OPERATING DATA REPORT REVISED DATA DOCKET NO.
50-336' DATE 03/05/92 COMPLETED BY J. Gibson TELEPHONE (203) 447-1791
. EXT.
4431 s
QPERATING STATUS Notes: Items 21 and 22 1,
Unit Name:
M111stene Unit 2 cumulative are weighted 2.
Reporting Period:
- February 1992 ave
- ages. Unit operated 3.- Licensed Thermal Power (MWt):
2700 at 2560 MWTH prior to its 4.
Nameplate Rating (Gross MWe):
909 uprating to the current 5.
Design Electrical Rating (Net MWe):.
870 2700 MWTH power icvel.
6.
Maximum Dependable Capacity (Gross MWe):
- 69) 8%
7.
Maximum Dependable Capacity (Net MWe):
852.88 8.
If Changes Occur-in Capacity Ratings (Items Number 3 Through 7) Since Last Raport, Give Reasons:
N/A 9..
Power Level To Which Restricted, If any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A This Month Yr.-To Date Cumulative
- 11. Hours In Reportin5 Period 696.0 1440.O_
141840.0
- 12. Number Of Hours Reactor Was Critical 393.7 1043.9 103097.5
- 13. Reactor Reserve Shutdown Faurs 0.0 0.0 2205.5
- 14. Hours Generator On-Line 382.1 1030.8 98199.6 0.0 0.0 468.2
- 15. Unit Reserve Shutdown hours
__ _975691.0 2684715.0 270207179 4
- 16. Gross Thermal Energy Generated (MWH) 325219.5 895797.0
__82472468.0 17, Gross Electrical Energ, Generated (MWH}.
310104.5 860111.0 79105889.0
- 18. Net' Electrical Energy Generated (MWH)
- 19. Unit Service Factor 56.9 72.8 69.2
- 20. Unit Availability Factor 56.9 72.8 69.6 53.5 70.4 65.5
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net) 53.0 69.8 64.3
- 23. Unit Forced Outage Rate 45.1 28.4_
15.7
- 24. Shutdowns Scheduled Over Next'6 Months (Type, Date, and Duration of Each):
EOC 11 Refuel itnd Senam Generator Replacement Outage. May - 1992. 160 days.
.25. If Unit Shutdoan At End Of Report Period, Estirated Date of Startup:
E00 11
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
- REVISED DATA VALUES DUE TO CALCULATIONAL ERROR l