ML20094K025

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Feb 1992 for Peach Bottom Atomic Station Units 2 & 3
ML20094K025
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 02/29/1992
From: Baron M, Miller D
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CCN-92-14031, NUDOCS 9203170347
Download: ML20094K025 (14)


Text

_.. - ~ _ . . . . _ _ . - . _ . . . _ _ _ _ . _ _ _ . _ -

_ . _ . _ _ - _ _ . _ _ _ _ _ _ _ _ _ . ~ _ _ . - . _ _ _ _ . _ . .

, CCN #92-14011 Pill!.ADEl. Pill A !!LI:C1' HIC COMi%NY ,

I'lxil BOr10M A10MIC l'OW i R $1AllON n D 1, los 208

(~ Jh Aijf Drita. I'rntwy h ania !?.411 nn eurtnia-ine rm in os a u s ain w a (*l7) ish *014 D. it. Milkr. Jr.

Yke Pre,ident Hatch 13, 1992 Docket Nos. 50-277 '

50 278 U.S. /4uclear 8:gulatory Commission Document Ct)ntrol Desk Washirgton, DC 20555 SUlljECT: Peach 130ttom Atomic Power Station Monthly Operating iteport Gentlemen:

Enclosed are twelve copics of the monthly operating report far Peach llottom Units 2 and 3 for the month of February 1992 forwarded pursuant to Technical Specification  ;

6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4.  ;

Sincerely, g nffb AfD Y ' %

DilM/AAl /TJN/DRM/MJI3: cmc En:losure ec: R.A. Ilurricelli, Public Service Electric & Gas T.M. Gerus~ky, Commonwealth of Pennsylvania

.J. Lyash, USNRC Senior Resident Inspector R.I. McLean, State of Maryland T.T. Mautin, Administrator, Region I, USNRC fl.C. Schwemm, Atlantic Electric C.D. Schaefer, Delmarva Power INPO Records Center cu m snc ,

en'cumgr 1 0 :) t$ t z R

o

NRC Monthly Operations Semmary Peach Hottom Atomic Power Station l'rbrvary 1992 UNIT 2 Unit 2 began and ended the month nominal 1(0% power with no major evolutions.

UNIT 3 f, nit 3 began the month at nominal 1[0% power. On February 7, gu,wer was re.luced to approximately 60% to conduct feedwater control rmxlification testing. Power was again reduced con February 8 to regenerate condensate drinincraliters. Both power reductions were of short duration aad power was restored without incident. Unit 3 completed the month at nominal 1(XI% power.

1 J

l CCO292.NRC

thxLet No. %-277 Attathinent to Monthly Operating Relxist for l'chtaary 1W2 UMELMil'LLIMLISB1MLUlON

1. Name of facility; l'each llottom Unit 2
2. Scheduled date for sicxt refuclitig shutdowri:

Itcload 9 Scheduled for September 5, tw2.

3. Scheduled daic for restart following refueling:

Rcstart following refueling forecast for November 20,1W2.

4. Will refueling or resumption of optration therefore require a technical specification thange or other license amendtnent?

No.

If answer is yes, what, in general, will these be?

5. Scheduled daic(s) for submitting proposed licensing action and supporting information:

N/A

6. Important licensing considerations awxiated with refueling, e.g., new or dif ferent fuel design or supplict, unreviewed desigit or performance analysis methods, significant thanges in fuel design, new operating procedutes:

N/A wmuc

Docket No, N1277 [

Attachment to Monthly Operating Ittlort fo 1%ruary 1912  ;

Page 2 i L!Slf_.LHlHildhilllDRitsllON (Continued)

7. The numter of fuel assemblics (e) in the core and (b) in the spent fuel storage pooh I

(a) Core 7o4 Fuel Assemblies (b) Fuel Pool . IWxi l'uct Assemblies,58 Fuel Itals  ;

8. The present lic nsed Spent fuel gwl storege capacity and the slic of any increase in licensed storage capacity that has been requerted or is planned, in number of fuct assemblies:

The spent fuel geol storage capacity has been relicensed for 3810 fuel assembucs.

9. The projected date of the last refueling that can be dinharged to the spent fuel pool assuming the present capacit):

September 2fKB without full core offload capability.

September IW7 with full core offload capability, CC0292.NitC

-w ,,--w,s -,,3-e4 ..,.~..,3 .,..y,,.w<,,,, m ,*,,, ,,.-. .-my,..,.,-.--- ,,- , ..- - - - - - , ,- , . , - . , -._m., , + - , - - - - , -

_,.,,,y -

.m, , ... , ,-.,r

- . . . . . - _ _ . . -. -.- . . . . ~ _ _ _ -.-.

i Diglet No. 50 2/8 Attachment tb Monthly Operating Report for I'cbruary IW2  ;

UNIr 3 RL111 LING INIORM ATION

1. Name of facilhy:

Peach flottom Unit 3 t

d

'4. Scheduled date for next refueling shutdown:

Itcload 9 scheduled for September 4,1W3 i

3. Scheduled date for restart folknving refueling (

licstart following refueling scheduled for October 29,1W3

4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

No-If answer is yes, what, in general, will the.se be?

N/A

5. Sc.heduled date(s) for submitting proposed licensing action and supporting information:

N/A-t

6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

N/A COU91NitC >

- n ~ , . . - , , ~ ,r-..-n..,. .--,.r. ,,.. , . ,-e- -,.,-.e,,, - n. . , 4 e r ,+ , -- \-

lhwket No. $0 278 Attachment to hionthly Opcrating  ;

l(eport for February 1992 ,

Page 2 UNIT 3 }EFUEl ING INFOR%f ATION (Continued)

7. The number of fuct assemblies (a) in the core and (b) in the spent fuel storage gxx>l:

(a) Core 764 fuel Assemblics (b) Fuct Pool 1689 Fuel Assemblics,6 Fuct Rods

8. The present licenv.1 spent fuel pool storage capacity and the r.ite of any increase in licensed storago capacity that has been requested or is planned,in number of fuel assemblies: ,

The went fuct pool storage capacity has been relicensed for M19 fuel assemblics.

9. The projected date of the last refueling that can be discharged to the spent fuel gxiol assuming the 4 present capacity:

September 2(MM without full core offload capability.

September 1998 with full core offload capability.

I 5

i CCO292.NRC l

Avit AGE 0Atti tihlt IWit Livil Do(Lil WO. 50 277 Uh11 PEACH BOfiDN UWil 2 Daft illlRUARY 15, 1972 COMiAkt IellAbitrNIA titC1RIC COMPAhf M. J. BARDW EUPIRV1504 RLF11$ GPOUP tt AtN B0110M ATOMit t'Mt $'! ATION ItttteSAC (717) 456 701 A EXf. 3321 Rah 1H ftBRUARY 1$12

t. A'JE R AGE D Alt Y PDst k L t VE L LiAY AVf R ALE DAILY PD9tt LEVEL (Mut.hti) (Ndt*Ntis 1 1071 17 1D62 2 1071 it 1071 3 1067 11 1063 4 1070 ft 1071 5 1075 21 1071 6 1070 22 1071 7 1070  ?! 1067 0 1070 14  ? O'e7 9 1070 i) 1071 10 1D66 26 1071 11 1D66 27 ID67 12 1070 IB 1071 13 1066 i9 1063 14 1066 15 1067 16 1075 l

1 1

__ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ . _ _ _ _ _ _ _ . _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _____m____ _ _ _ __

i i

AVIRAGE DAILT UN!I POWER ((Ytl Dottri No. 50 278 l 1

Uhli PLACH B0110M UWli 3 DATE flBRUARY 15, 1992 i 1

COMPAvf PHILADILPHIA LLECTRIC COMPAWT M. J. 8 ARON SUPERvtLOR REPDRil GROUP Pt ACH $0f f 0M ATOMIC POWER STATICW ftLtPHDh! (717) 456 7014 Enf. 3321 MONTH flBRUARY 1992 DAY AVERAGE DAILY POWER LivfL DAY AVERAGE DAltY PowtR dvil (HVE Wti) (MUC-WET) 1 1062 17 1070 l 2 1062 in ID66 3 1066 19 1D62 4 1062 20 1075 5 1070 21 1D62 6 1062 22 1071 7 988 23 1D67 8 75 2 24 1D67 9 994 25 1066 10 1D67 26 1D67 11 1D62 27 1D62 12 1Du2 28 1062 13 1D66 29 1D63 16 1058 15 1D66-16 1D66 f

- . . . . . ..- - - - - - - - _. -.. - - . . .-. - ~ . _ . - . .

OPERAflNG DATA REPDRf DOCKET NO. $0 277 DATE ffBRUARY 15, 1992

. COMPL(itD ST PN!LADtlPHIA [llCTRIC COMPANY i M. v. RARON SUPLRVISOR Rf POR f D Ct0VP PI ACH B0110M Af 0MIC POWER $1Atl0N f((fPHON! (717) 4$6 7014 Exi. 3121 OrtKAflN3 $TATUS

1. UNif NAME: P(ACH $0110M UNIT 2 NOTES:
2. R[ PORTING PERIOD: f!BRUARV,1992
3. LICEN$tt THtkMAL POWER (MWT): 3293
4. NAMEPLATE RAf!Ny (CROSS MUI): 1152

$. DESIGN tl[C1RICAL RATING (NE1 MWE): 1D6$

6. MAXIMUM DIPENDABLE CAPAClif (Gross MWE): 1098
7. MAKINRM DfPINDABLE CAPAtlif (NET MWE): 10$$
8. If CHANGES OCCUR IN Capacity RAtlNGl (ItRN3 NULBER 3 THROUGH 7) SINCE LAll REPDki, GIVE REASON $r
9. POWER ttVEL 10 WHICH RESTRICi[D,17 ANY (NET MWI):
10. Rf A$0NS 70R RISTRICTIDNS, IF ANY:

l YHl$ MONTW TR*TO DAIE CUMULAllVE

11. HOURt IN REPORilNG PERIOD 696 1,440 154,776
12. NUMUER OF HOUR $ REACTOR WAS CRlilCAL 696.0 1,440.0 93,694.0
13. REACfDR RE$tRVE SHUfDOWN HOUR $ 0.0 0.0 0.0
14. HOURS GENERAIDR CN LINE 696.0 1,440.0 90,2T7.$
15. UNii RE$FAVE SHU1DOWN HOUR $ 0.0 0.0 0.0
16. Ghots THERHAL ENERGY GENERAf tD (MWM) 2,279,928 4,699,392 267,219,121
17. GROSS CttCTRICAL tutRGY GENtRATED (WWH) 764,300 1,$76,000 87,864,$90

( ............ ............ ............

~ 18. NI1 ELECTRICAL ENERGY GENERAf tD (MWH) 743,908 1,$32,610 84,149, B43 PAGE 1 0F 2 l

l l

"~ 9- ~ w -eam' g#- y :em w -# y,r-- r -Wt7

l i

OPikAlthG D AT A RtPORT (CONllNUID) D0Catt w3. 50 277 DATE ft3RutkY 15, 1972 THit We'M 1R*10 DAf t CUMul. Al l VE

19. Uhlt ittvlCT FACfDR 100.0 100.0 58.3
20. UNIT AVAll AllllIV F ACf Dk 100.0 100.0 08.3
21. DNIT ChaAC111 F AC108 (U$ LNG MDC NET) 101.3 100.9 $1.$ J

. .......... .......... . ...... .. . I

22. UN11 CAFACITY F ACfDR (USING DER Nti) 100.4 99.9 31.1 ,)
23. UNil IDRCtD uuf Act RATE 0.0 0.0 14 ( ,_
24. SHUTDOWNS $CHEDVl[D DYER NEXT 6 MONTH $ (1YPE, DAlt, AND DURAflDN Of LACH):
25. If 5HU100VN A1 EWD OF IEPCFI Pf al00, ($ilMATLD DAf t (F $1 ARTUP: N/A
26. UNil$ IN f tti STAIU$ (PRIDR 10 COMMERCI AL DOERATIDN): I DRLCASI ACMit\tD INiilAL CRITICAll1Y D9/16/73 IWlilAL titCIRICIII 02/18/74 CDMMERCIAL 00ERAllDN 07/05/74 PAGE 2 0F 2

_ - - - . - - _ _ _ . - . - - _ . ~. . - - . . . - -. _ _ . _ _ - _ _ - . _ .-

CFf RAtlkG DAT A RfPORI DDCKtt NO. 50 278 Daft ifBRUARY 15, 1992 C09PLtitD BY PHILADELPHIA ElfCTRIC COMPANY l

.... ........................ l M. J. BARON i

$UPERVISOR I RLPORib GROUP l Pf ACH B0110M ATOMIC POWER $f All0N ItLIPMDNE (717) 456 7014 Ext. 3321 OPERA 11NG STATUS

1. UNIT WANE: PIACH B0110M UNIT 3 hott$s
2. REPGRTING PERIDO: f t BPUARY,1992 l

.................. ........ l

3. LICENSED THERMAL POWER (M.It): 3293 l i

i 4, kAMEPL Ait RAllNG (Gross MWE): 1152 5, DitlGN titC1FICAL RAi!NG (Nti MVE): 1065

6. MAXIMUM Of *tNDABLE CAPAtif (GROSS MW): 1098
7. MAXIHUM Of9tL)A8tt CAPAC ff (Nt" MWE): 1035
8. IF CHANGE $ DCCUt lW C8FACllY RAllNG$ flitMt NUMatt 3 fHeauce 7) stNCE LAsi REPORT, flVE REAS0kt
9. POWER LitTL U WICl; RtliRICTCD, if ANY (NET MWE12 10 Rf4tcNS FOR RistRICTIONS, IF Ak's

!!t T Hl N M'W T N TR+f0 Daft CLMUL ATIVL

11. HOP 43 IN REP 0& TING Fttlup 696 1,440 150,672 696.0 1,413.6 91,775.7
12. WUMBER OF Houd3 REAC10A VA$ /RITJC/L ............ ..... ......
13. ht4Ct0A RtsrRyt &HU'00WW h0U95 0.0 0.0 0.0 996.0 1,237.4 68,542.4
14. HauRS GL'NERAf DR ON LIN[ ............ ........ ...

0.D J.0 0.0

15. UN!! RE$lRVE EkUTDOWN HusRS ........ ,.. ............

2,248,368 3,437,232 259,531,162

16. CROSS THERHAL ENERGT CEktRATED (WWH) ............ ............

l ............

750,300 1,14 7,80G 85,150,332 i7. GROS $ EL(CTRl CAL thERGY GENtkA1CD (HWH) ............ ............

............ +

L 736,163 1,113,372 81,596,389

18. NET ELECTRILAt iNERGY GthtRAi!D (HWW) .. .. ...... ............

Pact 1 of 2 1

i

\

i i

l.

i

, .e

1 OPIRAf thG DAT A RIPORT (CtmilNd(D) D0ct.11 40, 50 278 Daft itBkuARY 15, 1992 1Hi$ KATH YR*10 DAlf CUMULAllVI

19. UNif $ttVICE fAC10R 100.0 85.9 58.8
20. Uutt AvalLAntLity FACfDR 100.0 85.9 58.8
21. UNIT CAT Atlif FActDR (UllWG MDC kti) 101.4 74.7 52.3
22. UNIT CAPACl1Y F ACf DR (U$lWG Dtt klf) 98.5 72.6 50.4
23. UN11 FORCED OUTACC RATE 0.0 1.0 12.6
24. $NU1 DOWNS SCHfDUttD DVER NEXT 6 H3Nih$ ( MF-E, Daft, AND DURA 110W Of EACH1
25. If SHuiuoWW A1 (ND Of REPDAT PER100, E$11MAf t0 DAf t OF STARTUP: h/A
26. UNiil IN TElf $1kTUS (PRIOR 10 COMMERCI AL OPERAflDN): IDRECA$1 ACHitVID INiilAL CRiflCALITY 08/07/74 IN111AL ELECTRIC!TV 09/01/74 l

.... .. .. ..... \

COMMERCIAL OPERAtlDA 12/23/74 '

N PAGE 2 0F 2 1,

--- -.- - - - _ _ _ __ - . _ m.. __ _m , __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ , _ , _ _ _ ,,

e r

L i

UNIT SHUfDOWNS AND POWER REDUC 110NS DOCKET NO. 50 277 UNIT NAME PEACH B0110M UNif 2 DATE FEBRUARY 15, 1992 REPORT MONTH FEBRUARY, 1992 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR RlPORTS CROUP PEACH $0ff0M ATOMIC POWER stall 0N TELEPHONE (117) 456 7014 Erf. 3321 ME T HOD OF LICENSEE SYSTEM COMPONENT CAUSE AC CORREC11VE TYPE DURAfl0N REASON SHUTilNG DOWN EVENT CODE CODE ACil0N TO

00. DATE (1) 00URS) (2) REACTOR (3) REPORT # (4) (5) PREVENT RECURRENCE (1) (2) (3) (4)

F FORCED REASON METHOD EXHIBIT G INSTRUCTIONS S - SCHEDULED A EQUIPMENT TAILURE (EXPLAIN) 1 MANUAL FOR PREPARAfl0N OF DATA B . MAINTENANCE OR TEST 2

  • MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C REFUELING 3 AU10MAflC SCRAM. EVENT REPORT (LER)

D REGULATORY RESTRICil0N 4 OTHER (EXPT AIN) FILE (NUREC-0161)

E . OPERATOR TRAINING + LICENSE EXAMINATION F

  • ADMINISTRATIVE (5)

G OPERATIONA. ERROR (ERPLAIN)

H - OTHER(EXPLAIN) EXHl81T I SAME SOURCE

. . _ _ _ . . _ _ _ _ = _ _ _ . . _ - . _ _ . _ _. . _ . _ _ _ _ _ . . _ _ . _

UNIT SHUTDOWNS AND POWER REDUCTIONS DoctEi No, 50 - 278 UN!i NAME PEACH Boff 0M UNIT 3 DAi! FEBRUARY 15, 1992 REPORT MONTH FEBRUARY, 1992 COMPLEf ts BT PHILADELPHI A ELECTRIC C(MPANY M. J. BARON

$UPERVISOR REPORi$ LROUP PEACH B0ff 0M ATEMIC POWER $1 Ail 0N TELEPHONE (717) 456 7014 EXI. 3321 METHOD OF LICENSEE SYSTEM CEMPONENT CAU$E AND CORREC71VE TYPE DURATION REASON SHUitlNG DOWN EVENT CODE CODE ACTION TO No. DATE (1) (HOURS) (2) REACTOR (3) REPORT # (4) (5) lPREVENTNECURRENCE G 920207 $ 0.0 H 4 N/A CH HTEXCN FEEDWATER LEVEL CONTROL TEsilNG 9 9202D9 F 0.0 A 4 N/A WC DEMINX REGENERATE CONDENSATE DEMINS.

I t1) (2) (3) (4)

F

  • TORCED RFA$0N METROD EXHI8li C INSTRUCil0NS

$ * $CHEDULED A E00lPMENT FAILURE (EXPLAIN) 1 MANUAL FOR PREPARA110e! 0F DATA 9 MAINTENANCE OR TEST R MANUAL SCRAM. ENTRY $NEEl$ FOR LICENSEE C RETUELING 3 AUTOMATIC SCRAM. EVENT REPORT (LiR)

D REGULATORY RESTRIC110N 4 - OTHER (EXPLAIN) FILE (NUREG 0161)

E . OPERATOR TRAINING

  • LICENST EXAMINATION f - ADMINISTRATIVE (5)-

G OPERAil0NAL EK10R (EXPLAIN)

H

  • OTHER(EXPLAIN) EXHlBIT I SAME SOURCE 1

. . . _ - ~ - - ,. -. . .- . .- .-. -. - - ,