. Con.wnonweasith EEdison n=ra arme Nas<ervas masa. com a % meczte
- (
Addreds Mesow to #oWruce con 757 Crucago, in.nois 6Covro August 3 1984 M r.- Jammu Q.
Mappler ROQ1onal Acministrator U.S.
Nuclear Regulatory Corami s sio n Region III 7 9 9.1 R o o m ee v w i t Romd Glen _C11yn, IL 60137 1
Subjects LaSalle County Station Unit 2 Supplemental Raponsa to Inspection Report No.-
50-374/84-04 NRC nocket No.
50-374 Reforunows (a)s-W.. S. - L. it t l e letter.to Cordell Reed dated April-24, 1984.,
.(b)s.
D.
L'.
Farrar 1sttar to'J.
C.
Kapolor:
dated:May 22 and June 1A, 1 *> $ 4.
Dear Mr.
Kapplers
- -A-meeting was held at Region III b etwarun Coctmanwe.s ith Edison personnel-and. Messrs.
M.
Walker.
W.
Guldemond. c.-Williams, et.
al.
Of your staff.-
During this meetingdCCommonw=mith ' Edison proposed an.
citernative metnod to satisfy the N requirement containuo in item.
' O. Cr of reference (a).
This letter documents our commitment mode Curing that meeting..
.- 1.
Last11e County Station will incorportte into. administrative
- orocedures cautions-etating.the col.cs or control indicating-ligh ts - haver - been changed - in ' the field to implement the " green.
-Doord"' concept and may.-not match the colore-shown:on ormwings.
2.
' Administrative oroneouram governing modifications, work requesta,.and post maintenance testing will be revised to-include-the cautions necessary.'to prevent inadvertant compromise of green board concept due possible-oirrorences in control light color--arrangements shown on drawings.
3..
The' green board'ocncept and the resulting deviation"from' control Tlight. color arrangements shown on drawings.will be included in en annual. operator training module.and in_the-station retraining program.
- c. '
The above!commJ.tments-are appliamble to 1us.alle County station and'to any other CECO Nuclear-- Generating Station-which alwots t o' implement the green board concept without revision or approprince idrawing control light color arrangemento.
- N'llt 1&_
a
.__w 140169'S40809-e ADOCK 05000374
'l
.- G :
g;
- - =.
2 -
August 3,
1964-0..O.
Keppler.
We expect.to complete the above procudure and trcining
. program ruvicions by October 1,
1984.
If y o u h a v es aa ny ouestions regarding this in t t t e r,. o l e n s o contact this offica.
Very truly 'yours,
/
Q -.. _-.
D.
L.
Ferrar Director of Nuclear Licensing j
- 1:n '
tr O15 N j
O ' ' ',73
_s
[O [ One First Nation 11 Plaza. Chicago. lilinois N Commonwealth Edison V"-
/
O ] Address Reply to: Post Office Box 767
/ Chicago, lilinois 60690 '
August 3, 1984 Mr. James G. Keppler Regional Administrator U.S. Nuclear Regulatory Commission Region :III 799. Roosevelt Road Glen Ellyn, IL 60137 Sub' ject:
LaSalle County Station Unit-2 Supplemental Reponse to Inspection Report No. 50-374/84-04 NRC Docket No. 50-374 References (a):
W. S. Little letter to Cordell Reed dated April 24, 1984.
(b):.
D. L. Farrar letter to J. G. Keppler dated May 22 and June 14, 1984.
Dear Mr. Keppler:
A meeting was held at Region III between Commonwealth Edison personnel and Messrs. R. Walker, W..Guldemand, C. Williams, et. al.
of your staff.
During this meeting, Commonwealth Edison proposed an alternative ~ method to satisfy the NRC requirement contained in item 2.C of reference (a).
This letter documents our commitment made during that~ meeting.
'l.
lLaSalle County Station will-incorporate into~ administrative procedures cautions stating the1 colors of control indicating-lights have been changed in the field to implement the " green board" concept and may not match-the colors'shown on-drawings.
2.
' Administrative procedures governing-modifications, work requests,-and post maintenance testing will be revised--to
-include the; cautions necessary to prevent inadvertant. compromise of. green board concept due possible differences in control light
. color arrangements shown on drawings.
3.
.The green board concept.and'the resulting deviation from control light color arrangements shown on. drawings will be included in an. annual operator training module and in.the station retraining.
program.
4.
The above commitments are applicable'to LaSalle County. Station.
Land to any-other CECO Nuclear Generating Station.which elects to implement the green board ' concept without revision of appropriate drawing control light color arrangements.
AUG 8 L994
..a w
s
~
J. G. Keppler
.2 -
August 3, 1984 iWe expect.to complete the above procedure and-training:
' programirevisions by October 1, 1984.
If'you have.any questions'regarding this. matter, please contact thisLoffice..
Very;truly yours,
.-+'
A m
3 _
-D.~L.
Farrar-Director of Nuclear Licensing 11m:
9015N 4
d '
+
m.-
..,.. _.. _. _ _ _ _ _.., _ - _. _. _. -..., _... _, _