ML20094K461

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Oct 1995 for Byron Nuclear Power Station
ML20094K461
Person / Time
Site: Byron  
Issue date: 10/31/1995
From: Kofron K, Vogl J
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BYRON-95-0359, BYRON-95-359, NUDOCS 9511160347
Download: ML20094K461 (14)


Text

Commonwealth Edison Company l

Ilyron Generating Station 4 450 North German Church Road Ilyron,II 61010-9794 Tel 8I4234-544i November 6, 1995 l

LTR:

BYRON 95-0359 FILE:

2.7.200 1

Document Control Desk United States Nuclear Regulatory Commission Washington, D.C.

20555 Gentlemen:

Enclosed for your information is the Monthly Performance Report covering Byron Nuclear Power Station for the period October 1 through October 31, 1995.

j Sincerely,

,C K.

L.

K fr Station M nager Byron Nuclear Power Station KLK/JV/mn cc:

H.J. Miller, NRC, Region III NRC Resident Inspector Byron IL Dept. of Nuclear Safety Regulatory Services Manager Nuclear Fuel Services, PWR Plant Support INPO Records Center G.F. Dick, Jr. - USIGC F. Yost - Utility Data Institute, Inc.

o.,

9 dh (p:\\95byritts\\950359.wpf/110895/I )

/'

I

/

\\ \\

9511160347 951031 A Unicom Company PDR ADOCK 05000454 i

R PDR

_ = -

i BYRON NUCLEAR POWER STATION UNIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT COMMONWEALTH EDISON COMPANY NRC DOCKET NO. 050-454 NRC DOCKET NO. 050-455 LICENSE NO. NPF-37 LICENSE NO. NPF-66 4

l l

(p:\\95 by ritrs\\950359.wpf/1 10895/2 )

I

+

a a

m a

)

4 I.

Monthly Report for Byron UNIT 1 for the month of October, 1995 l

A.

Summary of Operatina Experience for Unit 1 The Unit began this reporting period in Mode 1 (Power Operations).

I l

l J

l l

i l

l l

l 1

l (p:\\95byrttrs\\950359.wpf/110895/3 )

.B.

OPERATIMG DATA REPORT UNIT ONE DOCKET NO.

050-454 UNIT: Byron One DATE:

11/06/95 COMPILED BY:

J. Vogl TELEPHONE:

(815)234-5441 x2282 OPERATING STATUS 1.

Reporting Period:

October, 1995 Gross Hours:

745 2.

' Currently Authorized Power Level: 3411 (MWt)

' Design Electrical Rating: 1175 (MWe-gross)

Design Electrical Rating: 1120 (MWe-net)

Max Dependable Capacity: 1105 (MWe-net) 3.

Power Level to Which Restricted (If Any) : None 4.

Reasons for Restriction (If Any) : N/A THIS MONTH YR TO DATE CUMULATIVE

  • 5.

Report Period Mrs.

745 7,296 88,753 6.

Rx Critical Hours 504.9 7,055,9 75,041.2 7.

Ex' Reserve Shutdown Hours 0

0 38 8.

Hours Generator on Line 504.5 7,055.5 74,325.7 9.

Unit ~ Reserve Shutdown Hours 0

0 0

  • 10. Gross Thermal Energy (MWH) 1,665,557 23,252,981 227,295,970 11.~ Gross Elec. Energy (MWH) 571,075 7,920,308 76,898,590
12. Net Elec. Energy (MWH) 542,611 7,564,142 72,919,371
13. Reactor Service Factor 67.77 96.71 84.55
14. Reactor Availability Factor 67.77 96.71 84.59
15. Unit Service Factor 67.72 96.70 83.74
16. Unit Availability Factor 67.72 96.70 83.74
17. Unit Capacity Factor (MDC net) 65.91 93.82 74.35 18 Unit Capacity Factor (DER net) 65.03 92.57

'73.36

19. Unit Forced Outage Hrs.

0 0

1,794.5

20. Unit Forced Outabe Rate 0

0 2.36

21. Shutdowns Schedulec Over Next 6 Months: 2 (B1P02) (B1R07)
22. If Shutdown at End of Report Period, Estimated Date of Startup:

11/25/95

23. Units in Test Status (Prior to Commercial Operation): None
  • Note - The cumulative numbers do not reflect power generated prior to commercial service.

(p:\\95byritrs\\950359.wpf/l 10895/4 )

- ~..

(

f d.

AVERAGE DAILY UMIT POWER LEVEL UNIT ONE DOCKET NO.:

050-454 UNIT:

Byron One i

DATE:

11/06/95 COMPILED BY:

J. Vogl TELEPHONE:

(815)234-5441 x2282 MONTH: October, 1995 i

l

+

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) l 1.

1095 MW 16.

1108 MW 2.

1098 MW 17.

1097 MW 3.

1096 MW 18, 1100 MW l

4.

1094 MW 19.

1094 MW j

c 5.

1100 MW 20.

1092 MW i

6.

1102 MW 21, 817 MW f

7, 1106 MW 22.

-12 MW 1

8.

1031 MW 23.

-13 MW l

9.

1103 MW 24.

-12 MW 10.

1103 MW 25.

-13 MW 11, 1094 MW 26.

-12 MW 12.

1090 MW 27.

-12 MW 13.

1092 MW

28..

-12 MW 14, 1106 MW 29.

-12 MW 15.

1109 MW 30.

-12 MW 31.

-12 MW INSTRUCTIONS l

On this form list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt. These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity 10 used for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line.)

In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

I (p:\\95byrltrs\\950359.wpf/110895/5 )

Report Period: October 1995 UNIT SHUTDOWNS / REDUCTIONS BYRON (UNIT 1)

Fo.

Date Type Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence 6

10/20/95 F

21 A

5 MS VALVE

  1. 3 H.P. GOV. VALVE FAILED CLOSED CAUSING LOAD DROP.

7 10/21/95 S

14 B

5 L15616 AND L17101 STABILITY TRIP RELAYS OPEN FOR MICROWAW WORK.

8 10/21/95 S

240.5 B

1 S/G BEGAN B1P02 INSPECTION OF STEAM GENERATORS Summary TYPE Reason Method System & Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

& License Examination 9-Other (LER) File (NUREG-0161)

(p:\\95by thrs\\950359.mpf/ I 10895/6 )

E.

UNIOUE REPORTING REOUIREMENTS (UNIT 1) for the month of October, 1995 1.

Safety / Relief valve operations for Unit One.

VALVES NO & TYPE PLANT DESCRIPTION DATE ACTUATED ACTUATION CONDITION OF EVENT None 2.

Licensee generated changes to ODCM.

None 3.

Indications of failed fuel.

Yes.

Fuel Reliability Indicator:

FRI = 2.1 E-4 pCi/CC i

i l

(p:\\95 by ritrs\\950359.wpt/110895/7 )

F.

LICEMSEE EVEE4T REPORTS (UNIT 1)

The following is a tabular summary of all Licensee Event Reports for Byron Nuclear Power Station, Unit One, occurring during the reporting period, October 1, 1995 through October 31, 1995.

This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.

Occurrence Licensee Event Report Number Date Title of Occurrence LER 454:95-005 10/10/95 Fire Protection Report Discrepancies Due to Inadequate Evaluations During Preparation of Original Analysis LER 454:95-006 10/27/95 Missed Surveillances During Steam Generator Tube Inspection (p:\\95byritrs\\950359.wpf/110895/8 )

4 I

I, Monthly Report for Byron UMfT 2 for the month of October, 1995

,A.

' Summary of Operatina Experience for Unit 2 The Unit began this reporting period in Mode 1 (Power Operations).

]

i 1

i l

l I

l l

l (p:\\95byrttrs\\950359.wpf/110895/9)

$. OPERATIMG DATA REPORT UMIT TWO DOCKET NO.4 050-455 UNIT:

Byron Two DATE:

11/06/95 COMPILED BY:

J. Vogl TELEPHONE:

(815)234-5441 x2282 OPERATING STATUS 1.

Reporting Period: October, 1995.

Gross Hours:

745 2.

Currently Authorized Power Leve01: 3411 (MWt)

Design Electrical Rating: 1175 (MWe-gross)

Design Electrical Rating: 1120 (MWe-net)

Max Dependable Capacity: 1105 (MWe-net) 3.

Power Level to Which Restricted (If Any). None 4.

Reasons for Restriction (If Any) : N/A THIS MONTH YR TO DATE CUMULATIVE

  • 5.

Report Period Hrs.

745 7296 71,857 l

6.

Rx Critical Hours 745 6,275.5 62,790.9 7.

Rx Reserve Shutdown Hours 0

0 0

8.

Hours Generator on Line 745 6,246.9 62,156.7 9.

Unit Reserve Shutdown Hours 0

0 0

10 Gross Thermal Energy (MWH) 2,517,318 20,095,024 185,078,922

11. Gross Elec. Energy (MWH) 868,683 6,878,367 63,012,551
12. Net Elec. Energy (MWH) 832,898 6,555,392 59,842,789 1
13. Reactor Service Factor 100 86.01 87.38
14. Reactor Availability Factor 100 86.01 87.38
15. Unit Service Factor 100 85.62 86.50
16. Unit Availability Factor 100 85.62 86.50
17. Unit Capacity Factor (MDC net) 101.18 81.31 75.37
18. Unit Capacity Factor (DER net) 99.82 80.22 74.36
19. Unit Forced Outage Hrs.

0 0

1,399.2

20. Unit Forced Outage Rate 0

0 2.20

21. Shutdowns Scheduled Over Next 6 Months: None
22. If Shutdown at End of Report Period, Date of Startup: None
23. Units in Test Status (Prior to Commercial Operation): None
  • Note - The cumulative numbers do not reflect power generated prior to commercial service.

(p:\\95 by ritrs\\950359.wpf/ I 10895/10 )

d.

AVERAGE DATLY UNIT POWER LEVEL UNIT TWO DOCKET NO.:

050-455 UNIT: Byron Two DATE:

11/06/95 COMPILED BY:

J.

Vogl TELEPHONE:

(815)234-5441 x2282 MONTH: October, 1995 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1.

1115 MW 16, 1126 MW 2.

1117 MW 17.

1117 MW i

3.

1124 MW 18, 1083 MW i

l l

4, 1122 MW 19.

1117 MW l

5.

1118 MW 20.

1126 MW 6.

1119 MW 21.

1024 MW l

7 1123 MW 22, 1107 MW 8.

1124 MW 23.

1115 MW 9.

1077 MW 24, 1135 MW 10.

1112 MW 25.

1132 MW 11.

1117 MW 26.

1131 MW 12.

1113 MW 27, 1132 MW 13.

1113 MW 28.

1136 MW 14.

1126 MW 29.

1137 MW 15.

1128 MW 30.

1137 MW 31.

1137 MW j

INSTRUCTIONS On this form list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reperting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line.)

In such cases the average daily unit l

power output sheet should be footnoted to explain the apparent anomaly.

(p:\\95byrltrs\\950359.wpf/I l0895/11 )

l Report Pe;.iod: October, 1995 UNIT SHUTDOWNS / REDUCTIONS BYRON (UNIT 2)

No.

Date Type Hours Reason Method LER Number System Component Cause & Corrective Action To Prevent Recurrence NO SHUTDOWNS OR MAJOR REDUCTIONS FOR UNIT TWO l

Summary l

TYPE Reason Method System & Component I

l F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

& License Examination 9-Other (LER) File (NUREG-0161)

(p:\\95 byrttrs\\950359.wpf/110895/12 )

E.

UNIdUE REPORTING REOUIREMENTS (UNIT 2) for the month of October, 1995 1.

Safety / Relief valve operations for Unit Two.

VALVES NO & TYPE PLANT DESCRIPTION DATE ACTUATED A TUATION CONDITION OF EVENT l

None 2.

Licensee generated changes to ODCM.

None l

3.

Indications of failed fuel.

)

No.

Fuel Reliability Indicator:

FRI = 2.1 E-5 pCi/CC l

J (p:\\95by ritn\\950359.wpf/110895/13 )

i F._ LICdNSEE EVENT REPORTS (UNIT 2)

The following is a tabular summary of all Licensee Event Reports for Byron Nuclear Power Station, Unit Two, occurring during the reporting period, October 1, 1995 through October 31, 1995.

This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.

Occurrence Licensee Event Report Number Date Title of Occurrence None I

i l

(p:\\95 by rltrs\\950359.wpf/110895/14 )