PHILADELPHIA ELECTRIC COMPANY 23O1 M ARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 (2151841-4502 AUG 131984
-.c"='""
(NGINEE RING AND RFSE ARCH Mr. A. Schwencer, Chief Docket Nos.:
50-352 Licensing Branch No. 2 50-353 Division of Licensing U. S. Nuclear Regulatory Ccmnission Washington, D.C. 20555
Subject:
Limerick Generating Station, Un'ts 1 and 2 Infonnation for Auxiliary Systems Branch (ASB)
Regarding SER License Condition #7: Cmpliance with NUREG-0612 (Phase II, Heavy Loads).
Reference:
(1) Letter, A. Schwencer (NRC) to E. G. Bauer, Jr.
(PECO), dated 2/6/84.
(2)
Ietter, J. S. Kemper (PECo) to A. Schwencer, dated 7/26/84
Enclosures:
(1)
Limerick Overhead Handling Systers Final Report (Revision 3)
(2)
Revision 3 Change List (3) Ccunents on the Phase II Draft Technical Evaluation Report File:
GOVT l-1 (NRC)
Dear Mr. Schwencer:
We are pleased to provide the following information to support the resolution of SER license condition #7.
Pursuant to your request in Reference (1), the Enclosure (1) report.has been revised to address concerns identified in your draft technical evaluation report (TER) on the control of heavy loads (Phase II). The TER was transmitted with Reference (1).
Our revised report denonstrates ccznpliance with the guidelines of Sections 5.1.2 through 5.1.6 of NUREG-0612, " Control of Heavy Ioads at Nuclear Power Plants" (Phase II).
Consistent with SER License Condition #7, the Enclosure (1) procedure for-the control of heavy loads will be fully inplemented before startup after the second refueling outage. However, consistent with our Reference (2) cmmitments, before the standby gas treatrent systan (SGTS) is connected to the refueling floor, we will handle any load over irradiated fuel in accordance with the appropriate Enclosure (1) procedures.
8408230292 840813 PDR ADOCK 05000352 1
E PDR k
I i
1
+.
For your information, Enclosure (2) lists the significant Revision 3 changes to our final report.
Enclosure (3) offers our u,.cris and clarifications to correct minor errors contained in the Phase II draft TER.
- Should any additional information be required, please do not hesitate to contact us.
Sincerely,
&_ f f -L yy
-JHA/gra/07268401 cc: See Attached Service List
7,
, ~
cc: Judge Lawrence Brenner-(w/o enclosure)
Judge._ Richard F. Cole (w/o enclosure)
Troy B.: Conner, Jr., Esq.
(w/o enclosure)
Ann P. Hodgdon, Esq.
(w/o enclosure)
.Mr. Frank R.' Romano (w/o enclosure)
Mr.' Robert L. Anthony (w/o enclosure)
Charles W..Elliot, Esq.
(w/o enclosure)
Zori G. Ferkin, Esq.
(w/o. enclosure)
Mr. Thomas Cerusky (w/o enclosure)
Director,-Penna. Emergency (w/o enclosure)
Management Agency Angus R. Love, Esq.
(w/o enclosure)
David Wersan, Esq.
(w/o enclosure)
Robert J. Sugarman, Esq.
(w/o enclosure)
Spence W. Perry, Esq.
_(w/o enclosure)-
Jay M. Gutierrez, Esq.
(w/o' enclosure)
- Atomic Safety & Licensing (w/o enclosure)
Appeal Board Atomic Safety & Licensing (w/o enclosure)
Board Panel Docket & Service Section (w/o enclosure)
Martha W. Bush, Esq.
(w/o enclosure)
Mr. James Wiggins (w/o enclosure)
Mr. Timothy R. S. Campbell (w/o enclosure)
Ms. Phyllis Zitzer (w/o enclosure)
Judge _ Peter A. Morris (w/o enclosure)
+
t t
L