Informs That LAR to Convert CPSES TS to Improved TS Will Be Delayed Approx 7 Months
ML20094Q510
Person / Time
Site: Comanche Peak  
Issue date: 11/28/1995
From: Terry C, Woodlan D
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TXX-95292, NUDOCS 9512010231
Download: ML20094Q510 (3)


Text

.

(

,A i

" :l"" =

d Log # TXX 95292

_._,r r

File # 10010 916.5 (GEN) i TUELECTRIC Ref. # 10CFR50.90 10CFR50.36 c.t c.Tmy November 28, 1995 Group Vke tresMent.Nudeer U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555'

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50 445 AND 50 446 TECHNICAL SPECIFICATION CONVERSION PROJECT REVISED SUBMITTAL SCHEDULE REF: 1) TU Electric letter logged. TyY-95165 from C. L. Terry to the NRC dated June 9, 19%

2) NUREG 1431

" Standard Techni;al Specifications Westinghouse Plants," Revision 1. April :.995.

Dear Sirs:

In the referenced letter. TU Electric notified the NRC of its intention to complete and submit the License Amendment Request (LAR) for the conversion of the CPSES Unit 1 and 2 Technical Specifications (TS) to the format and expanded bases of the improved Standard Technical Specifications (STS) in April of 1996. This letter revises that intention as discussed at the meeting on November 14, 1995, between members of the NRC Staff and representatives of TU Electric, Pacific Gas and Electric Company, Wolf Creek Nuclear Operating Corporation, and Union Electric Company (hereafter the " Group").

The NRC staff has stressed the importance of converting technical specifications to the impcoved STS.

The NRC staff has also stressed the value of licensees working 'ogether to increase standardization and to reduce the NRC resources neejed to act on licensing matters.

In response to these recommendations ar.J in recognition of the benefits that result, TU Electric has chosen to work jointly with the Group in the conversion of the CPSES Technical Specifications. As a result, the submittal of the LAR to convert the CPSES TS will be delayed approximately seven months.

TU Electric believes the benefits, both near term and long term, clearly justify this action.

9512010231 951128 PDR ADOCK 05000445 i

P-.

..PDR _,,,,, _,,,,,ryan w Deas. Tens nn uu sg

m (l

)

i TXX 95292 Page 2 of 3 q

The Group will jointly develop a full conversion submittal based on NUREG-1431 Revision 1 (reference 2).

Submittals for all four utilities will l

address the generic features of the Grcup members' TS in an identical

. fashion, will include applicability matrices to correlate the Group members' TS submittals, and will be docketed at approximately the same time (target date, December 1996). The Group anticipates a 4 to 6 month review by the NRC with the resultant review cost savings for each utility as outlined at the meeting. This commitment is based on the following understandings reached at the meeting:

1.

Each plant may maintain its licensing basis as established by its existing TS in the conversion process.

With appropriate justification, a given utility may optimize their TS based on another Group member's existing TS. The goal is to maximize commonality.

2.

Plant specific license amendment requests (LARs) will continue to receive timely consideration during the conversion process and especially during the NRC review cycle.

The Group will screen and limit these to the extent possible, yet it must be recognized that LARs in support of reloads and those representing either safety issues or significant cost savings will receive due consideration. Where possible. LARs submitted during the next 18 months will be jointly developed and submitted by the Group to conserve NRC review resources.

3.

The effective date for new Surveillance Requirements with a fuel cycle frequency, imposed as a result of the conversion, will be the next refueling outage occurring after the implementation of the individual plant's amendment.

4.

A single point of contact will be established within the Projects and 0TSB offices at NRR.

Likewise the Group's single point of contact is Don Woodlan of TV Electric.

5.

Given the above commitment to conversion, enforcement discretion will not be denied or delayed solely on the basis that a given plant has not yet converted, especially when the basis of the requested discretion is NUREG 1431 Revision 1.

Each request for such discretion will be judged on its own merit.

j', - -

TXX 95292 Page 3 of 3 I

If you have any questions on the above, please contact the Group chairman, Don Woodlan of TV Electric, at (214)812 8225.

Sincerely, j

C. L. Terry By:

D. R. Woodlan i

Docket Licensing Manager DRW i

cc:

Mr. L. J. Callan, Region IV i

Hr. W. D. Johnson, Region IV Mr. T. J. Polich, NRR Resident Inspectors i

t i

s e

i i

t t

(

t