ML20094K740

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to McGuire Nuclear Station Unit 1,Cycle 8 Startup Rept, for Criticality,Zero Power Physics Testing & Power Escalation Testing,Per Tech Spec 6.9.1.1
ML20094K740
Person / Time
Site: McGuire 
Issue date: 03/11/1992
From: Mcmeekin T
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20094K742 List:
References
NUDOCS 9203230163
Download: ML20094K740 (1)


Text

_ _ _ _ _ _ _ - _ _ - _

ll l

tu, n.ver cwrwy r c usum U Guar % kar Lewornar itrpartmrts!

I n e ih sident llM limrs leny Ruud iMG014)

( ?v4) Ai,5 18%

)!untoinilh, WIVIIb %%

t104)AI,14F0!iin UUKE POWEn March 11, 1992 U. S. Nuclear Regulatory Commission Document Control Doak Washington, D. C. 20555

Subject:

McGuiro Nuclear Station Docket Hos. 50-369 t;ycle 8 Startup Roport for Unit 1-Rovision 1

<ef. Tech Spoc 6.9.1.1 Gentlement Attached is Revision 1 of the McGuire Nuclear Station Unit 1 Cycle 8 Startup Report for Criticality, Zero Power Physics Testing, and Power Escalation Testing as required by Technical Specification 6,9.1.1.

This revision is due to LER 369/92-02, which lievolved a design l

orror in the coro power computer software discovered on January 17, 1991.

The revised portions are marked in the right hand margin.

For questions concerning this report, plee.'s contact Kathleen Mullen at (704) 875-4302.

Very truly ygura, hhIb T.f/

! t C. McMeekin, Vice President McGuire Nuclear Site cc (with attachments)

Mr. T. A. Reed, ONRR Mail Stop 9H3, OWFN Washington, D. C.

20555 Mr. S. D. Ebneter, Region II l

101 Mariotta Stroot, NW;- Suite 2900 l

Atlanta, Georgia 30323 y

l'.

Mr.'P..K. VanDoorn Senior Resloont Inspector

-McGuire Nuclear Station l-P t + 0 011 l

9203230163 920311

[-

PDR ADOCK 05000369

{

P PDR f

l t

j

%ww.o -

1

. ~.

-