ML20095H111
| ML20095H111 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 08/13/1984 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANPP-30190-TDS, DER-84-26, NUDOCS 8408280357 | |
| Download: ML20095H111 (2) | |
Text
'
7..
d_.{. p -
.m o
RECEIVED HRC Arizona Public Service Company f[,fg p
. e o. sox U666. PHOENIX. arf 2ONA 85036 REGiony;z;
^
August 13, 1084
~
ANPP-30190-TDS/TRB U. S. Nuclear Regulatory Commission.
Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 I
. Attention: Mr. T. W. Bishop, Director l
Division of Resident Reactor Projects and Engineering Programs
Subject:
Time Extension For Report - DER' 84-26 A 50.55(e) Potentially Reportable Deficiency Relating To Improperly Tested Or Adjusted Plunger Interlock.
File: 84-019-026; D.4.33.2 References (A) Telephone conversation between P. Narbut and T. Bradish on May 10, 1984 (B) ANPP-29646, dated June 4,1984 (Interim Report)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interia Report was transmitted by Reference (B).
At that time, it was estimated that a Final Report would be available by August 15, 1984.
A Final Report has been submitted to APS for review. It is expected that this Final Report will be transmitted to the NRC by September 15, 1984.
Very truly yours, h
k o
N
~
E. E. Van Brent, Jr.
APS Vice President Nuclear Production ANPP Project Director EEVB/1RB:nj cc: See Page Two h'
~
k O
zw go L_
m p.
- y{
.Mg.-
y (;
7 s
.,,c l'
, - 'N,y
.t Mr. T. W. Bishop as DR 84-26x Page Two
.I '
.,,X g s
Richird DeYqung, Director c ci 4,, _ %
j
~ '
- Office of.Ingpection and Enforcement U; S. Nuclear 4Reguistory Commission Washington, D. C. 20555
(
T. G. Woods, Jr.
D. B. Karner W. E. Ide D. B. Fasinacht.i f,f
,T A. C. Rogers.
'L. A. Souza
-s.
'h.
D. E. Fowler
\\'
-) '
T. D. Shriver i
C. N. Russo 9e J. Vorees
\\
g s,
.g, J. R. Bynua 6 t %
s J. M. Allen l'
j J. A. Brand A. C. Gehr e
W. J. Stubblefiald
'R.,G.'Bingham W.
i/
[3 L. Patterson
.f,
R. W. Welcher s
- 11. D. Foster
+
D. R. Hawkinson
't / L. E. Vorderbrueggen 77.. P. Zimmerman S' R. Frost g
J.'Self N
M. Woods T. J. Bloom
,. Records Center Institute of Nuclear Power Operations t
1100 circle 75 P.trkway, Suite'1500
.Atlan'ta, GA 3033,9' y
i
- ' i l
s'.
3,
\\
h a
a g
2, i
+
r s
f i
'b I '-
I 9
.(
6.,
' #,1
./
8 t
L a
j
. yg
'g ';
,k l
s n
3
k I
a y
g y_.
+.
7