Correction to Amends 90 & 84 to Licenses NPF-35 & NPF-52, Respectively.Ts Pages 3/4 6-14 Changed Due to Administrative Oversight
ML20094J273
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 03/09/1992
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20094J274 List:
References
NUDOCS 9203120270
Download: ML20094J273 (1)


Text

_;

CONTAINMENT SYSTEMS ANNULUS VENTIL.ATION SYSTEM LIMITINGCONDQ10NFOROpfRATION 3.6.1.8 Two independent Annulus Ventilation Systems shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTION:

a.

With one Annulus Ventilation System inoperable for reasons other-than l

the pre heaters tested in 4.6.1.8.a and 4.6.1.8.d.$. restore the inoperable syttem to OPERABLE status within 7 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 tours.

b.

With the pre-heaters tested in 4.6.1.8.a and 4.6.1.8 d.S inoperable, restore the inoperable pre heaters to operable status within 7 days or file a Special Re) ort in accordance with Specification 6.9.2 within 30 days specifying. tie reason for-inoperability and the planned ac-tions to return the pre-heaters to operable status.

1 SURVEILLANCE REQUIREMENTS

^

4. 6. L 8 Each Annulus-Ventilation System sham be demonstrated OPERABLE:-

a.

At least once per t days on a STAGGERED TE4T BASIS by initiating, i

frofr the control room, flow through the HEPA filters and activated carun adsorbers and verifying that the system operates for at least 10 continuot.s hours with the pre heaters operating; b.

At least once per 18 months or (1) after any structural maintenance an the HEPA filter or activated carbon adsorber housings, or (2) fol-lowing painting fire, or chemical release in any ventflation zone communicatingwIththesystemby:

1) Verifying that the cleanup system satisfies the in place per.e-tration and bypass leakage testing acceptance criteria of less than 15 (Unit 1), 0.05% (Unit 2) and uses the test procedure quidanck in Regulatory Positions C.S.a. C.S.c. and C.S.d* of Regulation Guide 1.52, Revision 2, March 1978, and the system flow

-rate is 9000 cfm : 10t; tn

>;;'g

2) Verifying, within 31 cays after removal, that e laboratory analy.

oon sis"*.of a representative activated carbon sample obtained in I

88, accordance with Regulatory Position C.6.b of Regulatory Guide 1.52, pg Revision 2, March 1978 and tested per ASTM D3803-89 has a methyl iodidepenetrationoflessthan4%;and ts u gg

3) Verifying a System flow rate of 9000 cfm t 10% during system ru operation when tested in accordance with ANSI N510 1980.

.r$

  • Tle requirement for reducing refricerant concentration to 0.01 ppm may be shtisfied by operating the system for 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> with heaters on and operating.

CATAWBA - UNITS 1 & 2 3/4 6 14 Amendment No. 90 (Unit 1)