Entergy Operations,inc.
s W. T. Cottle April 15, 1992 U.S. Nuclear Regulatory Commission Mail Station P1-137 Washington, D.C.
20555 Attention:
Document Control Desk
Subject:
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Monthly Operating Report GNRO-92/00037 Gentlemen:
In accordance with the requirerant of Technical Specification 6.9.1.10, Entergy Operations is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit 1 for March 1992 (attachment).
If you have any questions or require additional information, please contact this office.
Yours truly,
^
4<D 7 W
WTC/TMC/cg attachments: 1.
Operating Status 2.
Average Daily Power Level 3.
Unit Shutdowns and Pcwer Reductions cc:
(See next page)
?, A.0 G O M00PJAN f 4 1
9204210057 920331 PDR ADOCK 05000416 R
April 15, 1992 GNRO-92/00037 Page 2 of 3 cc:
Mr. D. C. Hintz (w/a) fir. J. L. Mathis (w/a)
Mr. R. B. McGehee (w/a)
Mr. N. S. Reynolds (w/a)
Mr. H. L. Thomas (w/o)
Mr. Stewart D. Ebneter (w/a)
Regional Administrator U.S. Nuclear Regulatory Commission Region 11 101 Marietta St., N.W., Suite 2900 Atlanta, Georgia 30323 Mr. P. W. O'Connor, Pro sct Manager (w/a)
Office of Nuclear Reactor Regu'.ation U.S. Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C.
20555 M00PJAN l
~
~ to GNR0-92/00037 DOCKET NO.
50-416 DATE 04/08/92 COMPLETED BY L. F. Daughtery TELEPHONE (601)437-2334 OPERATING STATUS 1.
Unit Name: GGNS UNIT 1 Notes:
2.
Reporting Period:
March 1992 3.
Licensed Thermal Power (MWl): 3833 MWT 4.
Nameplate Rating (Gross MWE): 1372.5 MWE 5.
Design Electrical Rating (Net MWe): 1250 MWE 6.
Maximum Dependable Capacity (Gross HWe): 1190 MWE 7.
Maximum Dependable Capacity (Net MWe): 1143 MWE 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.
.Give Reasons:
N/A 9.
Power Level To Which Restricted, In Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A This Month Yr to Date Cumulative
- 11. Hours In Reporting Period 744 2,184 65,296
- 12. Number of Hours Reactor Was Critical 744.0 2,011.0 52,2087T 0
0
- 13. Reactor Reserve Shutdown Hours 0 ~
1,960.0 50,010.4
- 14. Hours Generator On-Line 744.D-
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 2,817,260 7,289,662 173,012,846
- 17. Gross Electrical Energy Generated (MWH) 900,812 2,335,318 54,905,428
- 18. Net Electrical Energy Generated (MWH) 865,895-2,240,178 52,500,893
- 19. Unit Service Factor 100.0 89.7 79.3
- 20. Unit Availability Factor 100.0 89.7 79.3
- 21. Unit Capacity Factor (Using MDC-Net) 101.8 89.7 75.6
- 22. Unit Capacity Factor (Using DER Net) 93.1 82.1 68.5
- 23. Unit Forced Outage Rate 0
10.3 6.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Begin Refueling Outage - 5 on 04/17/92 for an estimateo duration of 46 days.
- 25. If Shut Down At End of Report Period.
Estimated Date of Startup:
NA
- 26. Units In Test Status (Prior to Commercial Operation).
Forecast Achieved INITIAL CRITICALITY 08/18/82 INITIAL ELECTRICITY 10/20/84 COMMERCIAL OPERATION 07/01/85 MOOPMAR/SCMPFLR
_______ _ - _ _ _ _ _ _ _ _ _ _ _. to GNR0-92/0037
~
l DOCKET NO.
50-416 UNIT 1
DATE 04/08/92 COMPLETED BY L. F. Daughtery TELEPHONE 601-437-2334 MONTH March 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 1177 17 1166 2
1172 18 1165 3
1171 19 1176 4
1161 20 1188 5
1117 21 1176 6
1169 22 1138 7
1160 23 1193 8
1169 24 1185 9
1145 25 1163 10 1184 26 1177 11 1198 27 1176 12 1188 28 1019 13 1190 29 1106 14 1175 30 1137 15 1177 31 1181 16 1181 N/A M00PMAR/SCMPFLR
J t& hmer? ^ to GNRO-9,2/00037' UNIT SHUTDOWNS AND POWER REDUCTIc9
~
CCKET M.20-416
- 'NM 1
[--
G 04/00 i^
ETED BY
[. F. Mughtery
,EPHONE 601-4.37-2334 REPORT MONTH March _1932
~
l
.i l:
Miliod_of l Licensee
'~
T,o: rect l
No.
Date Type Duraticr.
Reason. Shutting Downl Event System ; Componei.:
To l
(1)
Hours (2)
Peactor 9 Rep"rt #
Code Cotic
,i. i<ecurrencs l
(3)
(4) l (5;
l C&CA) l I
t l
l None -l l
l l
U l
l l
l i
I i
l I
1 I
l I
I l
UNIT SHUTDOWNS AND POWER REDUCTIONS 1
2 3
4 F: Forced Reason:
'Methed:
Exhibit G - Instructions S: Scheduled A-Equipment Failurt 1-Manual for Preparation of Data (Explain) 2-Manual Scram Entry Sheets for Licensee B-Maintenance or Test 3-Automatic Scram Event Report (LER)
C-Refueling
+ Continued File (NUREG-0161)
D-Regulatory Restriction 5-Reduced load E-Cperator Training &
6-Other Licensing Examination F-Administrative 5
G-Operational Error Exhibit 1-Same Source (Explain) h-Other (Explain) i f
M00PMAR/SCMPFLR
-