Interim Deficiency Rept DER 82-80 Re Low Insulation Resistance Values for Terminal Blocks Supplied by Conax Corp.Initially Reported on 821217.Final Rept Expected by 840903
ML20095G999
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/17/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-30269-TDS, DER-82-80, NUDOCS 8408280283
Download: ML20095G999 (2)


Text

-

RECEIVED tmc Arizona Public Service Company IS84 AUG 20 Pil D 47 REGIOliy15y August 17, 1984 ANPP-30269-TDS/TRB U. S. Nuclear Regulatory Commission

' Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 82-80 A 50.55(e) Potentially Reportable Deficiency Relating To Low Insulation Resistance Values For Terminal Blocks Supplied By Conax Corporation.

File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between T. Young and G. Duckworth on December 17, 1982 (B) ANPP-22736, dated January 17, 1983 (Interim Report)

(C) ANPP-23642, dated May 3, 1983 (Time Extension)

(D) ANPP-27619, dated August 23, 1983 (Time Extension)

(E) ANPP-28539, dated January 3, 1984 (Interim Report)

(F) ANPP-28933, dated February 24, 1984 (Time Extension)

(G) ANPP-29351, dated April 24, 1984 (Time Extension)

(H) ANPP-29667, dated June 5,1984 (Interim Report)

(I) ANPP-30064, dated July 30, 1984 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), Interim Reports were transmitted by References (B), (E),

and (H), and Time Extensions were requested by References (C), (D), (F),

(G), and (I). At that time, it was estimated that a Final Report would be available by August 17, 1984.

A Final Report has been submitted to APS for review. It is expected this Final Report will be tiansmitted to the NRC by September 3, 1984.

Very truly ours, G L(

A LL E. E. Van Brunt, Jr.

g400gB[3 8400 {g APS Vice President 05000 DR Nuclear Production PDR ANPP Project Director EEVB/TRB:nj cc: See Page Two ZE-27

-Mr. T. W. Bishop DER 82-80 Page Two ec:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo J. Vorees J. R. Bynum J. M. Allen J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R.

I,. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E, Vorderbrueggen R. P. Zimmerman S. R. Frost J. Self M. Woods T. J. Bloom Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339 u