s i

1 .,.

. (
  • - OPERATING DATA REPORT

, REVISED DATA DOCKET NO. 50-336' _

DATE 03/05/92 COMPLETED BY J. Gibson TELEPHONE (203) 447-1791

. EXT. 4431 s

QPERATING STATUS Notes: Items 21 and 22 1, Unit Name: M111stene Unit 2 cumulative are weighted

2. Reporting Period:
  • February 1992 ave
  • ages. Unit operated 3 .- Licensed Thermal Power (MWt): 2700 at 2560 MWTH prior to its
4. Nameplate Rating (Gross MWe): 909 uprating to the current
5. Design Electrical Rating (Net MWe): . 870 2700 MWTH power icvel.
6. Maximum Dependable Capacity (Gross MWe): 69) 8%
7. Maximum Dependable Capacity (Net MWe): 852.88
8. If Changes Occur-in Capacity Ratings (Items Number 3 Through 7) Since Last Raport, Give Reasons:

N/A 9.. Power Level To Which Restricted, If any (Net MWe): N/A

10. Reasons For Restrictions, If Any: N/A This Month Yr.-To Date Cumulative
11. Hours In Reportin5 Period
  • 696.0
  • 1440.O_
  • 141840.0
12. Number Of Hours Reactor Was Critical 393.7 1043.9 103097.5
13. Reactor Reserve Shutdown Faurs 0.0 0.0 2205.5
14. Hours Generator On-Line 382.1 1030.8 98199.6
15. Unit Reserve Shutdown hours 0.0 0.0 468.2
16. Gross Thermal Energy Generated (MWH) __ _975691.0 2684715.0 270207179 4 17, Gross Electrical Energ, Generated (MWH}. 325219.5 895797.0 __82472468.0
18. Net' Electrical Energy Generated (MWH) 310104.5 860111.0 79105889.0
19. Unit Service Factor
  • 56.9
  • 72.8 _

69.2

20. Unit Availability Factor
  • 56.9
  • 72.8 69.6
21. Unit Capacity Factor (Using MDC Net)
  • 53.5
  • 70.4 65.5
22. Unit Capacity Factor (Using DER Net)
  • 53.0
  • 69.8 64.3
23. Unit Forced Outage Rate 45.1 28.4_ 15.7
24. Shutdowns Scheduled Over Next'6 Months (Type, Date, and Duration of Each): EOC 11 Refuel itnd Senam Generator Replacement Outage. May - 1992. 160 days.

.25. If Unit Shutdoan At End Of Report Period, Estirated Date of Startup: E00 11

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

  • REVISED DATA VALUES DUE TO CALCULATIONAL ERROR l

4 J.hn"$$lA$$$h6 R

.. _