TU Electric letter f rom William J. Cahill, Jr. to the U S. NRC dated March 27, 1991 (TXX-91125)

2) 10 Electric letter f rom William J. Cahill dr. to the U 5. NRC dated October 28, 1991 (TXX-91365)

Gentier.e.n Reference (1). TXX-91125, provided t'1e TV Electric final response and corrective actions to address Unit 2 Feedwater Isolation Valves (FWlVs) impact testing. Reference (2) provided the results of the additional testing and corrective actions taken.

TV Electric would like to provide the following revision to the response provided in TXX-91125.

TXX-91125 ResDonse (Second Daraaraoh of Unit 2 Corrective Action):

o_ -The eight original Unit 1 and Unit 2 bonnets share the same heat code and therefore had the same metallurgical processing history.

The results of the volumetric e u mination performed on the Unit 1 bonnets to provide additional confidence in the flaw size assumptions are applicable to the three remaining useable Unit 2 bonnets. No.further action is planned for these three bonnets.

Revised Resnnnsn o The existing bonnets for FWIVs 2FW-0071. 2FW-00T . and PFW-0089 will be replaced with new bonn7ts which meet ASME Sect u o 111.

NC-2300 requircments for impact testing, References (1) and (2, had previously indicated that the bonnet on ZFW 0083

'would be replaced With a new bonnet which meets ASME Section 111, NC-2300 requirements for impoct testing, sqope -,

e n. w  ;

(, lV 9204290311 900427 400 N. Ouve street LB. 81 Dallas Tetas 73201 PDR .ADOCh 05000446 .

'f~

A PDR

.TXX-92211 Page 2 of 2 The above actions will be completed prior to fuel ioad of Unit 2.

Supporting docunwnt s f or this corrective action will be available for NRC review at CPSCS >ite following the cunipletion of the corrective action.

Sincerely, f ,. .,

k} y,la Yled '

William J. Cahill, Jr.

MCP/ds c - Mr. R. D. Hart in. Region IV Resident inspectors, CPSES (2)

Mr. B. E. Holian, NRR E