ML20094K824

From kanterella
Jump to navigation Jump to search
Forwards List of Revs to Plant Emergency Procedures (Pep), Consisting of Rev 038C to App a of Pep, Emergency Response Resources. W/920323 Release Memo
ML20094K824
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 03/09/1992
From: Spencer J
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20094K827 List:
References
BO9-11720, NUDOCS 9203230208
Download: ML20094K824 (4)


Text

_

g Cp&L Carolina Power & Light Corepony Brunswick Nuclear Project MAR 91992 PILE:

B09-ll720 Mr. S. D. Ebneter, Administrator U. S. Nuclear Regulatory Commission Suite 2900 101 Marietta Street NW Atlanta, GA 30323 ERUNSWICK STEAM ELECTRIC PIRIT UNITS 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR 71 AND DPR-62 EMERGENCY PIANNING

Dear Mr. Ebneter:

In accordance with 10CPR50, Appendix E, Carolina Power & Light Company hereby transmits one copy of recent revisions to the Brunswick Steam Electric Plant emergency procedures. A lint of the revisions is enclosed for your use.

If you have any questions on this subj ec t, please contact our Regulatory Compliance staff.

Very truly yours, 74 GW J. W. Spene r, General Manager Brunswick Steam Electric Plant Mui/ps MSC/90-0062 Enclosure ec:

Resident Inspector (NRC-BSEP)

/,/,j

\\, ? - '

NRC Document Control Deck M. R. Oates 9'

[h0M 7

)g G'

3 7[

/

scosa 1

i or l,/ 4..,

i i *.

t CAROLINA POWER & LICHT COMPANY-t L-BRUNSWICK STEAM ELECTRIC. PIANT UNITS 1 AND 2 l

REVISIONS TO PLMIT EMERGENCY PROCl URES i

SECTION NIMBER-TITLE REVISION PEP Appendix A Energency Response Resources 038C i

t t

t i

?

9 6

0 t

.t' s

5 I '

I l'

w-c eJ, v

r

,,--,m,

-,,.r.

re,,

-,-.nn,-.

.,-we-

, -, - ~, -

,,n,,,

---w.w,,,,n,,,r-,~,,,-w,--nam,n,w,--,ww..

--p-p

-e

i NRCS' BNP CO!1 TROLLED DOCUMEllT TRANSMITTAL /ACK110WLEDGEMENT Tot RECIPIE11T ID 083 NRC DOCUMEllT ROOM l

MAIL LOCATIO!1: WASHI!1GTO!1, DC

.DATE:

03/06/92 1

FROM:

DOCUMENT CONTROL TRANSMITTAL 920306150713 FORM /

l QTY MEDIA DOCUMENT AC/TC REV REV DATE STATUS 01 T-OPEP -APPENDIX A 038 03/05/92 APPROVED i

b i

P

)

t I

h e

COMMENTS:

,3

,/

AN AUDIT HAS.BEEN MADE TO VERIFY CORRECTNESS PER THE APPLICABLE REVISION,

SIGNATURE INDICATES DISPOSITION-OF DOCUMENT (S) LISTED & COMPLIANCE WITH

! './

NUMBERS, AND THESE CHANGES WILL BE CONVEYED TO THOSE AFFECTED.

--DISPOSITION INSTRUCTIONS. RETURN TO DOCUMENT CONTROL j

SIGNATURE:

DATE:

j,.3 w a.

Ei ^ "

      • "**Q, 4

[

NUCLEAR REG LATORY COMMISSION VASHWO TOP, D. C. 20666

(*...*

korch=23, 1992 i

50-324/325 BRUNSWICK STEAM ELECTRIC PLANT HEHORANDUM FOR:

Chief.. Document Control Branch. IRH FROM:

Director. Division of Freedom of Infonnation and

-Publications Services, ADM -

SUBJECT:

REVIEW OF UTILITY EMERGENCY PLAN D5COMENTATIDN The Division:of Freedom of Information and Publications Services has reviewed

the attached document and has detennined that.it may now be made publicly

,m available.

)

_hdVt<~ $hMy DonnieH.Grfmsley. Director.-jk Division of Freedom of Info tion and Publications Services Office of Administration 1

l.

L L

l