Interim Deficiency Rept DER 83-49 Re Broken Impeller Blades & Diffuser Bolts Broken/Loose in Reactor Coolant Pumps. Initially Reported on 830715.Time Extension Until 840915 for Final Rept Requested for post-demonstration Test Insp
ML20095H057
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/13/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-30188-TDS, DER-83-49, NUDOCS 8408280317
Download: ML20095H057 (2)


Text

'

ya t\Ecavgo NRC Anzona Public Service Company G3 g g7 ,

REWonyy,p August 13, 1984 ANPP-30188-TDS/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 83-49 A 50.55(e) Potentially Reportable Deficiency Relating To Broken Impeller Blades And Diffuser Bolts Broken / Loose In Reactor Coolant Pumps.

File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between P. Narbut and R. Tucker on July 15, 1983 (B) Telephone conversation between T. Young and R. Tucker on July 18, 1983 (C) ANPP-27593, dated August 19, 1983 (Interim Report)

(D) ANPP-28734, dated January 27,1984 (DER 83-50 Interim Report, Revision 1)

(E) ANPP-28733, dated January 27, 1984 (Interim Report, Revision 1)

(F) ANPP-28313, dated November 29, 1983 (Time Extension)

(G) ANPP-29713, dated June 11, 1984 (Time Extension)

(H) Telephone conversation between P. Narbut and T. Bradish on August 14, 1984

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A) and (B), Interim Reports were transmitted by Reference (C), (D) and (E), and Time Extensions were requested by Reference (F) and (G). At that time, it was estimated that a Final Report would be available by August 15, 1984.

. As discussed in Reference (H) the Post Demonstration Test Inspection is in process. The results of the inspection must be evaluated prior to submittal of the Final Report. APS expects this report to be completed prior to August 31, 1984, however, a time extenstion is requested until September 15, 1984.

S

!l0  !

ZE- 2 7

.:o.

Mr. T. W. Bishop DER 83-49 Page Two There is.no new information or change to the Interim Report at this time.

Very truly ou , T EE.  %

E. E. Van Brunt, Jr.

APS Vice President

, Nuclear Production ANPP Project Director EEVB/TRB:nj cc: Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo J. Vorees J. R. Bynum J. M. Allen J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen R. P. Zimmerman S. R. Frost J. Self M. Woods T. J. Bloom Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500

Atlanta, GA 30339 i

- - . - . .