ML20094S345

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Mar 1992 for Millstone Nuclear Power Station,Unit 2 & Revised Monthly Operating Rept for Feb 1992 for Unit 2
ML20094S345
Person / Time
Site: Millstone Dominion icon.png
Issue date: 04/07/1992
From: Scace S
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20094S347 List:
References
MP-92-363, NUDOCS 9204140368
Download: ML20094S345 (1)


Text

.

-1;

' NORTHEAST UTILITIES o.n.,s Oaico,. soia.n si,..i. e.,iin. Conneci,cui

~ mm.

n_, _, --

1 uce

--w.i nem c""

P.O BDX 270 Eum 7v$ IE.Ye$ m HART;'ORD. CONNECTICUT 061410270 A

L J

(203) 665-5000 w wta waa, w.,

April 7, 1992 Mp-92-363 Re:

100FR50.71(a)

U.S.. Nuclear. Regulatory Commission Document Control Lesk Washington, D. C. 20555

Reference:

Facility Operating License No. DPR 65 Docket No. 50-336

Dear Sir:

This letter is forwarded to provide the report of operating and shutdown experience relating to Millstone Unit 2 for the montl. of March, 1992, in j

accordance with Appendix A Technical Specifications, Section 6.9.1.6.

One additional copy of the report is enclosed. Also enclosed is a revised copy of the February, 1992, Operating Data Report.

Very truly yours, NORTHFAST NUCLEAR ENERGY COMPANY

' hj (DC&

Stepheh S',

Scace Station Director Millstone Nuclear Power Station

-SES/GN

.cc: T. T, Martin, Reginn I Administrator G. S. Vissing, NRC Project Manager, Millstone Unit No. 2 L J. Raymond, Senior Resident Inspector, Millstone Unit Nos. 1,263 9 d O '4'1 4 6 3 e,B 9 2 0 4 0 7

^

~

PDR ADOCK 05000336 j

R pyn Ik nsam ncv 4.es

-.