ML20094P711
| ML20094P711 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 08/14/1984 |
| From: | Mittl R Public Service Enterprise Group |
| To: | Schwencer A Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20094P713 | List: |
| References | |
| IEIN-83-80, NUDOCS 8408170336 | |
| Download: ML20094P711 (2) | |
Text
xy
-w-y i
D b
hn
""'"S**
E 3
ny 80 Park Plaza, Newark, NJ 07101/ 201430-8217 MAILING ADDRESS / P.O. Box 570, Newark, NJ 07101 l
Robert L. Mitti General Manager Nuclear Assurance and Regulation August 14, 1984 L
Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission
'7920 Norfolk Avenue-Bethesda, Maryland 20814 Attention:
Mr. Albert Schwencer, Chief Licensing Branch 2 Division of Licensing Gentlemen:
HOPE CREEK GENERATING STATION DOCKET NO. 50-354 STIFF PIPE CLAMP ANALYSIS Public Service Electric and Gas Company (PSE&G) hereby submits three (3) copies of the attached General Electric Company Design Memo Nos. 170-107 and Nos. 170-109 and Bechtel Power Corporation Stress Report Calculation No. SR-10855-SS-27.
This submittal addresses the NRC f
concerns regarding stiff pipe clamps as described in IE Information Notice 83-80, and provides the basis for the response to NRC Mechanical Engineering Branch Question j
No. 210.53 and Draf t Safety Evaluation Report Open Item No. 96.
Should you have any questions in this regard, please contact us.
Very truly yours, ll f
i h
8408170336 840814 PDR ADOCK 05000354 g
G PDR Attachment - Three (3) copies of General Electric Company Design Memo Nos. 170-107, and 170-109, and Bechtel Power Corporation Stress Report Calculation No. SR-10855-SS-27.
The Energy People MA 14 01-C
% 4T2 (4VI 7 83 Lm
h s
Director of Nuclear Reactor Regulation 2
8/14/84 C
D.
H. Wagner (w/ attach)
USNRC Licensing Project Manager W. H. Bateman (w/ attach)
USNRC Senior Resident Inspector MA 14 01/02-B