Text
_
- [/N C mmtnw:alth Edisun
.) ouad Ctbes Nuclear Power Station I
22710 206 Avenue North
\\c, #) C ordcrva, t!hnois G1242-9740
, hj Telephone 309$54 224i RLB-92-078 Narch 30, 1992 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Hashington, D.C.
20555
Subject:
Revision to Quad Cities Nuclear Station Unit 1 Summary Status of Fuel Performance MRf_QQckeLNumb2L50:254 Enclosed is a revision to the " Quad-Cities Nuclear Power Station Unit 1, Summary Status of Fuel Performance, End of Cycle 11, November, 1990 letter dated January 31, 1991.
A typographical error was discovered in the description of the new assemblies loaded in Unit 1 Cycle 12.
The description of the bundles "LYV-GE8X8EB" should have been written "LYV-GE8X8HB."
This report is submitted to you in accordance with the Special Report Requirements of Table 6 b-1, Docket Number 50-254, DPR-29.
Very truly yours,
/R. L. Ba Station Manager n
RLS/JM/pim Enclosure cc: A. B. Davis, Regional Administrator T. Taylor, Senior Resident Inspector D. Galle, Commonwealth Edison Rieck, CECO File 4-
.n
.~ -
m, g )( Is N I
99l swa m 9204080273 920330
//f PDR ADOCV 05000254
/
P PDR
e QUAD-CITIES NUCLEAR POWER STATION UNIT ONE
SUMMARY
STATUS OF FUEL PERFORMANCE END OF CYCLE ELEVEN NOVEMBER 1990 At the end of_this reporting period, Quad-Cities Unit One has completed Eleven
. Reactor-cycles of operation.
During that time, 2512 fuel assemblies had seen duty in the Unit One core.
Sipping was performed on two reload fuel assemblies at the End of Cycle Eleven.
Sipping and visual inspection of fuel assembly LYD482 was performed due to contact with the cattle chute ramp of the fuel pool.
No visible damage to the fuel assembly was found during the inspection and sipping revealed no failed fuel rods.
The GE P8X8R (barrier clad) assembly (LYD396) reconstituted in October 1989 with six13E Lead Barrier Test Assembly rods was visually inspected and sipped by GE as part of the Lead Barrier Test Program.
The sipping and visual inspection of the fuel assembly revealed no failed fuel rods.
Both LYD482 and LYD396 were reloaded into the core for cycle twelve operation.
No other reload fuel assemblies were sipped since chemical and radiochemical data collected during Cycle Eleven gave no indication of leakage or fuel failure during the cycle.
For. Unit One Cycle 12, 144 new LYV-GEBX8NB (barrier clad) assemblies were visually inspecten.
These one hundred forty four GE 8X8NB assemblies were loaded into the Unit One for Cycle 12 operation.
l
-